1 RAILWAY TRANSPORT IN TURKEY
Hacer UYARLAR Board Member of UTIKAD

2 RAILWAY TRANSPORTATION
Total length of the railways km 27 % is electrified 34 % is signallized Private companies can operate own wagons Monthly block train departures has reached to 5700 1000 block trains for international operations 13 block train routes to Europe Automotive transportation by rail

3 RAILWAY NETWORK Total Lines: km (Convantional+High Speed)

4 FREIGHT TRANSPORTATION
Freight Transportation Nettonne (Thousand) Freight Transportain On the Basis of Goods Nettonne

5 ELECTRIFICATION Conventional lines : 2.328 km
High Speed Train lines : 888 km 3.216 km 27 % 8.792 km 73 %

6 SIGNALIZATION Conventional lines : 3.128 km
34 % Conventional lines : km High Speed Train lines : 872 km 7.992 km 66 %

7 LIBERALIZATION OF TURKISH RAILWAYS
“Rail transport will increase in Turkey” Liberalization Law has entered into force as of 1 May 2013 Turkish State Railways Transportation Company is established TCDD will be the operator of the national rail infrastructure network Private companies can operate own locomotives & wagons

8 PUBLIC - PRIVATE SECTOR COOPERATION
With the railways being the prioritized transport policy since 2003, significant steps were taken towards the development of advanced railways industry with the cooperation of domestic and foreign private sector entities and in this scope; Adapazarı High Speed Train Factory (EUROTEM) Çankırı High Speed Turnout Factory (VADEMSAŞ) Sivas Modern Concrete Sleeper Factory (SİTAŞ) were established

9 LOGISTICS CENTERS Samsun, Denizli and İzmit Logistics Centers are opened 1. step of Eskişehir and Kayseri Logistics Centers are completed 2. step of Eskişehir and 1. step of Erzurum Logistics Center are beginning to work Balıkesir Logistics Center is under construction, 2. step of Kayseri Logistics Center will be begin Other logistics centers’ projects are continuing

10 LOGISTICS CENTERS IN TURKEY
KOSEKOY / IZMIT HALKALI / ISTANBUL KEMALPASA / IZMIR BOGAZKOPRU / KAYSERI HASANBEY / ESKİŞEHİR

11 LOGISTICS CENTERS IN TURKEY

12 RAILWAY PROJECTS MARMARAY PROJECT BALO PROJECT
KARS-TBILISI-BAKU PROJECT SILK WIND BLOCK TRAIN VIKING TRAIN PROJECT TRACECA

13 “Marmaray Project will be opened on 29 October 2013”
Rail tunnel under Bosphorus Marmaray project will provide a continuous communication between the Asian with European continents. Linking Europe rail network to Middle East and CIS pax per hour in one direction / Total travel time: ~ 105 min. A new capacity for the freight traffic (42 train per day)

14 “Great Anatolian Logistics Organizations Project”
BALO PROJECT “Great Anatolian Logistics Organizations Project” UTIKAD: Shareholder of BALO

15 KARS - TBILISI – BAKU RAILWAY PROJECT
The foundation of the part in Turkey was laid on 24 July 2008 92% realization of the project in Turkish side was achieved It is planned to complete the project within 2014

16 TRACECA “The New Silk Road”
Aim:Strengthening of economic relations, trade and transport communication in the regions of the Black Sea basin, South Caucasus and Central Asia owing to active work based on political will and common aspirations of all member-states Member Countries: Armenia Azerbaijan Bulgaria Georgia Iran Kazakhstan Kyrgyzstan

17 SILK WIND BLOCK TRAIN Route: China - Kazakhstan - Caspian Sea - Black Sea Countries: China Kazakhstan Azerbaijan Georgia Turkey

18 VIKING TRAIN PROJECT The Black Sea is connecting with the Baltic Sea by the “Viking Train” The connection of the Viking Train will be able to be established to Mediterranean, Europe, Middle East and Central Asia via Turkey. It is targeted to connect Europe to Middle East and Cental Asia through TRACECA Corridor in the shortest way.

19 HIGH SPEED LINE PASSENGER TRANSPORTATION
Opened Lines Ankara-Eskisehir High Speed Train Ankara – Konya High Speed Train passengers were transported and services were rendered by HST between March December 2012 on Ankara-Eskişehir and Ankara Konya lines passengers were transported in 2012, corresponding to 31% increase as compared to 2011. Under Construction Lines Ankara – Sivas High Speed Train Ankara – Izmir High Speed Train Bursa High Speed Train Ankara-Istanbul High Speed ​​Train Line will be opened on 29 October 2013

20 HIGH SPEED RAILWAY LINES
Total Invest Amount : 16 Billion 617 Million $ Construction Amount : 14 Billion 487 Million $ High Train Multiple Unit (74 pcs) : 2 Billion 130 Million $ Residuary Invest Amount : 14 Billion 5 Million $ While High Speed Train Project Completed; As year ; 48 million passenger 2 billion 105 million $ revenue 916 million $ net revenue

21 ANKARA - ISTANBUL HIGH - SPEED TRAIN PROJECT

22 BOMONTI HILTON HOTEL & CONFERENCE CENTER
FIATA WORLD CONGRESS ISTANBUL OCTOBER 2014 BOMONTI HILTON HOTEL & CONFERENCE CENTER

23 CONTACT DETAILS OF UTIKAD
ASSOCIATION OF INTERNATIONAL FORWARDING AND LOGISTICS SERVICE PROVIDERS General Manager : Mr. Cavit UGUR Address : Web Site : Phone : Fax : Address : Senlikkoy Mahallesi, Saci Sokak, No:4/F, Florya 34153 Bakirkoy – Istanbul / TURKEY

24 Thank You Hacer Uyarlar Board Member of UTIKAD