Dredging Cost Presentation Dredging private dock terminals Focus on hydraulic dredging Total project cost to owners Industry standards & requirements
5
Dredging Cost Project Specific Disposal Surveys Permitting Environmental External Cost Impacts
6
Identifying the scope of work: Project location Cubic yards of material Dredging template Over-dredge requirements Type of material
7
Choosing a Dredge: Dredge Size Project Specific requirements Type of material Pumping capacity Location Schedule
8
Selecting A DMPA Federal DMPA Private DMPA Uplands Beneficial Use
9
Dredge material placement area requirements (DMPA) DMPA location DMPA Specific requirements Pipeline route Discharge Point Crossings Ship Channel – Road Levee systems Capacity
10
Dredge Pipeline Cost Distance from Project to DMPA Floating, submerged, & land Pipeline route Discharge Point Crossings - Ship Channel – Road
11
Dredging Cost Breakdown Mobilization / Demobilization Pipeline Cost Cubic Yard Unknowns anomalies, debris, & delays Disposal Cost based on gross yardage management fees sediment samples
12
DISPOSAL COST DMPA COST Disposal Fees Deposit & Contract Signing Payment of Gross CY dredged Sediments Sampling Cost Management Fees Application – Consulting
13
DISPOSAL COSTS (per cu/yd.)
14
FUEL COSTS
15
STRUCTURAL STEEL COSTS (per ton.)
16
Project “A”
19
Project “B”
22
PROJECT “A” & “ B” Project “A” 115,000 cy x 8 days = 14,375 cy per dredging day Project “B” 13,000 cy x 5 days = 2,600 CY per dredging day
23
PROJECT “A” & “B” Overview Same dredge spread Pipeline & DMPA Similar dredge template Projects shared the mobilization cost Cost per CY is 5 times for Project “B” than “A”
24
HYDROGRAPHIC SURVEY Pre-Dredge Survey by Contractor Pre-dredge survey by Third Party Verify, Quantities, Tide Gauge, & intervals Verify survey datum and station #’s
25
Post dredge survey by Surveyor & Contractor Post-Dredge Survey review Pay DMPA & Contractor
26
Permit Requirements TCEQ Water Quality Certification USACE Permits Regulatory Real Estate NWP Permits DMPA Permits
27
EXTERNAL COST Environmental Impacts Economic Development Government Requirements USACE Regulatory USACE Real Estate EPA TCEQ Legal – Jones Act
28
DREDGING COST SUMARY Plan Dredging Activities Have Permits in Order Piggy Back off USACE Share Mobilization Cost with Neighbors Coordinate DMPA Contracts Early
29
“Not all Dredges are Created Equally”
30
THANK YOU FOR ATTENDING DREDGING YOUR DOCKS 2014