ER-2 Briefing
2
ER-2 Specifications
3
ER-2 Typical Flight Profile
4
ER-2 Loiter Time (based on 8 hr mission) - Operations depart from and return to PMD
6
ER-2 Basic Configuration
7
Inside Nose looking Forward Fixed Nose Looking Aft ER-2 Payload Areas: Nose Area
8
Forebody inside looking forward Aftbody side view ER-2 Payload Areas: SuperPod Fore and Aftbody
9
Forward Midbody looking Aft Lower Midbody looking Up and Aft ER-2 Payload Areas: SuperPod Midbody
10
Internal Q-Bay looking Up and Aft Aft Q-bay Forward Q-Bay ER-2 Payload Areas: Q-Bay
11
ER-2 Payload Areas: Q-Bay Hatch Designs Pressure Box Mount Dual Window Hatch
12
Open Port With Fairing Panoramic Window Hatch ER-2 Payload Areas: Q-Bay Hatch Designs
13
ER-2 Payload Areas: External Pods Centerline Pod System 20 Pod
14
ER-2 Electrical/Control Interface Experiment Control Panel Experiment Interface Panel
15
Airworthiness Process Overview For New Instruments 15 ASP Programmatic Requirements Science Operations Flight Request System (SOFRS) Cost Estimate Approved Flight Request Funding AFRC Airworthiness Requirements Required before first flight for all new or modified instruments Results in an approved Flight Request Payload Integration Planning – Instrument Design and Analysis ER-2 Handbook http://www.nasa.gov/centers/dryden/pdf/90464main_ER2handbook.pdfhttp://www.nasa.gov/centers/dryden/pdf/90464main_ER2handbook.pdf – Upload and Check-out – Combined System Test – Engineering Check Flights – Science Flights
16
ASP Programmatic Requirements Process Overview 16 Airborne Science Program (ASP) Flight Request Science Operations Flight Request System (SOFRS) https://airbornescience.nasa.gov/sofrs/ https://airbornescience.nasa.gov/sofrs/ Project Cost Estimate Flight Hour Cost - $3500/hour with SMD approval Mission Peculiar Cost (MPC) Labor Overtime Travel Integration Cost Logistics Science Mission Directorate (SMD) Approval Funding at AFRC
17
AFRC Airworthiness Requirements Process Overview 17 Technical Briefing Independent peer review of project goals and plans Key Elements Overall Project Objectives and Responsibilities Payload Design and Analysis Structural Analysis Electrical Interface Weight and C.G. Flight Plans and Operations Mission Profiles Aircrew Checklist and Procedures Hazards Analysis Flight Request Required before first flight for all new or modified instruments Results in approved Flight Request
18
Payload Integration Planning Process Overview 18 Major Tasks and Timeline Technical Interchange Meeting Instrument Design and Analysis Periodic Design Reviews Electrical Interface Design Loads Analysis Upload Instrument and Checkout Two to three weeks before first flight Weight & Balance Verify Electrical Interface Install instrument in aircraft Installed system checks Technical Brief Typically two weeks prior to first flight AFRC Approved Flight Request
19
Payload Integration Planning Process Overview 19 Major Tasks and Timeline (Continued) Combined System Test (CST) On aircraft engine running system checks Verify instrument operation and procedures Day prior to first flight Engineering Check Flights Typically 10 to 15 hours depending on complexity of instrument Time to ascend and descend is ~ 1.4 hours, so by example … 3-hours of data collection would a require 4.4 hours mission Standard Crew Duty Day is 9-hours Supports up to 5-hours mission without over-time Defined mission profiles Pilot Procedures and Checklists Science Flights Separate SOFRS Request and Funding