1 Storage Space Allocation in Container Terminals Chuqian Zhang *1, Jiyin Liu *1, Yat-wah Wan *1, Katta G. Murty *2, Richard Linn *3 *1 IEEM, HKUST, Clear Water Bay, HONG KONG *2 IOE, Univ. of Michigan, Ann Arbor, Michigan, USA *3 ISE, Florida International University, Miami, Florida, USA
2
2 Outline background problem statement solution approach results and conclusion
3
3 Busiest Container Ports Throughput in TEU Rank200020012002 5 th 4 th 3 rd 2 nd 1st 6,274,556 7,425,832 7,540,387 17,086,900 18,098,000 6,334,400 7,540,525 8,072,814 15,571,100 17,826,000 8,493,000 8,620,000 9,453,356 16,940,900 19,144,000 20-foot equi- valent unit
4
4 Rank200020012002 5 th 4 th 3 rd 2 nd 1st Shanghai Kaohsiung Pusan Singapore Hong Kong Shanghai Kaohsiung Pusan Singapore Hong Kong Singapore Pusan Kaohsiung Rotterdam Busiest Container Ports Throughput in TEU
5
5 Impact of 19.14 m TEU (2002) around 12 m TEU handled by container terminals handling charge: at least NZ$ 2.5 b 2% improvement NZ$ 50 m
6
6 The Typical Container Terminal Layout Blocks of Containers & Yard Cranes Internal Tractors & Quay Crane Block, Internal Tractor, & Yard Crane Blocks, Yard Cranes, & Quay Cranes Quay Cranes & Container Vessel
7
7 Types of Container Movements vessel loading (VSLD: blocks to vessels) vessel discharge (VSDS: vessels to blocks) container grounding (CYGD: shippers to blocks) container pickup (CYPI: blocks to consignees) need to consider the storage space allocationarrival times: random
8
8 Comparing Different Terminals Delta (Netherlands) Long Beach (USA) HIT & COSCO-HIT throughput (TEU) 2.5 mill4.6 mill6.6 mill area (hectares) 280295122 yard cranes ~ 50 (+ AGV) ~ 50 (+ chassis, train) 167 ~ 18,000 TEU per day Tiny areaIntensive operations
9
9 Comparing Different Terminals Delta (Netherlands) Long Beach (USA) HIT & COSCO-HIT throughput (TEU) 2.5 mill4.6 mill6.6 mill area (hectares) 280295122 yard cranes ~ 50 (+ AGV) ~ 50 (+ chassis, train) 167 HK: mix the storage of import (I/B) and export (O/B) containers
10
10 Objectives of Hong Kong Container Terminals various performance indicators, inter- related, and possibly contradictory to each other two commonest objectives in HK to max. the (average) throughput of QCs to min. the (average) vessel berthing time
11
11 Outline background problem statement
12
12 location assignment (determining the exact locations of containers in blocks) storage space allocation (determining the numbers of I/B & O/B containers of each vessel in a block) QC allocation (allocating QCs to (bays of) vessels) berth allocation (allocating vessels to berths) RTGC deployment (deploying RTGCs in real time) IT deployment (deploying ITs in real time) schedule and stowage plan of vessels Operations Decisions in a Container Terminal
13
13 location assignment (determining the exact locations of containers in blocks) storage space allocation (determining the numbers of I/B & O/B containers of each vessel in a block) QC allocation (allocating QCs to (bays of) vessels) berth allocation (allocating vessels to berths) RTGC deployment (deploying RTGCs in real time) IT deployment (deploying ITs in real time) schedule and stowage plan of vessels Operations Decision in this Research
14
14 Our Problem: Storage Space Allocation inputs results of the berth allocation results of the QC allocation vessel arrival and departure times workload requirements of vessels
15
15 Our Problem: Storage Space Allocation outputs stor. space allocation for vessel discharge interchangeable I/B containers to determine for each vessel the number of I/B containers stored in each block stor. space allocation for container grounding interchangeable O/B containers to determine for each vessel the number of O/B containers stored in each block practical solution
16
16 Our Problem: Storage Space Allocation dynamics deterministic arrival times of vessel loading and vessel discharge stochastic arrival times of container grounding and container pick up conversion of movements container grounding turned into vessel loading vessel discharge turned into container pickup
17
17 Sketch of Outputs IB 525 OB 620 IB 28; OB 46 IB 525 OB 620
18
18 Outline Hong Kong terminals problem statement solution approach
19
19 Difficulties of the Problem inter-related problems & sub-problems multiple objectives large number of variables integer variables hierarchical approach location assignment (determining the exact locations of containers in blocks) storage space allocation (determining the numbers of I/B & O/B containers of each vessel in a block) QC allocation (allocating QCs to (bays of) vessels) berth allocation (allocating vessels to berths) RTGC deployment (deploying RTGCs in real time) IT deployment (deploying ITs in real time) schedule and stowage plan of vessels Determine the total # of I/B and O/B containers of each block (to balance the workload in each period) Allocate I/B & O/B containers of vessels to blocks in each period (to minimize total distance traveled) Implement the decision for one day and update the information Information: blocks’ capacity, blocks’ status, arriving containers level 1 level 2
20
20 inter-related problems & sub-problems multiple objectives large number of variables integer variables dynamic problem: vessels, trucks, etc. rolling horizon Difficulties of the Problem (cont.) Day 1Day 2Day 3Day 4Day 5 1 st planning horizon 2 nd planning horizon
21
21 inter-related problems & sub-problems multiple objectives large number of variables integer variables dynamic problem: vessels, trucks, etc. unknown data: grounding and picking ups beyond the planning horizon forecasting Difficulties of the Problem (cont.)
