Refractory Repair Strategies for Battery Life Extension
Condition monitoring: COMIT Preventative maintenance Remedial repairs Ernie Goffi, Senior Vice President Fosbel Inc.
2
Condition Monitoring: COMIT (Coke Oven Management Information Technology)
3
Coke Oven Maintenance Information Technology (COMIT)
Based on philosophy wall condition represents battery operating conditions and traumas past and present. A non-intrusive Condition Monitoring system for any coke battery design. Flexible to account for varying life goals Configurable to suit varying battery designs and operating conditions. A day-to-day condition monitoring system that predicts operational security risks. A battery deterioration or improvement trendline which can be graphically represented. Success measurement of PM programs can be graphically represented
4
Elements of COMIT COMIT is structured in a modular format:
Weekly Reporting Operational Data Collection & Reporting Battery Analysis and Reporting Wall Analysis and Prioritisation Ranking Inspections Overdue Life of Repair Risk Analysis Life Prediction
5
COMIT Dashboard: Plant Overview
6
Battery Status: Plan View
7
Wall History: Table of Repairs & Inspections
8
Activity Entry: Down to a specific location
9
Wall Diagram
10
Priority Report for Repairs & Inspections
11
Histogram of Condition Ranking
12
Current Inspection Histogram
13
Weekly Report of Fosbel Activities
14
Historical Chart of Condition Trends
Coal blend problem – Jan. to March 2005
15
KPI chart of Fosbel performance onsite
16
Life Chart: Sept 2002
17
Life Chart: March 2006
18
Priority Chart for all 5 dimensions of Condition Monitoring
19
Cost Analysis: Production Yields
20
Flue Rankings Chart 0 is best, 5 > 250°C deviation
21
Thermograph of battery heating: by temperature
22
Thermograph without temps
23
Thermograph showing ranks
24
COMIT Case Study: Tata Iron & Steel Company, India
In less than 2 years of operation at Tisco: Battery 7A increased life by 7 years yielding: 50 ovens x 24/20 x 18t yield x 365 x 7 = 2,759,400t Battery 7B increased life by 4 years yielding: 50 ovens x 24/20 x 18t yield x 365 x 4 = 1,576,800t Total coke production increase = 4,336,200 Tangible method of tracking life deterioration trend in place. COMIT now networked across the coke plant.
25
MICOWALL Modular Interlocking Coke Oven Wall Technology
26
MICOWALL (Modular Interlocking Coke Oven Wall) Coke Oven Repair Technology
27
Design Objectives - Cokemaking
Minimal Production Downtime Minimal Impact on Heating Maintain Old Silica at Temperature Long Life Rehabilitation to Walls No Process Safety Interruptions Maintain Thermal Design of Flues
28
Design Objectives - Management
Reduced Inventory Levels Low Installation Costs Low Capital Investment World’s Best Practice Used Cost Effective Repairs Safety of People During Repairs
29
Design Objectives - Installers
Low Complexity with Fewer Shapes Reduced Time Exposure to Heat Weight of Blocks within OHS Limits No Heat-Up Contractors Required Interlocking Integrity Maintained New to Old Fits in Expanded Batteries
30
Design Objectives - Engineering
Reproducible Design Principles Minimal Repetitive Engineering Costs Alignment to Existing Ports Oven Taper Maintained Pressed Shape Preferred over Cast Wilputte HF Batteries Resolved
31
MICOWALL Key Design Outcomes
Full T&G Bonding and Interlocking Fused Silica Optimum Choice Pressed Block for Most Shapes Same Shapes for C/S & P/S Cost Effective Wall Rebuilds Thermal Design Fully Maintained
32
Coke Ovens Modular Wall Design
Isometric Layout of Modular End Wall
33
Coke Ovens Modular Wall Design
Typical Heating Flue Course
34
Coke Ovens Modular Wall Design
35
Coke Ovens Modular Wall Design
1st Course Layout
36
Coke Ovens Modular Wall Design
Oven Roof Brick
37
Coke Ovens Modular Wall Design
Bridging Course above Horizontal Flue
38
Coke Ovens Modular Wall Design
Horizontal Flue Course
39
MICOWALL Construction
View of heating Tier 6
40
MICOWALL Construction
Brick Tier 11
41
MICOWALL Construction
Completed Endflue
42
MICOWALL Utilizing Conventional Silica
43
MICOWALL Utilizing Conventional Silica
44