1
DZAC November 2013
2
Opening remarks
3
EH&S 0658 (GHS)Hazard Communication Update On Line training required by December 1, 2013 All PPE Signs changed by June 2016 Training takes 5-10 minutes DZAC sign in sheets not detailed
4
Electrical Cords and GFCI Pending tom caronna photos
5
New Electrical Training
6
Friday November 1, 2013
7
1982 Caldecott Tunnel Fire
8
Safety in the News-New 4 th Bore of the Caldecott Tunnel-November 18, 2013
9
Gate Arms
10
Jet Fans Every 160 Meters
11
Call boxes, Carbon Dioxide, and Nitrous Oxide detectors Water Valves Earthquake sensors Linear Heat detectors Radio antennas that allow for radio broadcast override Video Cameras
12
Cross passages every 400 feet inside 4th bore
13
Operations and Maintenance Center
14
DZAC Action Items B 70-70A contractors parking in loading zone area Notified Matt Vail 70-70A Aug 9,2013 Jennifer will email Project Directors- B 64/63 parking lot area mirror is missing Notified Richard Debusk via safety concerns 64-63 Aug 9,2013 Resolved Flaggers needing security support Notified Richard Debusk site wide Aug 9,2013 B 50A/50B contractors parking in areas for delivery/maintenance Email to Matt Vail and Richard Debusk 50A and B overhead parking area4-Sep-13 Project winding down Matt Vail believes improved B 31 and B 15 roadways cracking and shifting Employee was advised to send his photos to Mike Dong and Richard Debusk B 31 and B 15 roadways4-Sep-13 B 50A/50B 2 spaces along fence were made for contractors that should be made for LBNLemployees email sent to Richard Debusk and Brian StockB 50A /50B2-Oct-13 Trash can fire B 90 loading dock Discussed issue of moving trash cans with Mike WisheropB 90-site wide2-Oct-13 Wishperop notified
15
Roundtable