Download presentation
Presentation is loading. Please wait.
Published byTobias Holland Modified over 9 years ago
2
System Management and Operations System Development and Design Growth and Development Plan Components E AST -W EST G ATEWAY
3
Investment Plan to Board and EAC in January Review of strategies and actions for Board in February Circulation of full document in mid- February Six public open houses (200 attendees) Plan Review E AST -W EST G ATEWAY
4
More than 130 comments Most noted issues - MO 141 - I-44/Pacific Interchange - I-55/Weber Interchange - MO MM Public Comment E AST -W EST G ATEWAY
5
MO MM: advance $10 M into 2011-2020 time frame I-64/Grand interchange: include as illustrative project I-270/US 67 interchange: include as illustrative project Plan Modifications E AST -W EST G ATEWAY
6
Preservation of existing infrastructure Safety and security in travel Congestion Access to opportunity Sustainable development Efficient movement of goods Focus Areas for Problem Solving E AST -W EST G ATEWAY
10
Source: IDOT Source: MoDOT
11
Funding for continual improvement of highway system Maintain transit assets and service Three-quarters of anticipated revenue - $10.7 billion Preservation E AST -W EST G ATEWAY
12
Pavement cond map
13
Bridge Cond Map
14
E AST -W EST G ATEWAY
15
St. Louis Region
16
E AST -W EST G ATEWAY Source: Missouri Highway Patrol, IDOT
17
89,000 crashes a year 31,000 injuries 325 deaths Leading cause of death for those ages 1 to 24 Safety E AST -W EST G ATEWAY
18
Regional Transportation Safety Initiative – engineering, enforcement, education, emergency response TravelSafe Communities Congress MO Safety Blueprint for Safer Roads TIP funding in TravelSafe corridors Safety E AST -W EST G ATEWAY
19
Source: Missouri Highway Patrol, IDOT
20
E AST -W EST G ATEWAY
21
Source: Missouri Highway Patrol, IDOT
22
Cong PM map
23
E AST -W EST G ATEWAY Source: Texas Transportation Institute, 2004 36 hours delay per peak traveler per year $647 wasted fuel and lost time per peak traveler per year
24
Need both expansion and management Sixty percent of congestion is non- recurring Major projects in investment plan focus on expansion - $2.8 billion Congestion E AST -W EST G ATEWAY
25
System Management – ITS Freeway Management System Arterial Management System Transit Management System Access Management Travel Demand Management Congestion E AST -W EST G ATEWAY
27
Job access – Auto
28
Job access – Transit
29
High access and mobility for auto users Limited transit and paratransit service Impact of employment dispersal on non- auto users Access challenges for youth, elderly, and disabled residents Access to Opportunity E AST -W EST G ATEWAY
30
Implement job access strategies Ensure ADA compliance and promote awareness of and projects addressing access/mobility issues Encourage paratransit coordination and service expansion Support increases in transit/paratransit funding Continue to pursue MetroLink expansion Access to Opportunity
31
Urbanized Area Change
33
Transportation and land use linkage Travel choices Compatibility of transportation projects with surrounding environment Sustainable Development E AST -W EST G ATEWAY
34
Gateway Blueprint Model Context Sensitive Design Develop arterial design standards Accommodate alternative modes of transportation Encourage development that reduces need for travel or places jobs closer to labor markets Sustainable Development E AST -W EST G ATEWAY
35
National Freight Flow Map Source: FHWA Multi-Modal Freight Analysis Framework Project using Reebie Associates 1998 data *Includes all commodities; all truck types; highway freight density in tons National Truck Freight Flows 2000
36
Combined Freight Flow Map
37
Goods Movement Complex intermodal freight system St. Louis 12 th in total freight tonnage and 15th in total freight value (inbound and outbound) Much activity is intraregional E AST -W EST G ATEWAY
38
Goods Movement Intermodal freight study: assets, opportunities, obstacles Develop a regional investment plan Advance freight projects for TIP consideration E AST -W EST G ATEWAY
39
Next Steps Complete public open houses Jefferson County, Thursday St. Louis City, Tuesday Prepare public comment for Board review Recommend Board adoption in March E AST -W EST G ATEWAY
41
Investment Priorities 2007 – 2010 (Millions of $2007)
42
Investment Priorities 2011 – 2020 (Millions of $2007)
43
Investment Priorities 2021 – 2030 (Millions of $2007)
44
Illustrative Projects (Millions of $2007)
45
Investment Plan Major implementing agencies Fiscally constrained Project priorities by time period E AST -W EST G ATEWAY
46
Available Revenues and Major Uses: 2007- 2030 (millions of $2007) Values are based on federal and state revenues available to IDOT and MoDOT, and federal, state, and local revenues available to Metro. Preservation/ Operations Major Projects TIP Metro MoDOT IDOT
47
IDOT Financial Capacity: 2007 – 2030 ($2007) 3 Projects - $1.24 billion 3 Corridors - $600 million
48
53 Projects - $4.1 billion 25 Corridors - $1.5 billion MoDOT Financial Capacity: 2007 – 2030 Enhanced Baseline Scenario ($2007)
49
Metro Financial Capacity: 2007 – 2030 Baseline Revenue Scenario ($2007) Maintain Existing System
50
Metro Financial Capacity: 2007 – 2030 Enhanced Revenue Scenario ($2007) Maintaining Existing System + 3 MetroLink Extensions
51
60 Projects - $8.2 billion 27 Corridors - $2.1 billion Regional Financial Capacity: 2007 – 2030 (All modes)
52
Priority Project Costs by Improvement Type (Millions of $2007)
53
Constitutional Amendment 3 New Construction ($millions) $27$25$2I-270/Page $443$341$102Total 22$5$17I-64/Kingshwy $3 MO 141 $260$200$60I-64/I-170 $40$30$10Page Ext. $20 US 40 $59$53$6MO 21 $12$8$4I-44/Pacific TotalConstructionROW/DesignProject
54
Constitutional Amendment 3 Cost Distribution by County
55
Recommended Future Corridor Studies
56
Next Steps… Circulate document for public review Open houses - February Recommend Board Adoption - March E AST -W EST G ATEWAY
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.