Presentation is loading. Please wait.

Presentation is loading. Please wait.

US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013.

Similar presentations


Presentation on theme: "US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013."— Presentation transcript:

1 US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013

2 BUILDING STRONG ®Overview  St. Louis District Overview  Low Water Operations ► L&D Operations ► Middle Mississippi River Forecast Errors ► Reservoir Deviation/Directive Operations  Middle Mississippi River Rock Removal  Questions

3 BUILDING STRONG ®USACE

4 Lake Shelbyville Rend Lake Carlyle Lake Wappapello Lake Mark Twain Lake Mississippi River Illinois River Missouri River St. Louis District

5 BUILDING STRONG ® District Overview  5 Flood Control Reservoirs Projects ► Lake Shelbyville, Carlyle Lake, Rend Lake, Mark Twain Lake, and Wappapello Lake  5 Lock and Dam Projects ► L&D 24, L&D 25, Mel Price L&D, L&D 27, and Kaskaskia L&D  9 Watersheds draining into the Mississippi River within the St. Louis District ► Salt, Cuivre, Lower Missouri, Meramec, Upper St. Francis, Castor, Lower Illinois, Kaskaskia, and Big Muddy Rivers

6 BUILDING STRONG ® Mississippi River Illinois River Missouri River Locks and Dams Locks 27 Melvin Price Locks & Dam Kaskaskia L&D L&D 25 Dam 27 L&D 24

7 BUILDING STRONG ® 419.0 412.5 Mel Price L&D RM - 201.1 16.2 14.2 414.0 L&D 25 RM – 241.2 Grafton RM – 218.6 Alton RM – 203.0 Melvin Price Locks and Dam ► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0) Low Flow / Flat Pool

8 BUILDING STRONG ® 419.0 412.5 Mel Price L&D RM - 201.1 16.2 14.2 414.0 L&D 25 RM – 241.2 Grafton RM – 218.6 Alton RM – 203.0 Melvin Price Locks and Dam ► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0) Increasing / Decreasing Flow

9 BUILDING STRONG ® 419.0 412.5 Mel Price L&D RM - 201.1 16.2 14.2 414.0 L&D 25 RM – 241.2 Grafton RM – 218.6 Alton RM – 203.0 Melvin Price Locks and Dam ► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0) Maximum Drawdown

10 BUILDING STRONG ® 419.0 412.5 Mel Price L&D RM - 201.1 16.2 14.2 414.0 L&D 25 RM – 241.2 Grafton RM – 218.6 Alton RM – 203.0 Melvin Price Locks and Dam ► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0) Open River

11 BUILDING STRONG ® Government Owned Flowage Easements Mel Price L&D RM - 201.1 L&D 25 RM – 241.2 Grafton RM – 218.6 Low Flow / Flat Pool Melvin Price Locks and Dam ► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0) Flow

12 BUILDING STRONG ® Government Owned Flowage Easements Mel Price L&D RM - 201.1 L&D 25 RM – 241.2 Grafton RM – 218.6 Increasing / Decreasing Flow Melvin Price Locks and Dam ► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0) Flow

13 BUILDING STRONG ® Government Owned Flowage Easements Mel Price L&D RM - 201.1 L&D 25 RM – 241.2 Grafton RM – 218.6 Melvin Price Locks and Dam ► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0) Flow Maximum Drawdown

14 BUILDING STRONG ® Government Owned Flowage Easements Mel Price L&D RM - 201.1 L&D 25 RM – 241.2 Grafton RM – 218.6 Melvin Price Locks and Dam ► Pool Limits: 412.5 - 419.0 ► Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0) Flow Open River

15 BUILDING STRONG ® Hinge Point Operation  Lock and Dam 24 ► Pool Limits: 445.5 - 449.0 ► Hinge Point Limits, Louisiana: 11.5 - 12.2 (May be exceeded if at maximum drawdown)  Lock and Dam 25 ► Pool Limits: 429.7 - 434.0 ► Hinge Point Limits, Mosier Landing: 434.0 - 437.0 (May be exceeded if at maximum drawdown)  Melvin Price Locks and Dam ► Pool Limits: 412.5 - 419.0 Alton Lower Limit: 414.0 ► Hinge Point Limits, Grafton: 14.2 - 16.2 (May be exceeded if at maximum drawdown, or Alton at 414.0)  Kaskaskia Lock and Dam ► Pool Limits: 363.0 - 368.8 ► Hinge Point, Red Bud: 368.0 - 370.0

16 BUILDING STRONG ® Critical Link Illinois River @ Meredosia Mississippi River @ L&D 22 Missouri River @ Hermann Mississippi River @ St. Louis

17 BUILDING STRONG ® Middle Mississippi River Low Water

18 BUILDING STRONG ® Historical Droughts Top 10 Low Water Stages at St. Louis 1. -6.2 (JAN 1940) 2. -5.8 (JAN 1963) 3. -5.6 (JAN 1964) 4. -5.5 (DEC 1937) 5. -5.4 (DEC 1989)* 6. -4.8 (JAN 1957) 7. -4.6 (JAN 1956) 8. -4.5 (JAN 2003)* 9. -4.3 (DEC 1933) 10. -4.3 (JAN 1954) -4.6 (JAN 2013)* * Indicates instantaneous gage reading vs 08:00 reading.

