Download presentation
Presentation is loading. Please wait.
Published byHerbert Nicholas Simpson Modified over 9 years ago
1
IN THE NAME OF ALLAH (GOD) WHO CREATED THE BEAUTIFUL ANGLE OF THIS UNIVERSE WITH THE PROTECTOR OF KUN
2
SUCCESS STORY TUWAIRKI STEEL MILLS LTD BAGGING SCALE Presented by Mr. Muhammad Irfan Libra Scales, Karachi Office
3
Customer Name Al Tuwairqi Holding Address Port Muhammad Bin Qasim, Karachi Contact Person Mr. Muhammad Adnan Phone number 021-34720254-55
4
Tuwairqi steel is producing DRI (Direct Reduced Iron) which recovered from mines and available in shape having 70% Iron in it. TSML is purifying this DRI up to 97% of Iron. Tuwairqi group is operating another DRI process plant in Damam (UAE) therefore management of TSML Pakistan asked for mechanical drawing from Damam plant and prepared mechanical structure according to supplied drawing. Tuwairqi steel is producing DRI (Direct Reduced Iron) which recovered from mines and available in shape having 70% Iron in it. TSML is purifying this DRI up to 97% of Iron. Tuwairqi group is operating another DRI process plant in Damam (UAE) therefore management of TSML Pakistan asked for mechanical drawing from Damam plant and prepared mechanical structure according to supplied drawing. About Tuwairqi Steel Mills Ltd
5
After finalizing of purifying of DRI, client need to fill a bag of DRI having 2.5 ton capacity. CLIENT’S NEED ASSESSMENT
6
We offer them automatic bag filling systems and deal was done as Libra Scales will deliver only electronics (IBC X4 controller along with platform and load cells) and TSML will design mechanical system at their own. Libra Scales (Karachi Office) Offers
7
Libra Scales (Karachi) Decision making & Situation Handling/ Problem Assessment Mechanical errors in mechanical structureBall bearings are not installed under sliding gate We recommend them to prepare 2 gates as course and fine gates Recommended ball bearings under sliding gates Pneumatic and electronic work we started bag filling on trial basis
8
First bag result was 2600 kg instead of 2500 as decided target We suggest some more modifications in mechanical which are creating errors in result we got targeted result 2500 Kg with error of 5 kg as agreed in order contract.
9
PICTURES
24
THANKS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.