Oil Load Serving Study Update August 18 th, 2011
2
OIL LOAD SERVING STUDY AREA
4
WILLISTON LOAD POCKET
6
ASSUMPTIONS MCDC LIMITED TO 100MW E-W MDU PEAKERS OFF LEWIS & CLARK GEN ON WIND OFF CULBERSTON OFF BUT AVAILABLE FOR PRIOR OUTAGES FORT PECK GENERATION = 35MW, MAX ~135MW WINTER PEAK LOADS
7
CHALLENGES VOLTAGE STABILITY LOW VOLTAGE, POWER QUALITY, POOR “PROFILE” REGIONAL LOAD INCREASES 115KV LINE OVERLOADS MAINLY FEEDING WILLISTON POCKET
8
EXAMPLE VOLTAGE STABILITY “PV” CURVE
9
Charlie Creek EXISTING SYSTEM Charlie Creek-Williston at 115kV 345kV Line 230kV Line 115kV Line
10
Existing System Limit Until July 2012 BASELINE FORECAST
11
July 2012 Charlie Creek-Williston at 230kV
12
CAPCITOR ADDITIONS LocationTotal SizeNotes: Dickinson 11530 MVAR Per the Keystone XL initial load requirement. 2 x 15MVAR for switching Logan 11530MVAR2 x 15 MVAR Blaisdel 11530 MVAR2 x 15 MVAR Dunning 11520 MVAR2 x 10MVAR Kenniston 11512 MVAR2 x 6 MVAR Watford City 11530 MVAR2 x 15MVAR for switching State Line 11515 MVAR1 x 15 MVAR SW Minot 11510 MVAR1 x 10MVAR
13
Williston-CCR 230 & Cap Additions BASELINE FORECAST
14
2013 Networked 115kV Des Lacs
15
Networked 115kV
16
Williston SVC BASELINE FORECAST
17
RUN CULBERTSON PRE-CONTINGENT BASELINE FORECAST
18
ADD 345KV BASELINE FORECAST
19
Prior Outages?
20
Williston-CCR 230 & Cap Additions Networked 115kV BASELINE FORECAST
21
Williston-CCR 230 & Cap Additions Networked 115kV BASELINE FORECAST
22
Williston-CCR 230 & Cap Additions Networked 115kV BASELINE FORECAST
23