Upstart to Start Up: Colorado’s High Speed & Intercity Transit Vision & State Rail Plan September 2014
2
30 Years Makes A Difference 30 Years Ago – 1984 Colorado had intercity Amtrak as the state’s only passenger rail Colorado had no bus / HOV lanes Colorado had a Department of Highways 20 Years Ago – 1992-1996 Colorado had its first light rail segment Colorado implemented its first bus / HOV lanes Colorado entered the Department of Transportation era 10 Years Ago – 2004 FasTracks rapid transit expansion ballot measure passes Light Rail, Commuter Rail, Bus Rapid Transit 2
3
30 Years Makes A Difference Today – 2014 Colorado has the first rural Bus Rapid Transit Fort Collins Colorado opened its BRT FasTracks is well on the way to completion State and Local agencies are planning for growth with all modes & choices in mind 2
4
CDOT Division of Transit & Rail The Division of Transit & Rail established in 2009 Senate Bill 09-094 Authority to plan, design, finance, operate, maintain and contract for transit services. Also in 2009 Senate Bill 09-108 (FASTER) Funding Advancement for Surface Transportation and Economic Recovery (FASTER) Increased Vehicle Registration Fees Funds Highway Safety projects and Bridge replacement and refurbishments Dedicated State funding for transit $15 M per year 2
5
Division of Transit & Rail Annual Budget – approx. $30M/year Historically pass through grant administration Transit Section – 9 employees Transit Grants Unit Administer FTA Grants to rural and small urban transit entities Administer FASTER Transit Grants Planning & Infrastructure Unit Statewide Transit Data Base Transit Asset Management Transit Planning Intercity Bus Rail and Special Projects – 2 employees Planning Studies/Environmental clearance Financing and implementation strategies Railroad coordination Transit Operations – 2 employees 2
6
Statewide Transit Plan - 2014 Regional Transit Plans Strategy-based Reflects a combination of service, facility, vehicle, & marketing / communication needs. Financial Constraints State is 450 x 300 miles 2
7
Interregional Express Bus CDOT becomes a transit operator (using a private operator) Begins to fulfill multimodal mission Interregional element to statewide transit network Connect population & employment centers Peak period commuter & “essential service” express Fast/minimize travel times Limited stops/significant spacing Utilize park-and-rides for broad local access Maximize fare box recovery Expect at least 40% over time Guarantee 20% within two years Expand service as demand builds & farebox revenue allows 2
8
Interregional Express Bus 2 FRISCO
9
State Freight & Passenger Rail Plan - 2012 Develop intercity and regional passenger rail Facilitate Freight RR Communication Railroads & Communities Economic Development Opportunities Coordinate, Integrate, Connect Position Colorado for Federal Funding 2
10
AGS & ICS Studies 2012-2014 Purpose: The purpose of the AGS & ICS projects are to provide Colorado with a well supported modal option for the State’s transportation network that connects communities and destinations for interregional business and tourism travel; builds on and strengthens Colorado’s existing transportation infrastructure; supports the State’s Vision, as articulated in the ‘State Rail Plan’; and offers statewide social, environmental, and economic benefits that are greater than the capital and operating costs of its implementation. Needs: Address the mobility demands of future population growth. Improve mobility through provision of a travel option. Enhance economic development through improved connectivity. Improve the State’s environmental quality and energy efficiency. Provide economic benefits sufficient to receive new funding sources. 2
11
What the AGS & ICS Studies Accomplished Assessed Technologies Defined Alignments Developed Engineering Based Cost Estimates Developed Ridership Models Evaluated Funding & Financing Possibilities Assessed Benefits 11
12
Process - 24 months Stakeholder Involvement ICS Project Leadership Team 70 members 10 meetings up & down the I-25 Front Range Corridor AGS Project Leadership Team 17 members 16 meetings east & west along the I-70 Mountain Corridor Update the State Freight & Passenger Rail Plan 12
13
Outcomes 13 High Speed Transit demand for Longer-Distance Trips Two commercially available technologies: rail & maglev Alignments Shared Railroad corridors impractical Greenfield alignments along I-25 & I-70 facilitate HST $75 M/mile front range – electric, dbl track, high-speed rail $105 M/mile mountains – electric, dbl guideway, high-speed maglev Significant local station development potential Ridership DIA is a critical long-term ridership market for both I-25 and I-70 75-80% of ridership is I-25 Front Range, 20-25% I-70 Mountain, 18 M/yr Front Range System is Key to I-70 Mountain Ridership Success
14
Outcomes, continued 14 HST Not Financially Feasible at this Time Full System $30.1B; Front Range $13.6B, Mountain Corridor $16.5B Substantial Federal funds needed Substantial new local (non-federal) funding source needed Phased approach to get started? Start along the Front Range Commuter rail/upgradable to HST? Phase 1, top priority? Interoperability with RTD is a potential component DUS / Central Area access is important to commuters Maximize utilization of existing infrastructure, minimize transfers Maximum flexibility to phase system development
15
Outcomes, continued DIA Is One of Colorado’s Growth Hubs Grow from 60 M passengers in 2015 to over 100 M passengers in 2030 Master Planned for 13 runways Envisions an “Airport City” whose employment numbers will rival Downtown Denver and DTC in 2030; 70,000 employees RTD’s Light & Commuter Rail System Is Key to Statewide Connectivity Grow from 20 M rail passengers in 2012 to over 80 M rail passengers in 2035 Largest voter-approved transit expansion in the nation 15
16
High Speed Transit (HST) Vision for Colorado N: N. Suburban to Ft Collins S: So. Suburban to Pueblo W: West Suburban to Eagle County Regional Airport Metro: West Suburban to DIA via C-470, I-76 or NWQ North to South Suburban via E-470 4 Total Length: 340 mi Capital Cost: $30.1 B Operating Cost: $198.4 M/yr Fare Revenue: $344 M/yr Ridership: 18.3 M/yr (2035) Vision Description Vision Facts
17
High Speed Transit Next Steps State Rail Plan 2012: Goals & Policy Statements Position Colorado for future Federal Funding Integrate into Statewide Transportation Plan Develop & Explore Implementation Options for a Regional Commuter Rail System Support Linkages of Colorado’s Passenger Rail Systems to National Intercity & High Speed Networks Proposed 2014 Amendments to the State Rail Plan Include Vision Network into unconstrained elements of State Rail Transit & Transportation Plans, MPO Plans, & Intermountain TPR Recommendation to complete an Inter-Operate Assessment Recommendation to explore an FRA- sanctioned prioritization process along the Front Range 17
18
Next Steps - Pipeline Ready 18 RTD Interoperability Assessment Forthcoming FRA – FTA Joint Policy & Shared Use Coordinated safety authority Primarily addresses freight and urban transit HST and RTD covered Partners: CDOT, RTD, FRA & FTA Manageable, meaningful next step Precursor to system prioritization Leverage existing investment FRA Pipeline Process Next step to prioritize/define Front Range phasing plan – FRA Tier 1 Study Exploring the pursuit of future funding for such efforts
19
Questions? For More Information: Mark Imhoff, Director Division of Transit & Rail 303-757-9007 mark.imhoff@state.co.us David Krutsinger, AICP Tracey MacDonald Rail & Special Projects ManagerSenior Transit Planner 303-757-9008 303-757-9753 david.krutsinger@state.co.us tracey.macdonald@state.co.us CDOT – Division of Transit & Rail 4201 East Arkansas, Suite 227 Denver, CO 80222 19