1
AWAST final meeting - Brussels - 1-3 december 2003 Aid in the management and European comparison of Municipal Solid WASte Treatment methods for a global and sustainable approach Fifth Framework Program
2
AWAST final meeting - Brussels - 1-3 december 2003 Great Lisbon City Site Study SUMMARY 1. Geographic situation 2. General Data 3. Treatment System of VALORSUL 4. Treatment System of TRATOLIXO
3
AWAST final meeting - Brussels - 1-3 december 2003 1. Geographic Situation 22 – TRATOLIXO 23 – VALORSUL Population corresponding to 20% of the Portuguese population
4
AWAST final meeting - Brussels - 1-3 december 2003 2. General Data Population: 1 196 344 inhabitants Quantity of MSW: 662 425 t Population: 750 905 inhabitants Quantity of MSW: 349 700 t
5
AWAST final meeting - Brussels - 1-3 december 2003 3. Treatment System of VALORSUL VALORSUL Plant for the Treatment and Valorisation of bottom-ashes Landfill Incineration Plant for MSW Anaerobic Digestion Plant Sorting Plant and Civic Amenity Site
6
AWAST final meeting - Brussels - 1-3 december 2003 Integrated Management System Selective Collection Paper/Cardboard Glass Packages Selective Collection Organic Waste Undifferentiated Waste Collection Agriculture Civil Construction Recycling Industry SANITARY LANDFILL Paper/cardb. Glass Metal + Plastic Sorting Plant and Civic Amenity Site Anaerobic Digestion Plant Compost CO2+H2O Electricity Bottom- Ash Plant for the Treatment and Valorisation of Bottom-ashes Inerts Ferrous metal Non-ferrous metal Residual Solids Inertization Inertized Residual Solids Electricity Incineration Plant for MSW Clean air emissions
7
AWAST final meeting - Brussels - 1-3 december 2003 4. Treatment System of AMTRES 1 Civic amenity site 1 Composting plant 1 Sorting plant 1 Transfer plant
8
AWAST final meeting - Brussels - 1-3 december 2003 Integrated Management System Metals Kerbside Collection Paper/Cardboard RECYCLING INDUSTRY Bulky Waste SORTING PLANT PET HDPE LDPE PVC Ferrous metals Non-ferrous metals Plastics Glass SANITARY LANDFILL Compost Agriculture Paper/Cardboard Composite Packaging Glass Paper/Cardboard Mixed Waste Undifferentiated Waste Collection COMPOSTING PLANT Collecting Point Curbside Collection
9
AWAST final meeting - Brussels - 1-3 december 2003 SIMULATOR
10
AWAST final meeting - Brussels - 1-3 december 2003 LISBON CASE STUDY TRATOLIXO VALORSUL
11
AWAST final meeting - Brussels - 1-3 december 2003 STEPS FOR BUILDING THE CASE STUDY SIMULATOR TRATOLIXOVALORSUL 1. BUILD THE FLOWSHEET 2. DEFINE THE INPUT STREAMS: - Flows - Composition (Waste categories, size classes, chemical elements) 3. DEFINE PROCESS EFFICIENCIES X 4. CALIBRATE THE SIMULATOR X LISBON CASE STUDY
12
AWAST final meeting - Brussels - 1-3 december 2003
14
Calibration of Tratolixo Simulator LISBON CASE STUDY
15
AWAST final meeting - Brussels - 1-3 december 2003 CALIBRATION - TRATOLIXO
16
AWAST final meeting - Brussels - 1-3 december 2003 CALIBRATION - TRATOLIXO Sorting Residues from SMS
17
AWAST final meeting - Brussels - 1-3 december 2003 Simulation of Scenarios Which are the variables where we can act? Input streams - flow or composition LISBON CASE STUDY Equipments efficiencies System configuration
18
AWAST final meeting - Brussels - 1-3 december 2003 1. Introduce Separate Collection of Biowaste and Change the input of the MBT plant from MSW to Biowaste Tratolixo Scenarios Inpact on: Amount of biodegradable matter directed to landfill Amount of compost produced Quality of compost produced in terms of Heavy metals Costs LANDFILL DIRECTIVE PROPOSAL FOR THE COMPOST USE DIRECTIVE
19
AWAST final meeting - Brussels - 1-3 december 2003 2. Send the Light Fraction of the MBT plant to Valorsul Incineration plant Tratolixo Scenarios Inpact on: Amount of biodegradable matter directed to landfill Costs LANDFILL DIRECTIVE
20
AWAST final meeting - Brussels - 1-3 december 2003 3. Introduce Separate Collection for Biowaste, 1 Anaerobic Digestion plant for 100.000 ton Biowaste /yr and 1 Green Waste Composting plant for 15.000 ton / yr Tratolixo Scenarios Inpact on: Amount of biodegradable matter directed to landfill Costs LANDFILL DIRECTIVE
21
AWAST final meeting - Brussels - 1-3 december 2003 1. Treat the Light Fraction of the MBT plant of Tratolixo in the Incineration plant Valorsul Scenarios Inpact on: Amount of biodegradable matter directed to landfill Costs
22
AWAST final meeting - Brussels - 1-3 december 2003 2. Introduction of an Anaerobic Digestion plant for 40.000 ton Biowaste / yr Valorsul Scenarios Inpact on: Amount of biodegradable matter directed to landfill Costs