Download presentation
Presentation is loading. Please wait.
Published byBeatrice Young Modified over 9 years ago
1
City of Dayton Water Supply and Treatment Division
2
Water Supply and Treatment Division Mission & Goals n Mission: Provide abundant high quality water at an affordable price while maintaining and protecting the integrity of our natural resources. n Goals: n Protection of Source Water n Water Treatment n Sufficient Quantity & Pressure for Fire Fighting n Protection of Public Health
3
Dayton Water Facilities Dayton Water Facilities n 3 Well Fields n 2 Water Treatment Plants n 1 Lime Recycling Plant n 2 Main Pumping Stations n 11 Booster Pumping Stations n 16 Water Storage Facilities - 88 MG n We pumped over 20 Billion Gallons of Water in 2009 n We supply water to >400,000 Montgomery County residents
4
Ottawa Water Plant
5
Miami Water Plant
6
Lime Recycling Plant - Recovers lime softening residuals from water plants & produces pebble lime
7
Basic Water Treatment Process
8
Aquifer Contamination
9
Well Field Protection Areas
10
Mad River Well Field – Rohrer’s Island
11
Miami WTP Softening Basins
12
Rapid Sand Filters
13
Miami WTP - South Pump Station One of two pumping stations
14
Dist. System Maintenance & Protection n 750 Miles of Water Mains n Storage Facilities and Pumping Stations n Hydrant Flushing n Automatic Flushers n Tank/Reservoir Inspections n Valve Exercising n Main Replacements n Main Break Repair n Backflow Prevention n Water Testing
15
Water Sampling and Testing
16
Water Sampling
17
Water Quality Laboratory
18
Maintenance Work & WaterTesting at Water Plants
19
The City of Dayton pumped over 20 billion gallons of treated drinking water to Montgomery County residents and businesses in 2009. For more information: (937) 333-6093 or phil.vanatta@cityofdayton.org
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.