Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Mythical Man Month “Plan to throw one away”. “Pilot Plant” Have you ever tried to cook for a lot of people? Right Proportion?

Similar presentations


Presentation on theme: "The Mythical Man Month “Plan to throw one away”. “Pilot Plant” Have you ever tried to cook for a lot of people? Right Proportion?"— Presentation transcript:

1 The Mythical Man Month “Plan to throw one away”

2 “Pilot Plant” Have you ever tried to cook for a lot of people? Right Proportion?

3 Measure twice, cut once In most projects, the first system is barely usable. Should you built a throw a way system?

4 Management question Plan for a throw away system? Deliver first system to your customer?

5 Building a throw away system The new version will include lessons learned. Produce a better product Better chance of success Not building a throw away system ▪ Able to meet time deadlines ▪ Agony for the user ▪ Bad reputation

6 First built This is a picture of the Tacoma Narrows Bridge. At the time, the third longest suspension bridge in the world.

7 General Consensus Systems need more management control. Changes are inevitable. J. Cosgrove author of the article “Needed: a new planning framework” Treat all plans, milestones and schedules as tentative, so as to facilitate changes.

8 Changes continue Level of expertise Capitalize on capabilities Fixing problems create more problems

9 Highlights Planning Rebuild Changes Changes creates more problems


Download ppt "The Mythical Man Month “Plan to throw one away”. “Pilot Plant” Have you ever tried to cook for a lot of people? Right Proportion?"

Similar presentations


Ads by Google