1 BUILDING FACILITIES, EQUIPMENT AND CATERING FOR FOUNDATION STOCK
FARMA SPREČA d.o.o. KALESIJA Donje Vukovije bb, Kalesija, BiH Tel/Fax: / BUILDING FACILITIES, EQUIPMENT AND CATERING FOR FOUNDATION STOCK GOAT FARM Sarajevo, April, 2014.

2 Company profile „Farma Spreča“ d.o.o. Kalesija
Company for production, trade and services Established in 2008. Director: Vladimir Tomašević Structure of company: private owned The number of the employees: 80 Several sectors of production like the cow milk production, reproduction, cultivation of the land, fruit growing, machinery and construction Current number of animals : 1 650 Final capacity of animals : Land cultuvation: ,96 ha Orchards: ,32 ha Projects: the goat farm of 4400 animals, biogas generator; photovoltaic system, compost factory, greenhouse production, orchards increasing, factory for fruits- processing and storage, irrigation system, factory of feed processing

3 Location GREENHOUSE PRODUCTION GOAT FARM CATTLE FARM ORCHARDS

4 Project- Goat Farm Capacity:
The building complex area 280x210 m (5, 88 hectors) 1920 milking goats 48 male goats 860 baby goats in care and feeding 1600 animals of breeding goat’s offspring Primary buildings: Milking parlour with incubator Stables for goats Stable for male goats 4. Stable for fatting and breeding offspring Secondary buildings: Hangar for mechanization and concentrate 6. Shelters for hay and straw 7. Pressed silage bunkers 8. Dump for manure 5 6 6 7 2 6 2 6 1 8 Production at full capacity (per year) : liters of milk kg of baby goat and goat meat (raw meat) 825 animals of male and female breeding stock for sale  4.200 tons of manure 2 2 3 4

5 Total initiating investment
Elements profit I Basic assets 1. structures 1.1. facilities ,00 1.2. Infrastructure ,00 Total 1 ,00 2. A basic herd ,00 3. equipment 3.1. Technological equipment ,00 3.2. Farm machinery equipment ,00 Total 3 ,00 4. Initiating investment (designing, supervising, permission and license 57.500,00 total I (1 do 4) ,00 II Working capital ,00 total (I+II) ,00

6 Projection of business result in €
Project performance Projection of business result in € Elements The years of project 2015 2016 2017 2018 2019 2020 2021 I Total income II Expenditure 1. Material costs and energy supplies - food and mat - drugs 3.869 9.578 12.865 16.555 18.864 19.133 19.198 - electricity 3.401 8.421 11.311 14.555 16.586 16.821 16.878 - water 2.503 6.197 8.324 10.711 12.205 12.379 12.421 - fuel 4.051 10.030 13.472 17.337 19.755 20.036 20.104 - current maintained 7.010 17.356 23.311 29.998 34.182 34.668 34.786 -other costs 969 2.398 3.221 4.145 4.723 4.791 4.807 Total 1 2. Amortization 3. Gross profit 51.167 98.859 4. Immaterial costs 8.124 20.114 27.016 34.766 39.615 40.178 40.315 Total (1 do 4) III IV Income tax 11.172 20.312 35.581 57.634 60.268 59.917 V Net income Accumulation -26,3 13,3 18,0 23,6 30,7 31,5

7 www.milkos.ba www.farmaspreca.ba