Download presentation
Presentation is loading. Please wait.
Published byMyles Heath Modified over 9 years ago
1
Masconomet Regional School District Teaching and Learning Initiatives Update Art Business & Computer Ed. EnglishForeign Language Mathematics MusicScience, Technology & Engineering Pupil Personnel Services Health & Physical Ed. Social Studies AthleticsGuidance & Health Services
2
National Initiatives 21 st Century Skills Technology Standards Common Core State Standards (CCSS) Partnership for Assessment of Readiness for College and Careers (PARCC) New Educator Evaluation Edwin- state’s vision for an integrated suite of tools to help educators
3
21 st Century vs. Industrial Age Communication Collaboration Critical Thinking Creativity Global Awareness
4
21 st Century Skills Implementation Issues Need time to develop activities that incorporate these skills Need a standard set of tools for staff and students to use Need training to teach best practices and strategies
5
Technology Standards Identify specific computer skills students need to master by grade level prior to graduation Defines digital literacy as an essential skill
6
Technology Standard Implementation Issues Determining how to weave these skills into existing course activities where possible Determining skill level when entering into Masco Determining what experiences are best taught in separate units and who will teach these units
7
Common Core State Standards A common set of learning standards. These standards merge the MA curriculum frameworks with technology standards (digital literacy) and 21 st century skills for math and ELA
8
CCSS (i.e. literate) Curriculum Map (What topics and when) Classroom Activities (How do we teach topics)
9
Difference MA Curriculum Frameworks CCSS Literacy Reading and Writing Reading, writing, and speaking using multiple modes of communication Test MCASPARCC
10
Common Core State Standards - Tasks Teachers must develop curriculum maps that tie classroom activities to the new standards Teachers must design and/or redesign lessons (identify resources, create activities, and develop assessments). These new lessons must then be evaluated and monitored to ensure the new standards are met.
11
Common Core State Standards Implementation Issues This process could be done much quicker if we could record and share lessons and practices in a way that was searchable Need tools to create/design interactive, dynamic, personalized, engaging lessons to meet the standards Need staff training related to preparing con- tent and resources in this new environment
12
Partnership for Assessment of Readiness for College and Careers (PARCC) Assessment tool that will likely replace the MCAS test for Math and ELA Current target date for change FY15 for Middle School, FY17 for High School Online vs. pen and paper test – training and orientation will be needed for staff and students
13
PARCC Implementation Issues Transition details are currently unavailable Schools, including Masco, do not currently have the front or back end infrastructure in place to administer and online test Students will need testing experience and practice in an online format prior to taking the new high stakes test
14
New Educator Evaluation 4 Standards –Curriculum, Planning, and Assessment –Teaching all Students –Family and Community Engagement –Professional Culture Evidence Based Evaluation Rubrics – (evidence portfolios)
15
New Educator Evaluation Eventually student performance will be linked to evaluation (to be defined by state) Must negotiate certain aspects of the new evaluation with applicable employee bargaining units (teachers, administrators, principals, and superintendent) Implementation plan on some level must commence for Masco by September 2013
16
New Educator Evaluation Implementation Issues Need portfolio product to store exemplars and evidence Need tools to help facilitate the evaluation process Staff need to be trained in all aspects Final details are currently unavailable because we are in negotiation with staff
17
Edwin Cloud based software DESE vision for a comprehensive integrated suite of tools and resources to help educators
18
Edwin Implementation?? May or may not be useful to Masco Limited pilot to a few RTTT school districts in late winter, early spring of this year Not free, must pay to access and utilize system. Details not yet available.
