Using RAMM to Improve Contract Management Charmaine Okros
2
2 Attention to Detail in Contract setup Systems to Support Contracts Reporting and Data Analysis How do we use RAMM Contractor to Improve our Contract Management?
3
3 Schedule linked to Client Account Codes (WBS) Dayworks have specific claim lines to pull down the correct WBS Code Programme categories to flag WBS overrides Automating the WBS Codes
4
4 Automatic Estimating
5
5 Schedule Aligned with Assets
6
6 Contractors % Overheads set up against Dayworks items Entire Schedule updated with the % No need for manual calculations Contractors Overhead %
7
7 All costs are associated with the correct WBS Code to allow for even distribution across the budget. P & G Spread Across WBS Codes
8
8 Patrol Templates
9
9 Meeting & Presentations
10
10 Works Management Process
11
11 Cardinal Rules to Raising a Dispatch One Dispatch per Asset Type One Dispatch per Maintenance Activity – refer Table 4 ‑ 1 The Dispatch dimensions must reflect the scope of Work The Dispatch location (Start – End) must reflect where the work area, where defined by the fault code Dispatch Asset Type must be valid in terms of Unsealed Activity on Unsealed asset, Sealed Activity on Sealed roads asset, Signs activity on Sign assets etc... Dispatch Guide with Cardinal Rules
12
12 Asset Update Guide
13
13 Annual Planner
14
14 Missing Data Reports
15
15 Maintenance Cost Data
16
16 GIS Layers
17
17 Patrol & RAMM Contractor
18
18 Routine Achievement Report
19
19 Improved maintenance and renewal decisions Improved asset updating Improved maintenance achievement and cost records If you get contract setup and support this with strong reporting and analytics
20
20 Network Owners Control the Contracts
21
Thank you.