Download presentation
Presentation is loading. Please wait.
Published byIsabella Briggs Modified over 9 years ago
1
Public Hearings June 24, 2014
2
Case: PSP-13-11-268 Project: Enclave at Maitland Boulevard Preliminary Subdivision Plan (PSP) Applicant: Brian Dalrymple, M.I. Homes of Orlando, LLC District: 2 Acreage:9.83 acres Request: Construction of 35 single-family residential dwelling units Enclave at Maitland Boulevard PSP
5
New Condition # 14 The applicant shall install a 6’ vinyl fence along the northern property line, which shall extend east from the eastern boundary of Wetland Buffer Tract I to the western boundary of Wetland Buffer Tract J, and east from the eastern boundary of Wetland Buffer Tract J to the Magnolia Homes Road right- of-way.
6
Enclave at Maitland Boulevard PSP
7
Action Requested Make a finding of consistency with the Comprehensive Plan and approve the Enclave at Maitland Boulevard Preliminary Subdivision Plan (PSP) subject to the conditions in the staff report, as amended. Enclave at Maitland Boulevard PSP
8
Case: PSP-13-08-206 Project: Clarcona Preserve Preliminary Subdivision Plan (PSP) Applicant: Don Bieger, db Engineering Consultants, LLC District: 2 Acreage:11.63 acres Request: Construction of 11 single-family residential dwelling units Clarcona Preserve PSP
11
Action Requested Make a finding of consistency with the Comprehensive Plan and approve the Clarcona Preserve Preliminary Subdivision Plan (PSP) subject to the conditions in the staff report. Clarcona Preserve PSP
12
Case: PSP-14-03-058 Project: Northeast Resort Parcel (NERP) Planned Development (PD) / Phase 3 Preliminary Subdivision Plan (PSP) Applicant: Kathy Hattaway-Bengochea, HCI Planning & Land Development Consultants District: 1 Acreage:19.86 acres Request: Construction of 30 single-family detached residential dwelling units Northeast Resort Parcel PD Phase 3 PSP Northeast Resort Parcel PD Phase 3 PSP
13
Northeast Resort Parcel PD Phase 3 PSP Northeast Resort Parcel PD Phase 3 PSP
14
Northeast Resort Parcel PD Phase 3 PSP Northeast Resort Parcel PD Phase 3 PSP
15
Action Requested Make a finding of consistency with the Comprehensive Plan and approve the Northeast Resort Parcel (NERP) Planned Development (PD) / Phase 3 Preliminary Subdivision Plan (PSP) subject to the conditions listed in the staff report. Northeast Resort Parcel PD Phase 3 PSP Northeast Resort Parcel PD Phase 3 PSP
16
Case: CDR-13-11-269 Project: Rybolt Property West Planned Development / Land Use Plan (PD / LUP) Applicant: Lauralee G. Westine, PA District: 5 Request: Substantial Change to existing PD to allow for one (1) camouflaged unipole telecommunications tower (max height of 180’) Rybolt Property West PD
20
Action Requested Make a finding of consistency with the Comprehensive Plan and approve the substantial change to the Rybolt Property West Planned Development / Land Use Plan, subject to the conditions listed in the staff report. Rybolt Property West PD
21
Public Hearings June 24, 2014
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.