Download presentation
Presentation is loading. Please wait.
Published byLauren Lawson Modified over 9 years ago
1
05.08.2010 TEAM GEOMELT
2
The Team Jacob Speelman (ME) Caleb Rottman (EE) RICO Ledy (ME) Eric Geerlings (CE)
3
Outline Project Overview Major Design Decisions Design Snowmelt Geothermal Site Development Model Conclusions Questions
4
Project Overview Problems with the Burton St. Entrance to Calvin Why not use Geothermal energy? OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
5
Overview - Goals Primary Goal: Design a geothermal snowmelt system at Calvin’s Burton Street Entrance Secondary Goal: Design a small scale model OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
6
Overview - Design Norms Stewardship Save on energy and reduce fossil fuel use Caring Increase safety for pedestrians and vehicles Transparency Honest recommendation OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
7
Major Design Decisions Snowmelt What surfaces to melt Is a heat pump required? Geothermal Horizontal vs. Vertical Site Design Pumphouse location Piping and manifold layout Model Component selection OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
8
Snowmelt Design - Overview 4,000 ft 2 to melt at 150 BTU/hr- ft 2 60 tons – About 20 times that of a house Manifolds are used to distribute heat to the snowmelt area OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
9
Snowmelt Design – Pipe Layout 1” PEX pipe 500’ length loops 9” on center pipe spacing 3” from concrete surface OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
10
Condenser Evaporator From Geothermal Loops To Snowmelt Loops Q Q Compressor
11
Snowmelt Design – Heat Pump Entering temperature of 105 °F Exiting temperature of 90 °F OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
12
Geothermal Design First Major Step in the Geothermal Design: Pipe layout: Horizontal or Vertical Advantage/Disadvantage Analysis Design Choice: Vertical Loop Cooling ground over time? OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
13
Geothermal Design Calculated the total bore length required: 9375 ft Limit Bore Depth to 390 ft Pipe diameter – 1 ¼” http://img.directindustry.com/images_di/photo-g/well-drilling-rig-354735.jpg OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
14
Geothermal Design 24 Well Locations Adequate spacing 2” HDPE pipe to pump house 3 rectangular manifolds Design avoids tree removal! Pumphouse hidden from view OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
15
Site Design - Pumphouse OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions Plan View Isometric View
16
Model Design Concrete with installed piping and moisture sensor Insulation Sand Sub-base Soil with installed vertical geothermal loop OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
17
Model Control System OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
18
Conclusions - Cost Analysis Payback Period: 55 years Our recommendation: Don’t do it! Geothermal SystemNatural Gas System Initial Cost$420,000$180,000 Operating Cost $6,600 $10,900 OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
19
Conclusions Why is this not economically feasible? We had three false assumptions: Snow can be melted with ground temperature water The entrance being isolated is a problem for traditional snowmelt systems The ground can be an unending heat source OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
20
Acknowledgements Trent DeBoer, GMB Engineering Steve Schultz, GMB Engineering Scott Post, Prein&Newhof Charles Huizinga, Calvin College Physical Plant Marc Huizinga, Calvin College Physical Plant Professor Nielsen, Team Advisor Ren Tubergen, Gumbo Product Development, Inc. Gary Slykhouse, City of GR Engineering Dept. Bob Bruggink, Moore & Bruggink, Inc. OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
21
OverviewDecisionsSnowmeltGeothermalSite DesignModelConclusionsQuestions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.