detect and identify Radiometric Level Measurement in Coke Chambers
2
Process Control 2 Conditions in the coke chamber Diameter of Coker approx 7m, height approx 20m Temperature up to 430 degrees Celsius Pressure up to 22 bar during cracking process and up to 300 bar water jet during dicharging process Critical product properties of residues Extraordinary mechanical strain during discharging process
3
Process Control 3 Requirement on Level Measurement Non contact measurement system Reliable measurement system Safe measurement system Proven measurement system Radiometric Level Measurement from Berthold Technologies is the solution
4
Process Control 4 Process in the Coke Chamber Hot residual is filled from the bottom Coker is heated up to 430 degrees Celsius Pressure drops from 22 bar to 4 bar Heavy fuels are separated into low and high boiling components Light components are drained off via a nozzle on the top
5
Process Control 5 Process Requirement Fast filling cycle of the Coker required for economical reasons Filling process is restricted by foam formation Optimization of filling and discharging process in coke chamber
6
Process Control 6 Process Optimization Optimization of filling and discharging process by continuous level measurement Control of foam level by controlled injection of anti-foam agent Additional safety feature by max level switch
7
Process Control 7 Measuring Tasks Continuous Level Measurement Measurement of the total level coke/oil/foam-content with radiometric measurement system Indirect measurement of the foam level by observing and analysing rising speed of the level Detection of Maximum Level Radiometric level switch below process gas stub pipe
8
Process Control 8 The Filling Process Start of continuous level measurement
9
Process Control 9 The Filling Process Foam level rises
10
Process Control 10 The Filling Process Anti foam agent is added
11
Process Control 11 The Filling Process Continuous level measurement
12
Process Control 12 The Filling Process Foam level rises
13
Process Control 13 The Filling Process Anti foam agent is added
14
Process Control 14 The Filling Process Continuous level measurement
15
Process Control 15 The Filling Process Foam level rises
16
Process Control 16 The Filling Process Anti foam agent is added
17
Process Control 17 The Filling Process Continuous level measurement
18
Process Control 18 The Filling Process Foam level rises
19
Process Control 19 The Filling Process Anti foam agent is added
20
Process Control 20 The Filling Process Continuous level measurement
21
Process Control 21 The Filling Process Foam level rises
22
Process Control 22 The Filling Process Anti foam agent is added
23
Process Control 23 The Filling Process Continuous level measurement
24
Process Control 24 The Filling Process Foam level rises
25
Process Control 25 The Filling Process Anti foam agent is added
26
Process Control 26 The Filling Process Continuous level measurement
27
Process Control 27 Measurement System for Level Measurement in Coke Chamber Continuous level measurement LB 440 control unit master and slave Rod detectors LB4405 in cascade Point source in shielding Typ 100/150/200 Level Switch LB 441 control unit Point source in shielding LB7440/7442/7444
28
Process Control 28 Benefits Filling and discharging process can be optimized by continuous level measurement Safes money and time Indirect determination of foam level is possible Injection of anti-foam agent can be controlled, safes money Overflow detection by max level switch Safety of process