Download presentation
Presentation is loading. Please wait.
Published byStuart Juniper Cox Modified over 9 years ago
1
View from the bridge wing in the drydock of open cargo holds forward
2
Looking down into a cargo hold from the bridge wing
3
Mounting the propeller, preparing for installation of the rudder
4
The bulbous bow grand block in the paint shop
5
The bulbous bow is remover from the paint shop
6
Moving the bow section into position for turning it
7
The bow section is lifted by the Goliath crane for righting.
8
The sequence of righting the bow section
10
The bow is landed right ride up
11
A view from the crane
12
A view from the crane as the bow is placed in the dock
13
MAUNAWILI in the drydock
14
View in drydock before erection of bow sections
15
View of stern section.
16
Assembly of grand block after erection, during weldout
17
Intermediate deck grand block awaiting erection
18
Stern view in drydock
19
View from a top Goliath.
20
Upper bow section maneuvered into the paint shop for final coating
21
Maunawili upper bow grand block after painting
22
A tight squeeze out of the paint shop
23
The Kirow machines maneuver a 525-ton unit from the paint shop
24
An imposing move of the final grand block
25
Upper bow section being maneuvered out to yard for transport and installation.
27
Upper bow section being maneuvered out to yard for transport and installation
28
Upper bow section being maneuvered out to yard for transport and installation.