Presentation is loading. Please wait.

Presentation is loading. Please wait.

They will count as one or two test grades. They will count as one or two test grades. You will have to complete one group project in each of the grading.

Similar presentations


Presentation on theme: "They will count as one or two test grades. They will count as one or two test grades. You will have to complete one group project in each of the grading."— Presentation transcript:

1

2

3 They will count as one or two test grades. They will count as one or two test grades. You will have to complete one group project in each of the grading periods. Each group will consist of three students. Each group will consist of three students.

4 1st Grading Period - Egg Drop Project Each group will be given 5 sheets of paper and tape. A device must be constructed that will safely carry an egg to the ground upon being dropped. Each group will be given 5 sheets of paper and tape. A device must be constructed that will safely carry an egg to the ground upon being dropped. It’s worth 1 test grade. Survive 1 drop - C Survive 2 drops - B Survive 3 drops - A

5 2nd Grading Period - Bridge Project Each group will be given glue and 30 linear feet of 1/8x1/8” balsa. A bridge must be constructed that will hold as much weight as possible. Each group will be given glue and 30 linear feet of 1/8x1/8” balsa. A bridge must be constructed that will hold as much weight as possible. Completion - 1 test grade The bridge must be completed on time and according to the criteria given. The bridge must be completed on time and according to the criteria given. Competition - 1 test grade The grades will be distributed by performance. The grades will be distributed by performance.

6 3rd Grading Period - Rocket Project Each group will construct a water rocket based on a 2-liter bottle fuselage. Fins, a nosecone, and a parachute Each group will construct a water rocket based on a 2-liter bottle fuselage. Fins, a nosecone, and a parachute may be added from other materials. may be added from other materials. The grading will be competitive, based on time in the air. This project is worth 1 test grade.

7 4th Grading Period - Trebuchet Project Completion - 1 test grade The trebuchet must be completed on time and according to the criteria given (including the report). The trebuchet must be completed on time and according to the criteria given (including the report). Competition - 1 test grade The grades will be distributed by performance. The grades will be distributed by performance. Each group will construct a trebuchet (counterweight catapult) from 1x2” wood. It must be contained within a 1 cubic meter box. We will be using 3 kg of counterweight.

8 Visit the website website Return


Download ppt "They will count as one or two test grades. They will count as one or two test grades. You will have to complete one group project in each of the grading."

Similar presentations


Ads by Google