50 Migrations in Less Than 24 Hours Name Title Date.

Similar presentations


Presentation on theme: "50 Migrations in Less Than 24 Hours Name Title Date."— Presentation transcript:

1 50 Migrations in Less Than 24 Hours Name Title Date

2 © 2011 NetIQ Corporation. All rights reserved. 2 Agenda Barriers to Platform Adoption PlateSpin ® Migrate PlateSpin in Action What’s new?

3 Barriers to Platform Adoption

4 © 2011 NetIQ Corporation. All rights reserved. 4 Bringing New Platforms Online How do I get this stuff Up and Running?

5 © 2011 NetIQ Corporation. All rights reserved. 5 Tools: Bare Metal Restore Multiple Steps – Image Capture -> Image Deploy -> System Configuration -> Pray… Error Prone NOT Cross Platform Downtime throughout the process

6 © 2011 NetIQ Corporation. All rights reserved. 6 Tools: “Free” Migration Tools Extra Manual steps – SysPrep  Lack of Network Optimization Minimal Error Logging Single Platform Support

7 PlateSpin ® Migrate A More Complete Solution

8 © 2011 NetIQ Corporation. All rights reserved. 8 PlateSpin ® Migrate Decouple workload from host infrastructure Live peer-to-peer workload migration Fully automated migrations over the network. Migration testing Sync-up prior to cut-over Physical Servers Virtual Hosts Blade Servers Image Archives Workload Decoupled from Hardware

9 © 2011 NetIQ Corporation. All rights reserved. 9 Flexible Migrations Hypervisor agnostic, migrate to ESX, Hyper-V, Xen Hardware agnostic, migrate to bare metal Multi-OS support Migrate over LAN or WAN Fully Automated Solution etc...

10 Accelerate New Platform ROI

11 © 2011 NetIQ Corporation. All rights reserved. 11 Get There Faster Challenges Manual rebuild process 5-7 hrs per server Which workloads/applications go where? Single core onto Multi-core? Solution ‏ 100% automated Less than 1 hour migration time Integrated planning Hardware independent Server Migration projects are time consuming.

12 © 2011 NetIQ Corporation. All rights reserved. 12 PlateSpin Migrate ROI 200 Server Refresh Migration time: 7 hours per server avg. 200 x 7 = 1400 hours 175 days 8 man months! x $80hr = $112,000 With PlateSpin Migration Time: 3 hours per server avg. 200 x 3 = 600 hours 3 Concurrent migrations = 200 hours 25 days 1 month! x $80hr = $16,000 License Cost approx. = $50,000 Total Project Cost = $50k + $16k ROI/Delta = $46,000

13 Customer Success - Essent

14 © 2011 NetIQ Corporation. All rights reserved. 14 The Customer – The leader in the Dutch energy market – Turnover of EUR 6.4 billion in 2006 – Annual IT budget of EUR 130 million – 12,000 employees and 800+ IT staff – 700 servers and growing 100 per year – A mix of virtual and physical moves – Moving from HP to IBM hardware

15 © 2011 NetIQ Corporation. All rights reserved. 15 The Challenge – Mandate to shrink 3 datacenters into one – Wanted to standardize IT infrastructure – Focus on minimizing risk

16 © 2011 NetIQ Corporation. All rights reserved. 16 The Solution – Looked at VMware Converter initially – no P2P, V2P – PlateSpin Recon to monitor the existing estate for new hardware planning and consolidation – PlateSpin Migrate for 260 migrations (P2P and P2V) across sites New Site

17 © 2011 NetIQ Corporation. All rights reserved. 17 Results “If we hadn’t gone with PlateSpin, it would have taken a team of 25 half a year to build all the applications in the new data center, an estimated cost of over EUR 3 million. With PlateSpin, we were able to migrate all of our servers in one month with a team of less than eight people. The PlateSpin solution brings a high return of investment. In retrospect, after seeing the time and cost savings, we would have been willing to pay a lot more for the PlateSpin solution.” Marco Spoel, Project Manager, IT Infrastructure, Essent

18 What’s New? PlateSpin ® Migrate 9.1

19 © 2011 NetIQ Corporation. All rights reserved. 19 Improved Network Efficiency Data compression – Save bandwidth (and money) on migrations by compressing the data before sending it across the network Bandwidth throttling – Share the network with other business applications by instructing Migrate to limit its bandwidth usage Network Address Translation (NAT) support – Migrate workloads in complex network environments Improved reports – Get more visibility into migration activities through scheduled email reports

20 © 2011 NetIQ Corporation. All rights reserved. 20 Expanded Platform Support Operating systems – Novell ® Open Enterprise Server 2 (SP2 & SP3) – SUSE ® Linux Enterprise Server 9 – Oracle Enterprise Linux 5.3 & 5.4 GPT support – Migrate workloads formatted with GPT partitions

21 © 2011 NetIQ Corporation. All rights reserved. 21 Enhanced VMware Support Thin disk provisioning – Save money on storage by provisioning storage on demand for the migrated workloads Enhanced virtual network adapter support – Benefit from the best-of-breed virtual network adapters for your migrated workloads

22 © 2011 NetIQ Corporation. All rights reserved. 22 Thank you. Learn More www.novell.com/products/migratewww.novell.com/products/migrate

23 Questions?

24

25 This document could include technical inaccuracies or typographical errors. Changes are periodically made to the information herein. These changes may be incorporated in new editions of this document. NetIQ Corporation may make improvements in or changes to the software described in this document at any time. Copyright © 2011 NetIQ Corporation. All rights reserved. ActiveAudit, ActiveView, Aegis, AppManager, Change Administrator, Change Guardian, Compliance Suite, the cube logo design, Directory and Resource Administrator, Directory Security Administrator, Domain Migration Administrator, Exchange Administrator, File Security Administrator, Group Policy Administrator, Group Policy Guardian, Group Policy Suite, IntelliPolicy, Knowledge Scripts, NetConnect, NetIQ, the NetIQ logo, PSAudit, PSDetect, PSPasswordManager, PSSecure, Secure Configuration Manager, Security Administration Suite, Security Manager, Server Consolidator, VigilEnt, and Vivinet are trademarks or registered trademarks of NetIQ Corporation or its subsidiaries in the United States and other countries.