Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ing. Tomáš Vicherek, Ing. Vlastimil Polach, Ph.D. Research and development Automatic Route Setting According to Train Paths in Anticipated Time Schedule.

Similar presentations


Presentation on theme: "Ing. Tomáš Vicherek, Ing. Vlastimil Polach, Ph.D. Research and development Automatic Route Setting According to Train Paths in Anticipated Time Schedule."— Presentation transcript:

1 Ing. Tomáš Vicherek, Ing. Vlastimil Polach, Ph.D. Research and development Automatic Route Setting According to Train Paths in Anticipated Time Schedule for Near Future AŽD Praha, s.r.o.

2 Architecture Now Interlocking net GTN Server GTN Klient Intranet GTN Vital computers GTN Listen Commanding computers

3 Vital computers Architecture with ARS Functions Interlocking net GTN Server GTN Výhled Intranet Commanding PC GTN GTN Listen GTN Klient Commanding computers

4 GTN Výhled 4 Base Simulation Immediate train running Infrastructure states Automatic train route setting Mathematical Model of Anticipated Traffic Computation of conflict-free Anticipated traffic

5 Computation of Anticipated Traffic in GTN Výhled Choosing the tracks Static -> dynamic speed profile Occupation times Conflict detection and solution Displaying of Anticipated traffic Automatic Train Route Setting

6 ** * * ** Marking Algorithm Static speed profile Dynamic speed profile

7 Running Times Time of beginning / end of physical occupation of track section V s

8 Train length Time for approach section Occupation time t Time for route formation Time for clearing Time for route release Journey time of occupied block interval Occupation Times

9 Conflict detection Each train is searching conflict: Work direction of detection algorithm of second train Station t s First detected overlap of occupation times First train Second train

10 Each conflict = several solutions (2 – 4) Each solution = new daughter scenario several daughter scenarios, in each: conflict detection and solution  several new scenarios, in each... Tree of scenarios Solution of Conflicts

11 ARS According to Train Path Interlocking states are mirrored in Base simulation „What is possible in GTN should be possible in interlocking“ => Low probability of request rejection by interlocking

12 Other Automatic Functions Route cancelation Time synchronization Anticipated / real departure insertion Train number  insertion, editing Individual point control Line consent request Locking the closed level crossing

13 Tasks to Solve Collision access to some platforms Input information  Temporary speed restrictions different infrastructure models –IS IM X GTN Výhled  Exceeded loading rate  Waiting times, rolling stock circulations

14 Interface to Operating Personal ARS control through JOP X GTN Possible commands:  Editing station / line track  Editing dwell / departure time  Turning ARS on / off train station controlled area  Absolute / disposition stop

15 ARS Behavior High traffic intelligence => most of routes set without dispatcher intervention Warning if route cannot be set Dynamic adaptation to dispatchers commands on JOP ARS with advance  enough time for route cancelation by dispatcher

16 Tomáš Vicherek, Email: Vicherek.Tomas@azd.cz Thank You for Attention


Download ppt "Ing. Tomáš Vicherek, Ing. Vlastimil Polach, Ph.D. Research and development Automatic Route Setting According to Train Paths in Anticipated Time Schedule."

Similar presentations


Ads by Google