Project Delivery Design Considerations Lessons Learned
2
Design Bid Build vs. Design Build Partnering BOS Involvement Project Inception Plans and Specifications Construction Technical Support Document & Refine
3
UDOT FHWA WisDOT UDOT - Manual for the Moving of Utah Bridges Using Self UDOT- Propelled Modular Transporters (SPMTs) SPMT Process Manual And Design Guide FHWA - Manual on Use of Self-Propelled Modular Transporters to Remove and Replace Bridges
4
Bridge Staging Area Prior to Bridge Move
5
Bridge Staging Area Prior to Bridge Move Bridge Move Final
6
Design Partnering Innovation Updates
7
Travel Path Diaphragms
8
Travel Path Diaphragms Coupler Detailing Miscellaneous Details Schedule
10
Abutment Panels
11
Bridge Manual Specifications
12
8/15/2013 BOS 201312
13
Bridge Staging Areas ◦ Space requirements ◦ Geotechnical investigation ◦ Level terrain for travel Path ◦ Positive drainage ◦ Environmental considerations 13 Rawson Bridge Staging – West Span Rawson Bridge Staging – East Span
14
Shoring Towers ◦ Two (2) span 45W girder bridge ◦ Timber crane pads ◦ Steel shore towers ◦ Steel header ◦ Anchorage for lateral loads and stability 14 Shoring Tower – West Span Shoring Tower – East Span
15
Self Propelled Modular Transporter (SPMT) ◦ Ground improvements on travel path ◦ Steel plates for turning radius ◦ Space for bracing and existing shore towers ◦ 138’ feet wide ◦ 95’ feet long 15
16
SPMT ◦ Heavy lift contractor ◦ Submittal reviews ◦ 35 semi-loads of equipment ◦ Site access ◦ Assembled in 48 hours Public viewing area 16
17
Pre-Move Deck Crack Inspection ◦ Deflection monitoring during bridge Move ◦ Post move crack inspection ◦ Pier closure pours ◦ May 28 th to June 23 rd closure window 17
18
Pre-cast pier construction ◦ Driven pile and cast in place pile cap ◦ Detailed bar steel placement with template ◦ High early strength masonry 18
19
Pre-cast concrete columns High strength bar steel couplers Footing to column connection Column to precast cap connection 8000 psi non shrink grout 19
20
Pre-cast pier construction ◦ Pre-cast concrete cap ◦ Sections up to 45 tons – Two (2) crane pick ◦ Grouted bar coupler Connection to columns ◦ Tight construction tolerances ◦ Survey control 20
21
Pre-cast pier construction Lessons learned: ◦ Detail additional room for bar couplers ◦ Comprehensive survey control ◦ Steel templates for bar steel ◦ Match cast pre-cast elements 21
22
Keys to Project Success ◦ Public outreach and involvement ◦ Close coordination with prime and heavy lifter ◦ Travel path preparation and planning ◦ Project partnering with stakeholders 22
23
***Bill to Insert SMPT Bridge Move Video ***