BTEC Unit 29 – Lesson 02 Preparing to Change
4/15/2017 BTEC Unit 29 – Lesson 02 Preparing to Change Mr C Johnston ICT Teacher
2
4/15/2017 Session Objectives Understand the requirements in preparing for a software installation and upgrade,
3
You may install or upgrade your software
4/15/2017 Preparing for Change If after careful consideration and the benefits out way the costs then change can go ahead…. You may install or upgrade your software HOWEVER
4
Need to Plan1… Installation or Upgrade? Sequence of Activities
4/15/2017 Need to Plan1… Installation or Upgrade? Sequence of Activities Check system requirements Decide if upgrade or install Check installation media Decide install location – physical and logical Define the installation sequence Materials Need to ensure you have the correct equipment, media, installation guides license keys, Timing of Change Need to plan when the install or upgrade will take place… ensure enough time…
5
4/15/2017 Need to Plan2… Communication Procedure – who needs to be informed and when… End users – downtime, problems, training Management – downtime, when can make use, problems Software vendors - any problems, bug fixes, license key - need to plan how to get in contact incase it goes wrong Backout Procedures How can you roll back if it goes wrong? Ghost machine before hand / when can back out / uninstall facilities, Required access rights Security rights, File permissions
6
Need to Plan3… Training to end users Reporting Procedures
4/15/2017 Need to Plan3… Training to end users Need to provide guidance on how to use the software initial Reporting Procedures How to resolve more major issues - what is the procedure
7
4/15/2017 M2 Evidence Produce a report which explains explain the requirements in preparing for a software installation and upgrade, Cover all the points within slides 4-6, M2 – Explain the requirements in preparing for a software installation and upgrade For M2, you must explain the requirements in preparing for a software installation and upgrade remember explain means you need to give a reason why the point is important, A report explaining the processes which you should consider before carrying out an installation or upgrade will meet this criterion. What is each task about Different ways of doing the task Why should the task be planned What happens if we don’t plan the task BTEC Book – Unit 29 pp8-12
8
Practice Installation Plan
4/15/2017 Practice Installation Plan In groups, using the heading on slides 4-6 produce a plan for upgrading Macromedia Dreamweaver v8 to Adobe Dreamweaver CS4. Think about methods which can be used to protect data and back out of the installation.
9
You only need to plan for the install of one package
4/15/2017 P3 – Installation Plan Using the points on slides 4-6 as headings prepare an installation plan for upgrading a virus checker to a fully integrated security package on a HP 5700 machine, Fully integrated security packages available are: AVG Internet Security 2013 Kaspersky Internet Security 2013 McAfee Internet Security 2013 Norton Internet Security 2013 Using the points on slides 4-6 as headings prepare a second installation plan for installing Apache Open Office v3.4 or Libre Office v4 on a HP 5700. For the award of M3 and M4 you must include procedures to preserve data and back out of the software upgrades You only need to plan for the install of one package
10
P3 – Plan an installation and an upgrade.
4/15/2017 P3 – Plan an installation and an upgrade. M3 - Design and implement a procedure to preserve data integrity during an upgrade. M4 - Design a procedure to back out of software upgrades. P3 requires you to plan an installation and an upgrade. Plan should include all the elements identified in the unit content and be realistic enough to be used by someone to perform the installation or upgrade if you are not available. M3 and M4 require learners to produce procedures which should be robust and realistic. M3 requires your plan to include a method of keeping the data already on the target hard drive integral, M4 requires your plan to include a method to back out of the installation / upgrade process.