Download presentation
Presentation is loading. Please wait.
Published byCollin Murphy Modified over 9 years ago
1
Exp.Curve 2012. Planed tasks Prediction of behavior for each task! We should determine the time constant τ Rising exponential Falling exponential
2
Exp.Curve Math and portals We assume exp. Curve scenario
3
Exp.Curve 2012. STOP WORK HERE 37% OF WORK LEFT (TO BE DONE)
4
Exp.Curve When to stop work! We stop work when curve starts to go in saturation!
5
Exp.Curve Large number of portal with different Locations......end up with different results
6
Exp.Curve Portals behave similar...... We select best portals !!!
7
Exp.Curve There are differences Depends if portal is already live? If work will be continued after planed period etc....
8
Exp.Curve The Normal Probability Distribution Graph of the Normal Probability Density Function x f ( x )
9
Exp.Curve What we will have?
10
Exp.Curve 10% of portals will be extraordinary!!!
11
Exp.Curve Normal Curve 68% 95% 99.7% Approximate percentage of area within given standard deviations (empirical rule).
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.