Presentation is loading. Please wait.

Presentation is loading. Please wait.

Florida’s Race to the Top Overview. Funds Support Florida Policy Moving to Digital Instructional Materials Increased High School Graduation Requirements.

Similar presentations


Presentation on theme: "Florida’s Race to the Top Overview. Funds Support Florida Policy Moving to Digital Instructional Materials Increased High School Graduation Requirements."— Presentation transcript:

1 Florida’s Race to the Top Overview

2 Funds Support Florida Policy Moving to Digital Instructional Materials Increased High School Graduation Requirements – now including an online course Online Assessment Teacher Evaluation Virtual Education National Standards and Assessments 2

3 3 Florida’s RTTT Budget Total 2010-112011-122012-132013-14 Standards and Assessments 21,139,000 38,020,000 37,920,000 41,920,000 138,999,000 Data Systems 6,417,673 10,686,538 4,414,627 4,325,741 25,844,579 Great Teachers and Leaders 12,739,312 18,078,916 21,675,646 16,418,378 68,912,252 Struggling Schools 16,073,600 22,594,300 24,736,550 22,595,550 86,000,000 Charter Schools 2,500,000 10,000,000 DOE Project Management and Oversight 5,106,852 5,045,772 5,045,773 20,244,169 Total 63,976,437 96,925,526 96,292,595 92,805,442 350,000,000 Formula Funds $ 350,000,000 Total Request $ 700,000,000

4 4

5 Teacher Support Projects Teacher Tools Teacher Standards Tool Formative Assessments (used to guide instruction) Lesson Study Toolkits Teacher Instructional Materials Report Student Tutorial Interim Assessments STEM Program for Gifted and Talented 5

6 6 RTTT Funds to Local Education Agencies (LEAs) 65 Participating LEAs with full program approval –62 School districts – 3 University Laboratory Schools (FAU, FAMU and U of F) 6

7 District Support Projects District-Developed Assessments for Hard-to- Measure Content Areas Job-embedded Teacher Preparation Programs Recruiting Promising Teachers for Low- Achieving Schools Community Compact Leadership Pipeline for Turnaround Principals and Assistant Principals Building Local Education Agency-level Capacity for Turnaround in Rural LEAs LIIS Defined Minimum Requirements 7

8 District Work Lesson Study as Professional Development Tool Implementation of a Rigorous STEM Career Academy Increasing Student Access to Accelerated Courses Increasing Technological Infrastructure Implementing a Local Instructional Improvement System Implementing Teacher and Principal Evaluation System Based on Performance Ensuring Equitable Distribution of Effective Teachers and Principals Providing Effective Support to Teachers and Principals Turning Around Low-Performing Schools 8

9 9 Standards and Assessments Initiative Total Budget for Four Years Procurement Curricular tools to implement the common core $46,619,000 Competitively bid contracts Support for the transition to high- quality assessments (interim and formative), international assessment comparisons $81,480,000 Competitively bid contracts Increased access to STEM courses $4,500,000 Competitive grants to consortia Classroom support for lesson study $6,400,000 Included in assessment contracts Total$138,999,000

10 10 Data Systems to Support Instruction Initiative Total Budget for Four Years Procurement Accessing and Using State Data Travel, Equipment, Training Stipends, and Other Expenses $11,429,211 $344,442 Competitively bid contract(s) DOE operating budget Using Data to Improve Instruction Travel, Supplies, Equipment, and Other Expenses $10,419,346 $3,651,580 Competitively bid contract(s) and subgrants to identified districts DOE operating budget Total$25,844,579

11 11 Great Teachers & Leaders Initiative Total Budget for Four Years Procurement Improve measurement of academic gain $5,800,000Competitively bid contracts Implement rigorous, transparent, and fair evaluation systems for teachers and principals $4,795,992Competitively bid contracts Incorporate evaluation results into making career decisions (including financial consultants) $12,705,000Competitively bid contracts Assignment of effective teachers and principals to high-need schools $25,642,000 Competitive grants to teacher preparation programs, contracts for principal preparation programs Improve access to teachers in hard-to- staff subjects and assignment of teachers to high-poverty/minority schools $10,200,000Competitively bid contract(s)

