Download presentation
Presentation is loading. Please wait.
Published byAron Butler Modified over 9 years ago
1
1
2
2 Along with the guidance and more than three decades of experience in the heavy transportation industry in North America and Russia and Kazakhstan. The Founder of the company Mr. Garry Proch has strived to create a company of which the primary philosophy of safe, reliable, and cost effective work, and innovative ideas encouraged from LLT’s employees. To bring Lifting&Loading Tasymaly to the next level in the transportation industry in the Republic of Kazakhstan.
3
3 Lifting & Loading Tasymaly is a national company that since the establishment did not change the composition of executives and management. Fakil Sirazetdinov Transport Coordinator Fakil Sirazetdinov Transport Coordinator Baurzhan Fazylov General Director Baurzhan Fazylov General Director Yerzhan Bekeyev HSE & QA/QC Manager Yerzhan Bekeyev HSE & QA/QC Manager Altyn Khalkuziyeva Chief accountant Altyn Khalkuziyeva Chief accountant Aliya Serikova Lawyer Aliya Serikova Lawyer Assem Aizhanova HR Manager Assem Aizhanova HR Manager
4
The company of «LIFTING AND LOADING TASYMALY» LLP was founded in January 2009 and carries out working activities in the Republic of Kazakhstan. The main regions in which the company operates is - West Kazakhstan region, Aksai, "Karachaganak“ oilfield as well as in Aktobe, Uralsk, Atyrau, and Mangistau regions. The main activities of the company are: Civil construction; Logistics (oversized and heavy cargo transportation); Load lifting operation (crane works); Assembly / disassembly and transportation of Drilling Rigs. Participation in Planning - preventive maintenance of the plant. LLP «LIFTING AND LOADING TASYMALY» has experience working with companies such as KPO BV, Parker Drilling, Saipar Drilling, PFEC, BKKS, KSS, SARENS, CONDENSATE, Denholm Zholdas, KCA Duetag, AGIP, TUVIA Kazakhstan. 4
5
5
6
6 YearClientType of work 2009 - 2015 «Parker Drilling Company International Limited» «SaiPar Drilling Company B.V. Karachaganak Project Kazakhstan Branch» transportation of heavy and oversized cargo; load lifting work; assembly / disassembly and transportation of drilling rigs. 2009 «Bonatty S.p.A. Kazakhstan Branch» lifting operation, installation and set up of mud storage tanks at the WMF project KPO B.V. 2010, 2012 «Karachaganak Petroleum Operating b.v.» participation in the planned - preventive works (Shutdown) of the plant (load lifting work by Cranes from 50 tons and above, Steam Tracks - 1600, telescopic all terrain forklifts, telescopic manlift’s). 2012 «KCA DEUTAG DRILLING» KASPI, KASHAGAN PROJECT, A-ISLAND oversized and heavy cargo transportation; lifting work; assembly / disassembly and demobilization of residential and industrial complex KE-F. 2013 «KPO b.v Project, «Bolshoi Shagan», «ZHAIKMUNAIGAZ Chinarevo Plant» set up and installation of fuel tanks. 2015 «BATYS POWER» URALSK
7
7
8
8 LLP «LIFTING AND LOADING TASYMALY» has existing infrastructure in Aksai, including office space, base, workshop, transport infrastructure, cranes, fork lifts, excavators, and other equipment.
9
9
10
10
11
11
12
12
13
13
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.