Download presentation
Presentation is loading. Please wait.
Published byBenedict Elliott Modified over 9 years ago
1
Update on Laser Heating at the ALS Simon Clark Laser heating workshop Saturday March 20 th 2004
2
Who’s who at the ALS?
3
Who’s who in the high-pressure consortium? UC Academics LBNL COMPRES LLNL Paul Alivisatos UCB Chemistry Raymond Jeanloz UCB E&PS Sarah Tolbert UCLA Chemistry Elise Knittle & Quentin Williams UCSC Earth Sciences Raymond Jeanloz UCB E&PS Abby Kavaner UCLA Earth Sciences Li Ming Univ. Hawaii Elise Knittle UCSC Earth Sciences Tom Sharpe ASU Lou Terminello LLNL Patrick Allen LLNL Joe Zaug LLNL
4
BL12.2.2 Storage ring tunnel High Pressure BL Hutch 12.2.2 Sibyls BL Hutch 12.3.1 Control / Analysis Workstations Facility BL Instrum. Racks External Walkway Door Future High Pressure BL Hutch 12.2.1
5
BL12.2.2 optics overview (end station 1) Hutch wall anvil detector Nanoscience / mat. chem endstation Nanoscience / mat. chem endstation
6
BL12.2.2 optics overview (end station 2) Hutch wall Solid State Physics / Geoscience end station
7
End station layout
8
End station 1: Chemical dynamics
9
Refocus optics
10
End station 2: Laser heating
11
Laser heating optics table
12
Current end station configuration
13
Example data
14
Laser heating system in lab.
15
Schematic of laser heating system
16
Laser heating goes live!
17
Heating fluids
18
Time line for completion of construction Jan-Feb 2004: Commission beamline Beginning March: Install temporary end station equipment March-April: Collect high-P data and commission beam line May shutdown: Install end station 1 April-July: Collect P/T data on end station 1 end-July: Install laser heating system and end station 2 August: Commission on line laser heating with Mike Walter September: Begin operations with consortium members September 2005: Begin general user program
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.