Download presentation
Presentation is loading. Please wait.
Published byConstance Cobb Modified over 9 years ago
1
Score/Mountain Fold line Glue Tab Score/Mountain Fold glue tabs & lower tower cap. Score/Mountain Fold glue tabs & upper tower cap. PRINT ON CARDSTOCK Launch Umbilical Tower © 2005 Drawn by Michael Burke This cardmodel is only for personal and not commercial use.
2
Lightning Rod Roll into tube Crane Keel Sandwich and glue both halves around cardstock Inner Sleeve Centering Circle Top Bottom 25 TON 10 TON 10 TON 25 TON Score/Mountain Fold Lines Score/Mountain Fold Lines Trim this piece to fit Glue Tab COLBY CRANE SEATTLE COLBY CRANE SEATTLE Mountain Fold/Score lines Score/Mountain Fold line Glue Tab Mountain fold all triangular glue tabs on both ends Rear Front Machinery House As the Crane is designed to rotate, the builder may wish to build it from cardstock for extra strength. You need build only one crane – these are alternate parts Print on Cardstock Glue Tab © 2005 Drawn by Michael Burke This cardmodel is only for personal and not commercial use.
3
Hold-Down Arm Supports These are wedge-shaped pieces that are glued to the underside of the square protrusions in the top opening of the thrust chamber and to the face of the thrust chamber liner. All folds are Mountain folds. Hold Down Arm Supports Hold Down Arms Thrust Chamber Liner Center in holes cut out of launcher platform, between upper and lower decks. Valley Fold/Score Lines Glue Tabs PRINT ON CARDSTOCK See Crane Parts Page for Hold Down Arms and Launcher Pedestals Mountain Fold/Score Lines Circles on underside of platform are for locating holes for tower pedestals. After platform is complete, carefully drill holes with tip of X-Acto knife. Insert pedestal tubes all the way to the underside of the top of the platform deck. 1 SIDE 3 1 SIDE 3 1 SIDE 1 1 SIDE 1 1 SIDE 2 1 SIDE 2 1 SIDE 4 1 SIDE 4 Carefully Cut out White Portion © 2005 Drawn by Michael Burke This cardmodel is only for personal and not commercial use.
4
SM Arm Glue Tab Score/Fold lines Glue Tab S-IVB Arms Forward Arm Aft Arm Glue Tab Score/Fold lines Glue Tab CM Access Arm Carefully cut this white notch out Carefully cut this white section out Score/Fold Lines Score/Fold Lines Glue Tab Score/Fold line Glue Tab Service Arms Damper Arm Glue Tab Score/Fold lines When completed, the Damper arm assembly goes together like this. Solid red sections are the walkway (bottom) of the arm – gray section with diagonal cross members are the tops. Sides have diagonal cross members with “mesh” on bottom half. Both ends are “capped” for rigidity and for mounting to the tower. All folds are “mountain” folds. Recommend printing on bond paper. PRINT TO BOND PAPER When CM Access Arm is complete, from the top, it should be shaped like and mounted to side of tower, like this. Other arms are mounted to front of tower, like this. (See drawing for placement.) S-II Intermediate Arm Glue Tab S-I & SII Arms S-II Forward S-II Aft S-IC Forward S-IC Intertank Score/Fold lines Glue Tab Score/Fold lines Glue Tab Score/Fold lines Glue Tab S-II Intermediate Arm Glue Tab S-I & SII Arms S-II Forward S-II Aft S-IC Forward S-IC Intertank Score/Fold lines Glue Tab Score/Fold lines Glue Tab Score/Fold lines Glue Tab © 2005 Drawn by Michael Burke This cardmodel is only for personal and not commercial use.
5
Inner Sleeve – on bottom of crane Roll into double layered tube – Glue edge to centerline Glue tube to bottom of Crane Keel, centered in small circle. Inner Sleeve should fit snugly enough inside Outer Sleeve that Crane doesn’t wobble, but loosely enough to allow rotation. Outer Sleeve – Inside top of Tower Roll into double layered tube – Glue edge to centerline. Cut out small circle on top of tower, glue tube in line with hole in order to stabilize crane and allow it to rotate. Lightning Rod Roll into tube Launcher Base Pedestals Roll into double layered tubes – Glue edge to centerline Crane Keel Sandwich and glue both halves around cardstock Inner Sleeve Centering Circle Top Bottom 25 TON 10 TON 10 TON 25 TON Score/Mountain Fold Lines Score/Mountain Fold Lines Trim this piece to fit Glue Tab Inner Sleeve Tower Outer Sleeve Lightning Rod PRINT TO BOND BAPER Crane Boom COLBY CRANE SEATTLE COLBY CRANE SEATTLE Mountain Fold/Score lines Score/Mountain Fold line Glue Tab Mountain fold all triangular glue tabs on both ends Rear Front Machinery House As the Crane is designed to rotate, the builder may wish to build it from cardstock for extra strength. You need build only one crane – either these parts or those on the Tower Base page Hold Down Arms Glue to square protrusions in thrust chamber opening on top of launcher platform. Cut out bottom bulkhead of Saturn V, glue to cardstock, and use to align Hold Down Arms such that they are centered and support the rocket model. All lines are Score/Mountain Fold Lines © 2005 Drawn by Michael Burke This cardmodel is only for personal and not commercial use.
6
Interstage SM/LM Adapter Fins – Trim off Root Tabs USAUSA USAUSA USAUSA USAUSA UNITEDSTATESUNITEDSTATES UNITEDSTATESUNITEDSTATES UNITEDSTATESUNITEDSTATES UNITEDSTATESUNITEDSTATES Roll Into double-layered tubes Launch Escape Tower Roll Into Cylinder Service Module Command Module S-IVB S-IC, Interstage, & S-II PRINT TO BOND BAPER F-1 Engines This wedge is a glue tab Engine Fairings Saturn V Rear Bulkhead Glue to cardstock and use to align and center Hold Down Arms on Launcher Base. Glue to Cardstock Centering Rings Glue one in front and back of S-1C/S-II Tube S-IVB Centering Rings Glue Rings to Cardstock and glue one in front and one in back of S-IVB © 2005 Drawn by Michael Burke This cardmodel is only for personal and not commercial use.
7
Damper Arm
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.