Download presentation
Presentation is loading. Please wait.
Published byBuck Sparks Modified over 9 years ago
1
Portuguese Country Report SELL, 11-13 of June 2010 João Moreira
2
Agenda Projects Operations Indicators
3
Project Preservation Based on the JISC Report Four solutions considered –CLOCKSS, LOCKSS, Portico, Local Load Main parameters analised –Content coverage –Costs –Services ofered (Triggers and Post cancelation) Planed final version (3T2010)
4
Projects b-on Mobility B-on Mobility program (Shibboleth) –Federation is setup –More than 50% b-on of Universities and Politechnincs have IDPs –Only EBSCO and Elsevier –Difficulties: process is very complex, requires lots of iterations and time. Please contact me in case you have been better succeded than us.
5
Other Projects ERMS (French Coleagues) Next Gen Search Tools (Italian Coleagues)
6
Services Licenses renewals (2010-2012) New content in All for All regime a)Nature b)Springer books (-2005)
7
b-on Webite
8
Vendors Downloads Vendors Downloads – 2004 a 2008 Downloads Sazonality – 2004 a 2008
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.