Introduction hydrologic and hydraulic modelling using MIKE11 (NAM and HD) Gennadiy Donchyts UCEWP, Kiev
2
Contents NAM model overview HD model overview Building model, calibration and verification Hydro-meteo (Q, h, P, T, E) Cross-sections (distance, accuracy, source data) Structures (bridges, weirs, gates, reservoirs, etc.) Additional data (DEM/DTM, TIN, Vector, Satellite, Aerial) Calibration and verification process Example flood-related projects in Transcarpathia
3
Processes that can be simulated by MIKE11 NAM HD
4
Hydro and morphological data used for the rainfall- runoff model customization
5
NAM – introduction NAM model is deterministic, lumped, conceptual model NAM is a set of linked mathematical statements describing the behaviour of the land phase of the hydrological cycle
6
Structure of NAM model Snow storage Surface storage Lower and root zone storage Groundwater storage
7
Conceptual diagram of NAM
8
Data requirments Model parameters Initial conditions Meteorological data Hydrological data
9
Hydrologic and meteorological data for NAM Rainfall (mm) Potential evapotranspiration (mm) Temperature (C o ) Discharge (m 3 /s) Water level (m)
10
Mike11 calibration. NAM model 9 subcatchments Uzh – 4 subcatchments Latoritsa – 5 subcatchments
11
Input data for NAM
12
Uzh River calibration, 1998 Zhornava 550 km 2 Zaricheve 1280 km2 Uzhgorod 1970 km2
14
Main screen of the NAM model
15
Uzh River calibration, 1998
17
Uzh River calibration, 2001
19
Mike11 HD model MIKE 11 is a hydrodynamic model that computes unsteady flows in river and estuaries. Sev-Venan equations Mass balance Momentum balance
20
Data requirments Model parameters Initial conditions (Q, h) Boundary conditions (Q, Q/H) Lateral inflow (NAM results Hydraulic structures data
22
Bridge example
23
10 000 map example
24
MIKE11 Time-Series data (.dfs0)
25
MIKE11 customisation Preparation of data in the MIKE11 files format Hydrodynamic model setup (HD river network schematization) Model calibration and validation
26
MIKE11 Crossections data (.xns11)
30
MIKE11 River network data
31
NAM Rainfall-Runoff model validation Mukachevo Nelipine
32
Mike11 calibration Latoritsa Not enough Too much Dyke breaks occurred Polders were used
34
Storage channel Slatina Visokoberezhni y Charonda -Latoritsa Stara
35
Місце злиття річок Турія та Уж