12 12 Great Teachers & Leaders Initiative Total Budget for Four Years Procurement Use performance measures to improve contributions of teacher and principal preparation programs $1,620,000 Competitively bid contract(s) and/or grants Improve LEAs’ ability to provide effective professional development $5,404,380Competitively bid contract(s) Establish a Community of Practitioners $744,880 Competitively bid contract(s) and/or grants Great Teachers & Leaders Evaluation $2,000,000 Competitively bid contract with national consulting firm Total$68,912,252

13 13 Turning Around the Lowest-Achieving Schools Initiative Total Budget for Four Years Procurement Recruit high-quality teachers$9,000,000Competitively bid contract(s) Leadership pipeline for turnaround principals and assistant principals $6,000,000Competitively bid contract(s) Build district-level capacity for turnaround in rural districts $1,500,000Competitively bid contract(s) Provide DA summer academy for lowest 5% schools and their feeder patterns $8,000,000 Subgrants to fiscal agent districts for regional DA program Partner with effective charter school operators $20,000,000Competitively bid contract(s) Improve and expand STEM career and professional academies $10,000,000 Combination of contracts and subgrants to districts Provide regional reading coordinators $12,500,000 Subgrants to DA fiscal agent districts

14 14 Turning Around the Lowest-Achieving Schools Initiative Total Budget for Four Years Procurement Provide regional STEM coordinators $7,000,000 Subgrants to DA fiscal agent districts Implement community compacts in one district $12,000,000 Subgrant to selected district Total$86,000,000

15 15 Charter Schools Initiative Total Budget for Four Years Procurement Implementing unique innovations that align with one or more of the four assurances $10,000,000 Competitive awards to charter schools or appropriate organizations

16 16 DOE Project Management and Oversight Initiative Total Budget for Four Years Procurement Project management and formative and summative evaluations $5,200,000 Competitively bid contract(s) Personnel (salaries and benefits)$6,847,600 Staff augmentation via subgrants and contracts Travel, supplies, and other expenses $5,936,297 Subgrants, contracts and DOE operating budget Indirect cost$2,260,272 Total$20,244,169

17 Northwest Regional Data Center (NWRDC) As part of the State Data Center Consolidation various data centers at DOE are moving to NWRDC. This move should be completed by the end of this year. RTTT projects that include technology systems will be hosted at NWRDC. 17

18 High School Graduation Requirements Entering 9 th Grade 2010 2011 2012 2013 To Graduate Algebra (EOC as part of grade) and Geometry + Biology and Geometry (EOCs as part of grade), online course and Algebra EOC + Biology EOC, Geometry EOC and Algebra II + Chemistry or Physics and an equally rigorous science course

19 Content For ALL Students 1. MA.912.A.3.8: Graph a line given any of the following information: a table of values, the x- and y-intercepts, two points, the slope and a point, the equation of the line in slope- intercept form, standard form, or point-slope form. 2. MA.912.G.1.3: Identify and use the relationships between special pairs of angles formed by parallel lines and transversals. 3. SC.912.L.14.36: Describe the factors affecting blood flow through the cardiovascular system. 19

20 Content For ALL Students 4. MA.912.A.3.14: Solve systems of linear equations and inequalities in two and three variables using graphical, substitution, and elimination methods. y = 2x +10 y = -2x - 6 5. SS.7.C.1.9: Define the rule of law and recognize its influence on the development of the American legal, political, and governmental systems. 20

21 Year/Grade LevelK123-89-12 2011-2012FLLLLL 2012-2013F L LLL 2013-2014 CCSS fully implemented F L B L 2014-2015 CCSS fully implemented and assessed F L F - full implementation of CCSS for all content areas L - full implementation of content area literacy standards including: (1) text complexity, quality and range in all grades (K-12), and (2) CCSS Literacy Standards in History/Social Studies, Science, and Technical Subjects (6-12) B - blended instruction of CCSS with Next Generation Sunshine State Standards (NGSSS); last year of NGSSS assessed on FCAT 2.0 Florida’s Common Core State Standards Implementation Timeline

22 Race to the Top Goals 1. Double the percentage of incoming high school freshmen who ultimately graduate from high school, go on to college, and achieve at least a year’s worth of college credit; 2. Reduce the achievement gap by half in 2015; and 3. Increase the percentage of students scoring at or above proficient on NAEP by 2015, to or beyond the performance levels of the highest- performing states.


Download ppt "Florida’s Race to the Top Overview. Funds Support Florida Policy Moving to Digital Instructional Materials Increased High School Graduation Requirements."

Similar presentations


Ads by Google