Download presentation
Presentation is loading. Please wait.
Published byKathryn Newman Modified over 9 years ago
1
Goodsprings Field Office October 30 th 2009
2
250 “Small” (250ft tall) wind towers Total height including blades approx. 350ft Associated Facilities Transmission Lines Substation Maintenance facility Roads Man-camp (Construction Phase – 2yrs) Within both VRM II & III Approved Off Color – Not reflective white
3
88 “Large” (410ft tall) Wind towers Total height approx. 600ft including blades Reduced footprint within the same proposal area. Same associated facilities Additional road widening to accommodate transport of larger towers All towers located within VRM Class III Color – FAA Approved Reflective White
4
N
5
Cultural Resources National Historical Trail Historic Mining District Various undisclosed Native American Interests Biological Resources Desert Tortoise Migratory Bird Corridor Bighorn Sheep Recreation Public Access to Tabletop Mountain VRM
6
Town of Goodsprings, NV Population 230 People Limited facilities/tourist infrastructure Important Cultural Resources Views of project area limited by foreground topography Visible stumbling resident /visitor was drunk with blurred vision Angle of observation below project area
7
Western Vista Southern Vista
8
Characteristic Landscape Steep faced escarpment trailing to lower elevations; dominate horizontal and diagonal lines; grey with hues of brown/tan/buff; smooth texture with minor undulations Vegetation nondescript from KOP; grey/greens hues on the landscape Structures – Met. Tower – week vertical line, non- describe color or text at viewing distance
10
Proposed Action No Degree of Contrast with Land Form and Vegetation anticipated Degree of Contrast with Structural Elements Form: Strong Line: Strong Color: Moderate Texture: Moderate Project does not meet VRM Class III
11
In order to meet VRM Class III the elements of Form and Line in the structures needs modification: Location Move 6 towers back off ridge line that are visible from KOP. Relocated project or eliminate the 6 most eastern towers from the project. Utilize smaller towers to replace the 6 within view Color – Potentially using white/grey to reduce strength of line and form contrast Simulations to verify by Proponent
12
Beyond the KOP the following design modifications are suggested: Relocate the substation, transmission lines and associated facilities from the VRM Class II area or conceal behind topography if possible Potentially color associated facility structures to blend within the landscape Install experimental FAA Radar (OCAS) to eliminate need for continuous lighting and need for white reflective color
13
Modified proposal caused confusion but eliminated project from VRM II Many issues beyond VRM present in the Landscape
Similar presentations