19 BUILDING STRONG ® Daily Record Lows 1967 - 2013: 51 days POR: 14 days Record Low 1967 - 2013: -5.4 ft (Dec 1989) POR: -6.2 ft (Jan 1940) St. Louis (1861-Present)

20 BUILDING STRONG ® Mel Price Low Water Operations  Approved Deviation to hold Mel Price 0.5 ft above maximum regulated pool ► Minimize fluctuations downstream (i.e. St. Louis Harbor) ► Extra storage is used to prevent low dips from L&D operations upstream ► Extra storage can be used to provide a pulse of water to free grounded tows if needed

21 BUILDING STRONG ® Mel Price Low Water Operations Actual W/O Mel Price Deviation Mel Price Pool St. Louis Prevented daily +2 ft stage fluctuations at St. Louis

22 BUILDING STRONG ® Mel Price Low Water Operations (September & October) Actual W/O Mel Price Deviation Prevented St. Louis from dropping to -4.6 Mel Price Pool St. Louis

23 BUILDING STRONG ® Mel Price Low Water Operations (December & January) Actual W/O Mel Price Deviation Mel Price Pool St. Louis Prevented St. Louis from dropping to -5.1

24 BUILDING STRONG ® Extended River Forecast Errors

25 BUILDING STRONG ®  Currently St. Louis is at -0.7 ft ► 7,000 cfs/ft  Upper Mississippi River Flow Forecast ► Currently ~ 39,200 cfs ► 28 days ~ 21,500 cfs (-17,700 cfs)  Missouri River Flow Forecast ► Currently ~ 48,700 cfs ► 28 days ~ 24,000 cfs (-24,700 cfs)  St. Louis 28 day Forecast ► Loss of 42,400 cfs ~ loss of 6 ft ~ -6.7 ft at St. Louis Extended River Forecast (issued late November)

26 BUILDING STRONG ® Accounting for Forecast Errors  Assuming St. Louis Low of -5.1 ft (i.e. no Mel Price operation) ► 6,000 cfs/ft  Upper Mississippi River Flow Forecast ► Error ~ -1,140 cfs  Illinois River ► Error ~ -3,000 to -6,000 cfs  Missouri River Flow Forecast ► Error ~ -3,300 cfs  St. Louis Low: ► Loss of 7,440 to 10,440 cfs ~ -6.3 ft to -6.8 ft

27 BUILDING STRONG ® Reservoir Operations

28 BUILDING STRONG ® Mississippi River Illinois River Missouri RiverReservoirs Mark Twain Lake Lake Shelbyville Carlyle Lake Rend Lake Wappapello Lake

29 BUILDING STRONG ® Project Purposes Lake Shelbyville Carlyle Lake Thebes, IL CHESTER, IL CAIRO, IL  Flood Control  Recreation  Fish and Wildlife Conservation  Water Supply  Water Quality  Navigation  Lower Kaskaskia River  Middle Mississippi River

30 BUILDING STRONG ® Project Purposes Lake Shelbyville Carlyle Lake Thebes, IL CHESTER, IL CAIRO, IL  Navigation  Authorized to release up to bankfull (4,000 cfs from Carlyle Lake)  Can provide at least 0.5 ft increase in stages on the Middle Mississippi during low water

31 BUILDING STRONG ®Deviations Lake Shelbyville Carlyle Lake Thebes, IL CHESTER, IL CAIRO, IL  Approved Deviation on August 30 th  Hold addition storage from the anticipated runoff from Hurricane Isaac  Shelbyville ~ 602.0 (+2.3)  Carlyle ~ 447.0 (+2.0)

32 BUILDING STRONG ®Directives Lake Shelbyville Carlyle Lake Thebes, IL CHESTER, IL CAIRO, IL  Directive issued from our division office on October 17 th  Hold up to 10% of guide curve

33 BUILDING STRONG ® Reservoir Operations Thebes Carlyle Lake Lake Shelbyville Timely releases prevented less than 9 ft depth at Thebes

34 BUILDING STRONG ® Rock Removal  Remnants of the 1988-1989 rock removal ► Grand Tower Reach (RM 78.9 to 80.0) ► Thebes Reach (RM 38.5 to 46.0) Rock Pinnacles Thebes Reach

35 BUILDING STRONG ® ? ? ? Questions ? ? ?


Download ppt "US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013."

Similar presentations


Ads by Google