MAINTENANCE RATING PROGRAM Allen Mattox District Five Technical Support Manager
2
MRP HISTORY Legislative Request Task Team First Survey 1985 / 86
3
3 SURVEY PERIODS / YEAR JULY - OCTOBER NOVEMBER - FEBRUARY MARCH - JUNE
4
WHAT IS MRP? A visual and mechanical evaluation of routine highway maintenance conditions. It is a report card for maintenance
5
Purpose of MRP To provide information that should be used to schedule and prioritize routine maintenance activities. To provide uniform maintenance conditions that meet established Departmental objectives.
6
FACILITY CLASSIFICATIONS Rural Limited Access Rural Arterial Urban Limited Access Urban Arterial 30 Points are surveyed for each Facility Type.
7
ELEMENTS Roadway Roadside Traffic Service Drainage Vegetation/Aesthetics
8
ROADWAY Characteristics Flexible Pothole Flexible Edge Raveling Flexible Shoving Flexible Depression/Bump Flexible Paved Shoulder/Turnout Rigid Pothole Rigid Depression/Bump Rigid Joint/Cracking Rigid Paved Shoulder/Turnout
9
ROADWAY Flexible PotholeFlexible Edge Raveling Flexible Bump / Depression Flexible Shoving Flexible Paved Shoulder Turnout
10
ROADWAY Rigid Joint / Cracking Rigid Depression/Bump Rigid Turnout
11
ROADSIDE Unpaved shoulder Front slope Slope pavement Sidewalk Fence
12
ROADSIDE Unpaved ShoulderFront Slope Slope PavementSidewalk Fence
13
TRAFFIC SERVICES Characteristics Raised Pavement Markers Striping Pavement Symbols Guardrail Attenuator Signs <= 30 sq. ft. Signs > 30 sq. ft. Object Markers and Delineators Lighting
14
TRAFFIC SERVICES Characteristics RPM’S Striping Pavement SymbolGuardrail
15
TRAFFIC SERVICES Characteristics Signs > 30 SF Attenuator Signs <= 30 SF Lighting Object Markers & Delineators
16
DRAINAGE Side/cross drain Roadside/median ditch Inlets Miscellaneous drainage structure Roadway sweeping
17
DRAINAGE Characteristics Side drain Roadside/Median ditch Outfall ditch Cross drain
18
DRAINAGE Characteristics Misc. Drainage StructureInlet Roadway sweeping
19
VEGETATION AND AESTHETICS Roadside mowing Slope mowing Landscaping Tree trimming Curb/sidewalk edge Litter removal Turf condition
20
VEGETATION AND AETHETICS Slope MowingRoadside Mowing Tree Trimming Landscaping
21
VEGETATION AND AETHETICS Curb/Sidewalk Edge Litter Removal Turf Condition Curb/Sidewalk Edge
22
WHAT DOES THIS MEAN TO ME? WHAT IS MY ROLE IN THIS?
23
As an inspector, your job is to make sure the contractor follows the plans and specifications.
24
MRP criteria is based on the Roadway and Traffic Design Standards. As long as you are following these standards, we will pass MRP.
25
Don’t get caught up in things you cannot control, such as plan design. We can get exceptions for these issues and not be scored on them. Follow the Standards and Specifications.
26
Drop Off at Call Box
27
Debris
28
SIDEWALK
29
Pothole/Debris
30
GUARDRAIL
31
TURF CONDITION
32
FENCE
33
FRONT SLOPE
34
SIGNS
37
MISCELLANEOUS
39
http://www.dot.state.fl.us/statemaintenance office/MaintRatingProgram.shtm
40
QUESTIONS?