TRENCHLESS INSTALLATION AGRULINE
2
HORIZONTAL DIRECTIONAL DRILLING (HDD) Diameters up to OD 600 Length up to 500 m Drilling to the target pit Fixing the pipe to the drill head Drawing the pipe to the start pit Horizontal directional drilling Soil displacement hammer Requirements Products Projects
3
SOIL DISPLACEMENT HAMMER Uncontrolled displacement hammer up to DN 150 Controlled displacement hammer up to OD 63 Length up to 25 m Commonly used for house connections Horizontal directional drilling Soil displacement hammer Requirements Products Projects
4
REQUIREMENTS Hard stony grounds cause: Grooves and striations Point loads Those causes may lead to premature failure due to crack growth. High quality pipes made from high-grade materials are essential for trenchless installations! Horizontal directional drilling Soil displacement hammer Requirements Products Projects
5
PRODUCTS Sureline® made of PE 100-RC Especially crack resistant SurePEX Horizontal directional drilling Soil displacement hammer Requirements Products Projects
6
PROJECT: HDD Bad Hall (A) Natural gas supply Horizontal directional drilling Soil displacement hammer Requirements Products Projects
7
PROJECT: HDD Horizontal directional drilling Soil displacement hammer Requirements Products Projects
8
PROJECT: HDD Hamburg Harbour (D) Natural gas supply 4. Pipe appearing at the start pit 3. Feeding the pipe2. Mounting the drill head to the leverage 1. Fixing the drill head to the pipe Horizontal directional drilling Soil displacement hammer Requirements Products Projects
9
AGRU Kunststofftechnik GmbH Ing.-Pesendorfer-Str. 31 A-4540 Bad Hall Austria / EU www.agru.at T +43 (0) 7258 790 - 0 F +43 (0) 7258 3863 E office@agru.at Subject to errors of typesetting, misprints and modifications. Illustration are generic and for reference only! THANKS FOR YOUR ATTENTION