1 EPA Region 6 Dallas, Texas EPA Region 6 Dallas, Texas

2 2 Mike Bira USEPA Region 6 NPS Program bira.mike@epa.gov 214-665-6668 EPA Perspectives In Watershed Planning DRAFT

3 Clean Water Act (CWA) Federal law promulgated in 1972. Applies to surface water – lakes, rivers, streams, coastal areas Uses regulatory and non-regulatory tools to protect and restore the nation’s waters Goals: reduce direct pollutant discharges into waterways, finance municipal wastewater treatment facilities, and manage polluted runoff restore and maintain the chemical, physical, and biological integrity of the nation's waters so that they can support "the protection and propagation of fish, shellfish, and wildlife and recreation in and on the water."

4 Monitor and Assess waters based on WQ standards Identify impaired/threatened waters (303(d) List) Develop Watershed Plans and TMDLs Implement water quality controls – point sources and nonpoint sources Water Quality-Based Approach 4 Establish Water Quality Standards

5 Surface Water Quality Standards Criteria to protect these uses Antidegradation policy to limit additional water pollution Adopted by State, Reviewed by EPA Beneficial Uses –fishing –swimming –public water supplies

6 Water Quality CRITERIA Numeric Criteria Chloride - 250 mg/l Lead - 5 ug/l Narrative Criteria "Toxic chemicals shall not be present in toxic amounts" "No objectionable algal densities or nuisance aquatic vegetation"

7 What is An Impaired Water EPA defines an impaired waterbody as one that does not meet water quality criteria that support its designated use. The criteria might be numeric and specify concentration, duration, and recurrence intervals for various parameters, or they might be narrative and describe required conditions such as the absence of scum, sludge, odors, or toxic substances. If the waterbody is impaired it is placed on the section 303(d) list. For each pollutant listed, the state or tribe must develop a restoration target called a Total Maximum Daily Load (TMDL).

8 What Can Happen to a 303(d) listed Waterbody The waterbody has a TMDL submitted and approved within 8 to 13 years and is delisted. The waterbody is restored and meets WQSs and is delisted. The waterbody is reassessed and is found to be meeting WQSs and is delisted. WQSs are changed, the waterbody is reassessed and is found to be meeting WQSs and is delisted.

9 Total Maximum Daily Load - TMDL - A tool for implementing State Water Quality Standards Establishes allowable pollutant loadings for a water body Provides basis for States to establish water quality based controls Addresses both Point Source and Nonpoint Source Pollution

10  WLA +  LA + {MOS} = TMDL Point source loads + nonpoint source loads + MOS = TMDL TMDL Definition WLA = wasteload allocation (point source loads) LA = load allocation (nonpoint source and background loads) MOS = margin of safety (explicit or implicit) TMDL = total maximum daily load Sum of Loads = Assimilative Capacity

11 A watershed plan is a document used to resolve and prevent water quality problems that result from both point source and nonpoint source contributors. These plans are intended both to provide an analytical framework to restore water quality in impaired waters and to protect water quality in other waters adversely affected or threatened by pollutant sources.

12 Why Watershed Plans Fail to Achieve Desired Goals  Planning activities conducted at too great of a scale.  Plan was a one-time study rather than long-term management process.  Lack of stakeholder involvement and ownership.  Skirting of real land use/management issues.  Plan was too long or complex.  Recommendations were too general.  Failure to identify and address conflicts. Source: Center for Watershed Protection

13 Translate and Communicate !!

14 14 Steps In Watershed Planning

15 15 The Nine Elements that Must Be Included in a 319 Watershed Plan 1.ID causes & sources of pollution – TMDL feature 2.Estimate load reductions expected – TMDL feature 3.Describe mgmt measures & targeted critical areas – TMDL feature 4.Estimate technical and financial assistance needed 5.Develop education component 6.Develop schedule – TMDL option 7.Describe measurable milestones – TMDL option 8.ID indicators to measure progress 9.Develop a monitoring component – TMDL option

16 Comparison of Watershed Plans and TMDL Components Watershed Plan Components 1. Build partnerships 2. Characterize the watershed ID waterbody, impairments, study boundaries ID waterbody, impairments, study boundaries Gather and analyze data Gather and analyze data ID causes and sources ID causes and sources Estimate loads Estimate loads TMDL Components 1. Provide opportunity for public involvement 2. Identify the problem ID waterbody, impairments, study boundaries Present data analysis ID causes and sources Estimate loads

17 Comparison of Watershed Plans and TMDL Components continued Watershed Plan Components 3. Sets goals and ID solutions Develop indicators/targets Develop indicators/targets Determine load reductions Determine load reductions ID critical areas ID critical areas Develop management measures to achieve goals Develop management measures to achieve goals TMDL Components 3. Identify water quality targets and goals and allocate loads ID applicable WQS/targets ID critical areas and seasonality Describe technical analysis used in load estimation, load reduction, modeling, etc. Allocate acceptable loads between point and nonpoint sources (WLAs, LAs) Provide for a margin of safety (MOS)

18 Comparison of Watershed Plans and TMDL Components continued Watershed Plan Components 4. Design an implementation program Develop an implementation schedule Develop an implementation schedule Develop interim milestones Develop interim milestones Develop criteria to measure progress Develop criteria to measure progress Develop monitoring component Develop monitoring component Develop educational component Develop educational component ID technical /financial assistance ID technical /financial assistance Assign responsibility Assign responsibility TMDL Components 4. Provide a monitoring and restoration strategy – Optional except for phased- TMDLs WLAs implemented through NPDES permits LAs implemented through voluntary and incentive based programs Monitoring and restoration information encouraged but not required unless the TMDL is phased

19 EPA Watershed Tools www.epa.gov www.epa.gov www.epa.gov/healthywatersheds www.epa.gov/healthywatersheds www.epa.gov/owow/watershedplanning www.epa.gov/owow/watershedplanning Surf Your Watershed Surf Your Watershed Watershed Academy Watershed Academy Watershed Plan Builder Watershed Plan Builder

20

21 Newest News Two EPA watershed products released 2013: A Quick Guide to Developing Watershed Plans to Restore and Protect Our Waters A Quick Guide to Developing Watershed Plans to Restore and Protect Our Waters http://water.epa.gov/polwaste/nps/upload http://water.epa.gov/polwaste/nps/upload watershed mgmt quick guide.pdf http://water.epa.gov/polwaste/nps/upload An Introduction to Watershed Planning An Introduction to Watershed Planning http://cfpub.epa.gov/watertrain/moduleFrame.cf m?module

22 EPA Watershed Central Wiki Wiki.epa.gov Wiki.epa.gov Interactive site with Wiki format Interactive site with Wiki format Allows users to add new H2Oshed programs and input new info to existing sites Allows users to add new H2Oshed programs and input new info to existing sites

23 Never criticize someone unless you have walked a mile in their shoes. That way, when you do criticize them, you’re a mile away. And you have their shoes. And you have their shoes. THOUGHT FOR THE DAY