Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project
2
Preparation on the RR tie-in at the southern end of the sill
3
Completion of the RR tie-in at the southern end of the sill
4
Work on the RR tie-in at the northern end of the sill, including installation of sheet pile with the vibratory hammer
5
Installation of sheet pile across Parsons channel with the vibratory hammer
6
Surveying the sill across the channel before dropping the sheets to grade to grade
7
Installation of the H piles with the impact hammer
8
Placing the rock ramp
9
The marine mammal monitoring post on the west side of the sill