Ranney Collector Construction
2
Ranney Collector Overview
Pump Station Central Reinforced Concrete Caisson Horizontal Well Screens
3
Collector Well Construction
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing
4
Caisson Construction STEP 1 STEP 2 STEP 3 L1 L1 L2 Grade Grade Grade
5
Initial Caisson Lift with Cutting Shoe,
Toledo Bend Reservoir
6
Inner and Outer Forms
7
Caisson Lift with Ports,
Lake Havasu City
8
Clam Shell Excavation, Louisville
9
Clam Shell Excavation, Lake Havasu City
10
Floor Reinforcing, Iowa City
11
Completed Caisson
12
Collector Well Construction
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing
13
Lateral Projection Grade SWL Caisson Lateral A Lateral B Ports
14
Hydraulic Jacking Machine
15
Lateral Projection, Iowa City
16
TYPICAL BORE PILOT Minimize Friction Remove Material
Provide Horizontal Bore
17
Projection Pipe and Sand Line
18
Laterals Installation
Bore Pilot & Projection Pipe Centered On Port Assembly
19
Projection Pipe Advancement
Lateral Installation Projection Pipe Advancement
20
Projection Pipe Advancement
Lateral Installation Projection Pipe Advancement
21
Collector Well Construction
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing
22
Screen Installation Grade SWL Caisson Lateral A Lateral B
(Wire-Wrap Screen) (Wire-Wrap Screen)
23
Wire-Wrapped Screen
24
Wire-Wrapped Screen
25
Development By Overpumping
Q Grade SWL Caisson Pump Laterals
26
Development By Surging
27
Sand Content Measurement
28
Collector Well Construction
Primary Phases of Collector Well Construction Caisson Construction Lateral Projection Screen Installation and Development Performance Testing
29
Performance Testing, Sonoma County
30
Top Slab Installation
31
Conceptual Design and Yield
Ranney Collector Conceptual Design and Yield
32
Equations to Quantify Yield
33
Input Parameters / Design Assumptions
T = 482,600 gpd/ft S = 0.313 K = 5602 gpd/ft sq B = 86 feet A = 700 feet Zi = 75 feet Laterals – 10 to 12 Lateral Radius – 0.5 ft Lateral Length – 200 ft Caisson Radius – 8 ft Pumping Level – 15 ft above laterals
34
Conceptual Design
35
Yield With Recharge
36
Yield Without Recharge
37
Characteristics of Ranney System
$12.6 to $16.0 million for Total System 100% of Construction and Maintenance On Shore Yield Remains High When River Migrates Pilot Testing to Confirm Yield