22
22 storage space allocation (determining the numbers of I/B & O/B containers of each vessel in a block) Solution Approach Determine the total # of I/B and O/B containers stored in each block...............................................................
23
23 Level 1: Determine the total # of I/B and O/B containers stored in each block shippers and consignees Vessel A YC 1 YC 2 the earliest departure time of Vessel A depends on the longest working time of YC 1 and YC 2
24
24 Level 1 for yard cranes balance the workload of yard cranes for vessels rationale: yard cranes act as parallel servers; the longest processing time = vessel berthing time output: # of I/B and O/B containers in each block for each time period
25
25 Solution Approach level 1 Determine the total # of I/B and O/B containers stored in each block............................................................... (to balance the workload in each period)
26
26 Level 1 decisions D it : the total number of I/B containers discharged in period t that can be assigned to block i G it : the total number of O/B containers delivered in period t that can be assigned to block i
27
27 - balance the total number of containers - balance the number of vessel loading/discharging containers the objective function Level 1 )]}(min)(max[ )](min)(max[{ }{ }{ 2 1 }{ }{ 1 it i i T t i i PGLDPGLDw LDLDwMin Minimize the dispersion of the total number of containers among blocks Minimize the dispersion of vessel loading/discharging containers among blocks
28
28 Level 1 ~ D t ~ D t0t0 ~ D t1t1 ~ D t,T-t t... D 1t01t0 D 2t02t0 D Bt0... D 1t11t1 D 2t12t1 D Bt1... D 1t,T-t D 2t,T-t D Bt,T-t... 1t1t 2t2t Bt......,,2,1;,2,1BiTtD it 0 D tT k itk workload at period t block i...,,2,1;,2,1BiTtP it 1 0 )( 0 DP t k kkti conservation of flow of containers total number of containers discharged at period t: from vessel records number of containers to be taken away at different time periods: from historical pattern storage blocks of such containers
29
29 Level 1...,,1,0;,2,1 ~ 1 tTkTtDD B i itktk ...,,1,0;,2,1 ~ 1 tTkTtGG B i itktk ...,,2,1;,2,1 0 BiTtDD it tT k itkit ...,,2,1;,2,1 0 BiTtGG it tT k itkit ...,,2,1;,2,1 1 0 )( 0 BiTtGLL t k kktiit ...,,2,1;,2,1 1 0 )( 0 BiTtDPP t k kktiit TtBiLPDGVV ti...,,2,1;,2,1)]()[( )1( TtBiCV iit...,,2,1;,2,1 flow conservation constraint on CYPI and VSLD containers block density constraints flow conservation constraint on CYGD and VSDS containers integer variables
30
30 Solution Approach level 1 Allocate I/B & O/B containers of vessels to blocks in each period........................................................ Determine the total # of I/B and O/B containers stored in each block............................................................... (to balance the workload in each period)
31
31 Level 2 known locations of vessels and blocks known D it, D itk, G it, G itk (numbers of I/B and O/B containers in each block for each period) from level 1 unknown: the identification of vessels that contribute the containers (to blocks) minimizing the travelling distance of ITs minimizing the total processing time of vessels standard transportation problems
32
32 Level 2 X ijtk : the number of I/B containers discharged from vessel j in period t, picked up by customers in period t+k, that can be assigned to block i ( or the number of O/B containers arrived in period t, headed for vessel j in period t+k, that can be assigned to block i) decisions (separating I/B & O/B)
33
33 1 2 StSt 1 2 B 1 B Sources (vessels) Destinations (blocks) N 1t N 2t N st U1t0U1t0 U2t0U2t0 U Bt0 U 1t2 U Bt(T-t) : : : d 11 : X 11t1 )( : tTtBS tt Xd Level 2 number of different types of containers stored in each block number of containers for each vessel minimize the total distance travelled by ITs
34
34 B i S j tT k ijtkij t XdMin 110...,,1,0;,2,1 1 tTkBiUX t S j itkijtk ...,,2,1 10 tjt B i tT k ijtk SjNX X ijtk 0 i = 1, 2, …, B; j = 1, 2, …, S t ; k = 1, 2, …, T - t s.t. Level 2
35
35 Solution Approach Implement the decision for one day and update the information Information: blocks’ capacity, blocks’ status, arriving containers level 1level 2 Allocate I/B & O/B containers of vessels to blocks in each period........................................................ (to minimize total distance traveled) Determine the total # of I/B and O/B containers stored in each block............................................................... (to balance the workload in each period)
36
36 Outline Hong Kong terminals problem statement solution approach results and conclusion
37
37 Numerical Study for Level 1 real data: 17 days, 6 periods per day 3-day rolling horizon effective capacity = 83% 10 blocks (~ 4320 integer variables) accept the first feasible integer solution
38
38 ratio between the gap & the lower bound min: 0.0%; average: 1. 84%; max: 6.58% computation time min: 16.5 s; average: 110 s; max: 542 s average imbalance all containers: 5.68/period vessel related containers: 4.22/period Results of Level 1 upper bound lower bound optimal solution
39
39 Conclusion propose a procedure that possibly improves the terminal operations further studies more extensive numerical runs different settings larger sizes approximate methods for solving level 1 actual benefits for terminals
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.