Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan CAC Meeting 2 - Implementation
2
Meeting Purpose Review the proposed Implementation Plan activities ▫Development Rules and Standards ▫Monitoring Program ▫Education and Outreach Program ▫Capital Projects
4
Rules and Standards Rate of stormwater runoff cannot increase. Runoff must be treated to remove at least 60% of total phosphorus and 85% of sediment. The first ½ inch of runoff must be infiltrated on site, such as in rain gardens, bioinfiltration basins, swales, or capture and reuse. Wetlands and floodplains are protected.
5
New Development Requirements Current Rules apply to any development project on sites greater than 5 acres; single family residential threshold is 15 acres Proposed Rules apply to any development project on sites greater than one acre
6
Redevelopment Requirements Current Rules: meet water quality and infiltration requirements only for new impervious surface Proposed Rules: any redevelopment impacting more than 50% of the site must meet all the same rules as new development Proposed Rules: any redevelopment impacting less than 50% of the site must meet the same rules for the entire redeveloped area
7
Increased Infiltration Requirement Currently must infiltrate ½ inch of runoff within 48 hours Proposed new standard is one inch of runoff in 48 hours Exceptions for clay soils, areas with soil contamination, or wellhead protection areas Bioinfiltration swale, Brooklyn Center
8
Proposed New Infiltration Credit Get credit towards infiltration requirement Provide soil management in turfed areas on site Decompact soil to 12” in depth Amend top 8” with compost
10
Monitoring Program To quantify the current status of streams and lakes throughout the watersheds in comparison to state water quality standards. To quantify changes over time, or trends, in stream and lake water quality. To quantify the effectiveness of implemented BMPs throughout the watersheds for the protection of water quality. To document progress toward meeting pollutant load reduction requirements
11
Monitoring Sites SC-3 Shingle Creek at Brooklyn Blvd Sampled 2007 – Present SC-2 Sampled 1996-2006 Approx. 11,000 acres drainage SC-0 Shingle Creek at 45 th Ave Sampled 2001 – Present Approx. 26,000 acre drainage USGS Station Shingle Creek at Queen Ave Sampled 1996 – Present
13
Water Quality Water quality in Shingle Creek is typical of urban streams in the Twin Cities Metropolitan Area. Shingle and Bass Creeks are currently listed as impaired for chloride, DO and lack of fish and macroinvertebrates. Will be listed in 2014 for E. coli. Shingle Creek may also be considered in the future for TSS and nutrients (TP).
15
Longitudinal DO Surveys PalmerLakePalmerLake
16
Lake Monitoring
17
Volunteer monitoring through Citizen Assisted Lake Monitoring Program ▫Proposed in Third Generation Plan: ▫More intensive water quality monitoring ▫Aquatic vegetation surveys ▫Sediment coring Schmidt Lake, Plymouth
19
Wetland Monitoring Wetland Health Evaluation Program ▫Adult volunteers monitor vegetation and macroinvertebrates (bugs) in wetlands
20
Macroinvertebrate/Fish Monitoring Commission monitors fish/bugs every 5 years River Watch Volunteer Monitoring ▫High school students ▫3 locations on Shingle Creek ▫1 location on Mattson Brook
22
Education and Outreach Programming Sponsor volunteer events Participate in education fairs Provide classroom education
23
New Program – “Green Yard” Still being conceptualized Individual stormwater management plan Reduce fertilizer and pesticide useIncrease composting Improve turf maintenance Use native vegetation
24
Other Education and Outreach What things would you like the Commissions to take on?
25
Projects
26
Intensive BMP Studies Planning for small BMPs Detailed analysis by subwatershed ID cost-effective BMPs on a neighborhood or site scale Stormwater Retrofit Protocol-Metro Conservation Districts
28
Capital Projects TMDLs identified several capital projects Cities incorporate projects into their own capital improvement program, street reconstruction program Commission can cost share in 25% of implementation cost up to $250,000 per project Commission partners to obtain grants for projects
29
Implem enting TMDLs Location and ReachActionResponsible Party Estimated Schedule Estimated Cost Lower Shingle Creek Reach 1Reaeration at wetland outletBrooklyn Center, SCWMO2012-2015 $50,000 Reach 1Stabilize streambanksBrooklyn Center, SCWMO2012-2015 $20,000 Reach 2Ecological stream restorationBrooklyn Center, SCWMOCompleted -- Reach 3Ecological stream restorationBrooklyn Center, SCWMOCompleted -- Reach 4 & 5Daylight streamPrivate developer2012-2015 -- Reach 6Ecological stream restoration on Golf CourseBrooklyn Center, SCWMO2020-2025 $100,000 Reach 6Ecological stream restorationMinneapolis, SCWMO2020-2025 $250,000 Reach 7Ecological stream restorationMinneapolis, SCWMO2020-2025 $1,500,000 Reach 8Ecological stream restorationMinneapolis, SCWMO2012-2015 $750,000 Reach 8Fish passage at Webber ParkMinneapolis, SCWMO2012-2015 $50,000 Upper Shingle Creek Reach 1Add reaeration structuresBrooklyn Park, SCWMO2020-2025 $50,000 Reach 2Thin trees, establish bufferBrooklyn Park2015-2020 $80,000 Reach 3Ecological stream restorationBrooklyn Park, SCWMO2020-2025 $700,000 Reach 4Ecological stream restorationBrooklyn Park, SCWMOCompleted -- Reach 5 & 6Enhance restorationBrooklyn Park2015-2020 $70,000 Reach 7 & 8Enhance restorationBrooklyn Park2015-2020 $50,000 Reach 7 & 8Restore balance of reach (Regent to Brooklyn Boulevard) Brooklyn Center, Brooklyn Park, SCWMO 2020-2025 $350,000 Reach 9 & 10Ecological stream restoration, fish bypassBrooklyn Center, Brooklyn Park, SCWMO 2012-2015 $350,000 Reach 11Ecological stream restorationBrooklyn Park, SCWMO2015-2020 $500,000 Reach 11Enhance off-line refugiaBrooklyn Park, SCWMO2012-2015 $30,000 Reach 12Ecological stream restorationBrooklyn Park, SCWMO2020-2025 $75,000 Bass Creek Reach 1Ecological stream restorationBrooklyn Park, SCWMO2015-2020 $300,000 Reach 1Monitor Cherokee WetlandSCWMO2015-2020 Monitoring budget Reach 2Ecological stream restorationBrooklyn Park, New Hope, SCWMO 2015-2020 $300,000 Reach 3Periodic ditch maintenanceHennepin CountyAs needed $10,000 Reach 3Ecological stream restorationPlymouth, SCWMO2020-2025 $100,000 TOTAL One Time Cost $5,615,000 Ongoing Annual Cost (monitoring, education, reporting) $75,000
30
Watershed-wide Meeting
31
Thank You!