1 CouncilUpdateJan702pet104i2-6069.ppt ELLIS CREEK WATER RECYCLING FACILITY, PETALUMA, CA North Bay Watershed Association December 7, 2007
2
dw1007cwea.ppt/2 Existing Wastewater Treatment Facility u Two treatment plants u 950 Hopper Street First built 1938 First built 1938 Preliminary, Primary, Secondary Preliminary, Primary, Secondary u 4400 Lakeville Highway Built 1972 Built 1972 Secondary, Disinfection Secondary, Disinfection u Capacity ADWF = 5.2 mgd Current flow = 4.5 mgd (86%) Current flow = 4.5 mgd (86%)
3
dw1007cwea.ppt/3 Hopper Street Ox. Ponds 36” Force Main Pet600xi1 3
4
dw1007cwea.ppt/4 Hopper Street WWTP Pet600xi1 Sedimentation Tank (1937) Trickling Filter (1937) Trickling Filter (1953)
5
dw1007cwea.ppt/5 Recycled Water u Treated water released to Petaluma River November – April u Recycle May – October u 2 golf courses, vineyard, 700 acres agricultural land u Recycle 700 mg/year (35% of influent)
6
dw1007cwea.ppt/6 Need for New Facility u Increase capacity to 6.7 mgd u Meet increasingly strict regulatory requirements u Improve reliability u Produce tertiary recycled water Irrigate areas dependent on potable water Irrigate areas dependent on potable water Locally controlled water supply Locally controlled water supply
7
dw1007cwea.ppt/7 Existing Lakeville Site
8
dw1007cwea.ppt/8 Pond 9 Pond 10 Pond 8 Cypress Entrance Salt Marsh Harvest Mouse, Mud Flats, Rail Habitat and Wetlands Exclusion Clapper Rail Habitat Rookery Tree Ellis Creek Riparian Corridor Farmhouse and Outbuildings Trees Between “Mouse Head” and “Mouse Body” Ponds-Potential for Nesting Raptors Non-Tidal Portion, Potential for CRLF Environmental Features
9
dw1007cwea.ppt/9 Farmhouse
10
dw1007cwea.ppt/10 Jurisdictional Wetlands
11
dw1007cwea.ppt/11 Design Flow Schematic
12
dw1007cwea.ppt/12 Wetlands Flow Schematic Note: Wetlands are treatment units, not waters of the state From Pond 7 Pond 10 TreatmentWetlands AGReuse RiverDischarge PolishingWetland Cell C PolishingWetland Cell B PolishingWetland Cell A Cl 2 De Pond 9 TreatmentWetlands ChlorineContact Cl 2 (during reuse periods)
13
dw1007cwea.ppt/13 Overall Site Plan
14
dw1007cwea.ppt/14 WRF Site Plan
15
dw1007cwea.ppt/15 Overall Landscape Plan
16
dw1007cwea.ppt/16 Site - Trails
17
dw1007cwea.ppt/17 Landscaping as Art
18
dw1007cwea.ppt/18 Wetland Cell D
19
dw1007cwea.ppt/19 Construction Costs Construction$110,329,000 Construction Management $10,230,000 Engineering Services $4,355,000 Environmental Services $1,435,000 Programming$2,341,000 Contingency$10,295,200 Total$138,986,000
20
dw1007cwea.ppt/20 Funding u Line of credit – jump start project u State Revolving Fund loan - $125 million (program was dormant for 2 years!) u State Coastal Conservancy - $2 million u Sonoma County Agricultural Preservation & Open Space District - $2 million
21
dw1007cwea.ppt/21 Utility Investment Program u January ’07 Council adopted 5-year investment program for water & wastewater utility u Rates are competitive with other Sonoma County communities
22
dw1007cwea.ppt/22 Outreach Notices to all property owners & utility customers u Hotline for rate questions u 4 public meetings u Advertisement in local newspaper u Mailer to all customers
23
dw1007cwea.ppt/23
24
dw1007cwea.ppt/24 Construction Update u Contractor NTP October 2005 (Corps permit rec’d day before) u Start Up Scheduled September 2008 u Completion June 2009
25
dw1007cwea.ppt/25 Construction Team u Engineer – Carollo Engineers u Construction Manager – The Covello Group u Environmental – ESA u Programming – ArcSine Engineering u Contractor – Kiewit Pacific
26
dw1007cwea.ppt/26 Overall Site - October 2007
27
dw1007cwea.ppt/27 Operations, Lab, Maintenance and Administration Building u LEED Silver Rating u Daylighting u Sun Shading
28
dw1007cwea.ppt/28 Operations, Lab, Maintenance and Administration Building
29
dw1007cwea.ppt/29 Administration Building – Green Roof
30
dw1007cwea.ppt/30 Headworks-Oxidation Ditch- Secondary Clarifiers-Solids Handling
31
dw1007cwea.ppt/31 Oxidation Ditch
32
dw1007cwea.ppt/32 Secondary Clarifier
33
dw1007cwea.ppt/33 Tertiary Treatment / Administration
34
dw1007cwea.ppt/34 Tertiary Treatment / UV Disinfection
35
dw1007cwea.ppt/35 Recycled Water Reservoir
36
dw1007cwea.ppt/36 Architectural Features – Filter Support Building
37
dw1007cwea.ppt/37 Architectural Features – Main Electrical Building
38
dw1007cwea.ppt/38 Polishing Wetlands
39
dw1007cwea.ppt/39 Polishing Wetlands
40
dw1007cwea.ppt/40 Polishing Wetland Cell B
41
dw1007cwea.ppt/41 Ellis Creek Marsh / Wildlife Sanctuary
42
dw1007cwea.ppt/42 Shollenberger Trail
43
dw1007cwea.ppt/43 Questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.