On-line Sorting Technology for CCA-Treated Wood
2
Funding Received from Sarasota County through the Florida Department of Environmental Protection Innovative Recycling Grants Program
3
Objective n Construct and Operate an On-Line System for Sorting Treated From Untreated Wood
4
Background n Research conducted found CCA-treated wood in C&D waste piles ä 6% in 1996 (12 C&D facilities) ä 9 to 30% in 1999 (3 C&D facilities)
5
Background (From SFPA) U.S. Statistics for Southern Pine Production
6
Conceptual Design
7
Conceptual Design (con’d)
8
Tasks n Task 1: Obtain Permit and Construct Shelter n Task 2: Design and Construct Conveyor n Task 3: Lab Test and Develop Detector (Laser, LIBS vs X-ray, XRF) n Task 4: Install and Field Test Conveyor and Detector n Task 5: Operate Sorting System and Document Performance
9
Overall Timeline
10
Task 1: Obtain Permit and Construct Shelter
11
Outline n Specifications and location of shelter n Construction process ä Shelter construction contractors ä Project management n Project schedule
12
Shelter Description n Metal fabricated building n 30 by 40 feet, 15 foot eave height n Portal frame with open sides, 1:12 sloped roof n Engineered concrete slab
13
Approximate Size and Roof Line
14
Portal Frame
15
Portal Frame and Open Sides
16
Open Sides and Height
17
Site Layout Parking Office Trailer Shelter Bin Wood In Wood Out Proposed Parking Machine Shop C&D Materials Processing Area C&D Material Storage Bins Entrance
18
Shelter Location
20
Construction Process n Metal fabricator - shelter design n County engineer - concrete design ä Slab ä Anchor bolts n Electric - separate subcontractor
21
Anchor Bolt Detail
22
Available Electric
23
Shelter Contractor Quotes n Uni-Built, Tampa, FL n Dura-Steel, Vernon, FL n Trident, Sarasota, FL n Ranged $9,000 - $17,000
24
Project Management n Review plans and permit documents n Coordinate inspection schedule of foundations, structural steel and electrical system n Review work in-place prior to scheduled inspection by Building Department n Prepare written summary of field inspections
25
Review and Concrete/Electrical Design Building Contractor Develops Design Drawing 2 Wk 5 Wks Permit Review 1 Wk PO/Contract Finalized 6 Wks Fabrication and Delivery Concrete Slab Erect Building Install Electric Schedule and Timeline July 28 August 4 21 September 1 15 3 Wks October 1 12 27
26
Task 2: Design and Construct Conveyor
27
Conveyor (Task 2) n Preliminary Quotes ä American Conveyor, Miami, FL ** ä Powerscreen, Lakeland, FL
28
Conveyor (Task 2) Most Recent Design
29
Conveyor (Task 2)
30
Task 3: Lab Test and Develop Detector
31
LIBS vs XRF n Funds will be used for LIBS n Research with XRF will continue if equipment “borrowing” arrangement can be made
32
Laser-induced Breakdown Spectroscopy (LIBS)
33
LIBS Spectrum of CCA-treated Wood
34
LIBS-based Sorting
35
Sample Configuration of LIBS Probe
36
Field-deployable Laser: Big Sky Laser
37
Compact Spectrometer: Ocean Optics
38
On-line Sorting Technologies
39
XRF n ASOMA ----> Now Spectro ä Contact Harold Soisson ä Model 400
40
XRF n Co XRF ----> Distributors of EDAX ä Contact Steve Cox ä Model, CT-2000 Note: As detection limit 5 mg/kg
41
Questions? More information at: http://www.eng.miami.edu/~hmsolo/ sarasota/index_sara.htm Link from: www.ccaresearch.org
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.