19
Implementation - need to: Develop, store and easily share instructional resources Store artifacts as evidence for the new educator evaluation A common set of instructional tools that are available to staff and students
20
Implementation - need to: Analyze the effectiveness of resources, activities, assessment, and pedagogy on student performance so that we can identify good practice, personalize instruction, and improve learning outcomes Tie new standards to course activities Train staff
21
Some solutions: Institute a 1:1 program with associated infrastructure upgrades Learning Management System
22
Mobile Device Pilot Update Pilot teachers and students completed pre- pilot surveys. Pilot teachers are documenting classroom experiences and evaluating impact on student learning Teachers will switch device types this month
23
Mobile Device Pilot Update - Infrastructure Back End Infrastructure –Firewalls & Routers –Content Filters & Email Filters –Servers & Storage –Switches & Cabling –Internet Bandwidth –Wireless Access Points –Monitoring Software Internet Bandwidth & Content Filter Low/UnderPowered for Mobile Classrooms Wireless Density (Concentration of Access Points) Insufficient to Support 1:1
24
Mobile Device Pilot Update – What We’ve Learned What Is Working Well –Firewall & Router –Servers & Storage –Cabling & Some Switching –Internet Providers –Email Filter –Wireless Access Point System
25
Mobile Device Pilot Update – What We’ve Learned What Needs Improvement –Internet Bandwidth –Content Filter –Some Switches –Wireless Access Points –Monitoring Software
26
Mobile Device Pilot Update – Corrections What Needs to Be Done –Add Internet Bandwidth w/ Existing Providers –Replace Content Filter –Upgrade Needed Switches –Add Wireless Access Points –Procure Monitoring Software for Device Mgmt
27
Mobile Device Pilot Update – Balanced Approach Shifting Resources –Shift to Bolster Network, Bandwidth, Wireless –Shift Away from Big Data Center & Draw Down Old Servers, Desktops, Labs, Printers –Reduced Cost to Maintain Data Center –Maximize ROI of Existing Resources
28
Learning Management System (LMS) Platform to facilitate teaching and learning in a 21 st Century educational environment. Student Information System (SIS) A software product used to manage the administrative aspects of student information (attendance, discipline, schedules, transcripts, etc.)
29
LMS Study History June 2010, applied for & received a grant to look at the use of technology in teaching & learning. Those involved recommended the formation of 2 study groups (LMS/SIS & MDP) The group was established in the Spring of 2011 along with the Student Information System study group. SC made an initial appropriation of $100,000 for the procurement of the system.
30
Study group charge Review the district’s current systems; Review systems that others are using in the industry; Determine the district’s particular requirements;
31
Study group charge Establish criteria for Masconomet’s system; Prepare an RFP to procure any software and/or hardware needed; Evaluate the responses; and Prepare an implementation plan.
32
Role of LMS 1)Facilitate the consistent delivery of course content 2)Provide a structure for course management 3)Provide tools for: Curriculum developmentCommunication CollaborationCalendaring Task management
33
Important Elements Overarching goal - Keep the focus on teaching and learning, not on being a technology expert Three areas of focus used to evaluate LMS’s: 1) Environmental 2) User Interface and Tools 3) Support
34
Important Elements - Environmental Provide a secure environment for teaching digital literacy skills Single sign on to access information Tools to aid in differentiating instruction
35
Important Elements – User Interface and Tools One system with all teaching tools Simple User Interface Robust assessment and content delivery tools Searchable content repository Ability to tie standards to instructional activities Ability to view student performance profile in one place
36
Important Elements - Support The District retains ownership of all resources Minimize the total cost of ownership Breadth and depth of product support Stable company that is committed to meeting the needs of the K12 market
37
Evaluation Process 1)Request for Proposal developed based on criteria noted in this presentation 2)Paper review of Proposal submissions 3)Product demonstrations – presentations and sandbox product testing
38
Evaluation Process 4) Targeted investigations based on study group concerns 5) Site visits 6) Evaluated products against the criteria 7) Write a report of findings and recommendations for next steps
39
Summary 1)To implement the CCSS, PARCC, the technology standards, and teach 21 st Century skill fluency, a 1:1 (hardware) environment is necessary. 2)To achieve the national standards and expectations established for teaching and learning, as well as provide the software platform for a 1:1 program, an LMS is needed.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.