1
Restoration Preservation Masonry, Inc. V. Grove Europe, Ltd.
2
Accident Site - Longwood Towers 20 Chapel Street, Brookline, MA
3
Building B Accident Site - Longwood Towers 20 Chapel Street, Brookline, MA
4
Building B Accident work area in southeast corner
5
Building B Accident work area in southeast corner
6
Building B Accident work area in southeast corner
7
Accident work area in southeast corner - Perspective View
8
Construction project involved removal of bricks and bull-nose water stone because of water infiltration and leakage issues.
9
Work area is approx. 80’ above the ground 80 feet
10
Southeast corner perspective Work area
11
Access Satellite scaffolding set-up
12
Chassis assembly Main platform Outriggers
13
Mast goes up in sections Access Satellite scaffolding set-up Mast attached to building with wall ties
14
Access Satellite scaffolding set-up platform extension 1 platform extension 4
15
Access Satellite scaffolding set-up platform extension 5 platform extension 2
16
Access Satellite scaffolding set-up platform extension 3 platform extension 6
17
Cantilever extensions (5) cantilever extensions (5) Access Satellite scaffolding set-up
18
Cantilever extensions - left side
19
Three different cantilever extension designs used on left side
20
Three different cantilever extension designs 7’ 8.75” 4’ 11.4” 8’ 2.2” sliding extensions
21
Access Satellite scaffolding set-up Planks set on top of cantilever extensions
22
Access Satellite scaffolding set-up plywood sheets set on top of planks
23
Planks and plywood Access Satellite scaffolding set-up
24
Guard railings Access Satellite scaffolding set-up
25
Scaffolding rides up mast
29
View from below
30
View from above wall ties
31
View from above
35
Area represented by scale model
36
Accident Sequence
37
Areas where bull-nose water stone was previously removed
38
Pieces are cut from bull-nose water stone approx. 5 feet from top of wall to plywood
39
Cut stone is moved to platform extension #1
40
Scaffolding collapses
41
Post-accident photos
42
Right side of Access Satellite platform post-accident platform extensions 4, 5 & 6 main platform Cantilever extensions covered with planks and plywood mast
43
Post-accident photo
47
END