Download presentation
Presentation is loading. Please wait.
Published byJody Fleming Modified over 9 years ago
1
3. Hyper Container Crane Elevation platform 1818 No. 2 TrolleyNo. 1 Trolley 1. Productivity 40% increase. (More than 60 boxes/H) 2. The container is transferred via the elevation platform between two trolleys. 3. The height of platform is automatically selected to equalize the cycle time of two trolleys.
2
3. Hyper Container Crane 1919
3
Without bay shifting, hatch cover operation Average of on-deck and hold operation in 1 bay Operation productivity : 40 % UP (Theoretically) 3. Hyper Container Crane 2020
4
Seismic Isolation System for Mitsubishi Quayside Crane Seismic Isolation System 2121
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.