Presentation is loading. Please wait.

Presentation is loading. Please wait.

Central Business District Study Area 1500 acres along Peachtree Pkwy.

Similar presentations


Presentation on theme: "Central Business District Study Area 1500 acres along Peachtree Pkwy."— Presentation transcript:

1

2 Central Business District Study Area 1500 acres along Peachtree Pkwy.

3 The Study’s 5 Focus Areas 1.ADDRESS TRAFFIC ISSUES 2.FACILITATE HOUSING CHOICES 3.REFRESH / REDEVELOP 4.AMENITIZE & CONNECT 5.CREATE REMARKABLE SPACES Let’s look at a few of these…

4 Amenitize and Connect Link activity areas with sidewalks, trails, greenways, and bike paths

5 Technology Parkway without connectivity (today)

6 Technology Park with connectivity (future)

7 Facilitate Housing Choices Convert vacant office to residential Insert millenial housing into existing corporate campuses

8 Commercial Corridor Development Town Center Hub at north end Holcomb Br. Hub at south end Innovation Hub in the middle

9 1 2 3 4 6 5 7 8 9 10 11 Sprouts Piedmont Bank Retail Stores 1.Restaurant 2.Restaurant 3.Restaurant 4.Retail ground floor/office above 5.Retail ground floor/ office above 6.Parking deck 7.Cinema 8.Town Green 9.Performing Arts Theater 10.Restaurant 11.Townhouses Plans for Town Center

10 VIEW #1 AT ENTRANCE

11

12 VIEW #2 AT TOWN SQUARE

13

14 Plans for Holcomb Bridge Center

15 Holcomb Bridge Rd. at Peachtree Pkwy (today)

16 Holcomb Bridge Rd. at Peachtree Pkwy (future)

17 Innovation Hub (corporate campus in Tech Park today)

18 Innovation Hub (corporate campus in Tech Park in the future)


Download ppt "Central Business District Study Area 1500 acres along Peachtree Pkwy."

Similar presentations


Ads by Google