Download presentation
Presentation is loading. Please wait.
Published byStella Hines Modified over 9 years ago
1
United States Patent and Trademark Office – www.uspto.gov 1 Patent Prosecution Highway (PPH) United States Patent and Trademark Office
2
2 Background 2006 Cross filing Applications among IP5 Offices
3
3 PPH: Fast Track Examination of Applications What is PPH? –When claims are determined to be allowable in the Office of First Filing (OFF), a corresponding application filed in the Office of Second Filing (OSF) may be advanced out of turn. What is the Purpose of PPH? –OSF can utilize the search and examination results of the OFF thereby avoiding duplication of work and expediting the examination process in the OSF.
4
4 What Are the Benefits of PPH? PPH Benefits for Applicant Provides quicker patentability determination in multiple jurisdictions. Decreases costs of prosecution.
5
5 What Are the Benefits of PPH? PPH Benefits for Offices –Avoid redundant work by reuse of OFF work product –Claims reduced in number and narrowed in focus to what was previously allowed –Reduced Pendency
6
6 PPH Requirements Claim Correspondence All claims in each U.S. application must “sufficiently correspond” to the allowable claims in the application in the OFF.
7
7 PPH Requirements (cont’d) Qualifying Applications –Current PPH Programs, generally speaking Paris priority applications PCT Bridge filings Certain non-binding work product e.g. EPO’s EESR –Future PCT-PPH Pilot PCT-PPH pilot among the Trilateral Offices –Positive international search reports, written opinions, and international preliminary examination reports
8
8 Current PPH Programs PPH Pilot to Full implementation Japan (JPO) Effective on January 4, 2008 Korea (KIPO) Effective on January 29, 2009
9
9 Current PPH Pilot Programs Current Pilots Australia (IPAU) Canada (CIPO) Denmark (DKPTO) European Patent Office (EPO) Finland (NBPR) Germany (DPMA) Singapore (IPOS) United Kingdom (UK IPO) Rospatent (in discussions) Trilateral PCT-PPH (January 2010)
10
10 PPH Requests First OfficeStart DateRequests (as of 1 Nov. 2009) JPOJuly 20061657 278 (Pilot) 1379 (Perm) UKIPOSept 200769 KIPOJan. 2008351 134 (Pilot) 217 (Perm) Total CIPOJan. 2008212,164 IPAUApril 200824 EPOSept. 200821 DKPTONov. 20089 DPMAApril 200910 IPOSFeb 20091 NBPRJuly 20091 RospatentEnd of 2009--
11
11 Cumulative Number of PPH Requests
12
12 Number of PPH Requests by Technical Center
13
13 Important PPH Metrics* Average First Action (FA) Pendency from Grant of PPH Request –Non-PPH 25 months (from filing date of application to FA) –PPH 2-3 months (from grant of PPH request** to FA) Overall Allowance Rate –PPH cases: 91% –Non-PPH cases: 44% Actions per disposal –PPH cases: 1.7 –Non-PPH cases: 2.7 ** application must have completed all its pre-exam processing and is ready for examination. * As of November 2009
14
14 Future Plans USPTO Action Plan to enhance PPH: define target numerical goals and develop global strategy to reach those goals Align PCT with PPH via the Trilateral pilot program Conduct PPH awareness campaigns, internationally and domestically Plurilateral PPH Cooperation –Streamline procedures –Share best practices and statistics –Provide users with one stop access to information
15
15 The Expanding PPH Network GPTO IP Australia Mar. 2008 DKPTO UKIPO KIPO CIPO EPO Sep. 2008 ROSPATENT IPOS NBPR Feb. 2009 APO Apr. 2008 Sep. 2007 Jan. 2008 Mar. 2009 Apr. 2007 Nov. 2008 May 2009 Apr. 2009 Jul. 2008 Apr. 2009 Jul. 2009 HPO Jul. 2006 Jan. 2008 Jul. 2007 USPTO : under consideration : full implementation : pilot implementation Jul. 2009 Oct. 2009 Nov. 2009 Aug. 2009 Jul. 2009 JPO Oct. 2009 Jan 2010
16
16 Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.