1. Dev. of Marine Liquid Terminal Facilities consisting of two berths 300m, each on North side of existing Jetty and a SPM in KPT waters at OOT Vadinar for handling crude & petroleum products on captive use basis (THROUGH PPP MODE)
2
2. Setting up of SPM & allied facilities off Veera in Gulf of Kutch
3
3. Operation and Maintenance of Container Terminal on PPP Mode” (11 th & 12 th Cargo Berth) as is where is basis” at Kandla Port for concession period of 30 years (THROUGH PPP MODE)
4
4. Grant of License for operation of Floating Crane at OTB
5
(THROUGH INTERNAL RESOURCES ) 5 Development of 16 th Cargo Berth
6
(THROUGH INTERNAL RESOURCES ) 6. Upgradation of existing two lane road from NH-8A to Tuna Port
7
(THROUGH INTERNAL RESOURCES ) 7. Strengthening of Oil Jetty 1 & 2