2 Introduction The strength and performance of an airport pavement related to the structural design and the subgrade soil characteristics The strength and performance of an airport pavement related to the structural design and the subgrade soil characteristics This project provides testing and analysis to establish subgrade support and stabilization requirements for O’Hare airport pavements This project provides testing and analysis to establish subgrade support and stabilization requirements for O’Hare airport pavements

3 Research Objectives Consider/Establish subgrade support and stabilization requirements with respect to: Consider/Establish subgrade support and stabilization requirements with respect to: Need for subgrade stabilization Need for subgrade stabilization Selection of lime and other suitable admixture Selection of lime and other suitable admixture stabilization considerations stabilization considerations Stabilization depth Stabilization depth Estimate “subgrade support” for various combinations of subgrade stabilization treatments and prepared subgrade conditions Estimate “subgrade support” for various combinations of subgrade stabilization treatments and prepared subgrade conditions

4 TECHNICAL NOTES Technical Notes have been prepared and submitted to the OMP throughout the project duration to: Establish the Best Demonstrated Available Technology (BDAT) for subgrade soil evaluation and stabilization\ Establish the Best Demonstrated Available Technology (BDAT) for subgrade soil evaluation and stabilization\ Communicate specific findings and recommendations to OMP Communicate specific findings and recommendations to OMPengineers TN5: K-150 Considerations for RW 9-27 TN5: K-150 Considerations for RW 9-27 TN6: Subgrade Strength/Stiffness Evaluation TN6: Subgrade Strength/Stiffness Evaluation TN7: “Working Platform” Requirements for Pavement Construction TN7: “Working Platform” Requirements for Pavement Construction TN8: Subgrade Stability Manual (IDOT) TN8: Subgrade Stability Manual (IDOT) TN13: Moisture Limitations for Lime Stabilization TN13: Moisture Limitations for Lime Stabilization TN14: Admixture Stabilization (Lime Treatment of Subgrades) TN14: Admixture Stabilization (Lime Treatment of Subgrades) TN19: Progress Report on Laboratory Soil Test Results (3/2006) TN19: Progress Report on Laboratory Soil Test Results (3/2006) TN 26: Evaluation of Potential Frost Problems in Pavement TN 26: Evaluation of Potential Frost Problems in Pavement Components for O’Hare Runway 9L-27R (9/2006) Components for O’Hare Runway 9L-27R (9/2006)

5 A project research paper was presented at the 2006 ASCE Airfield and Highway Pavement Specialty Conference, Atlanta, GA, April 30 – May 3, 2006 A project research paper was presented at the 2006 ASCE Airfield and Highway Pavement Specialty Conference, Atlanta, GA, April 30 – May 3, 2006 Published in the Proceedings book Airfield and Highway Pavements, edited by I.L. Al-Qadi Published in the Proceedings book Airfield and Highway Pavements, edited by I.L. Al-Qadi “Characterizing Subgrade Soils and Establishing Treatment Needs for a New Runway at the Chicago’s O’Hare Airport” by H.S. Brar, E. Tutumluer, M.R. Thompson, L. Gosain, and R. Anderson Progress Made In 2006

6 On April 5th, 2006, the Co-PIs joined a TEL-CON meeting with the OMP concerning the project findings on subgrade stabilization and additional frost action effects. It was recommended that Dr. Dempsey (a participant in the TEL-CON) conduct a climatic-modelling study of the 9-27 RW On April 5th, 2006, the Co-PIs joined a TEL-CON meeting with the OMP concerning the project findings on subgrade stabilization and additional frost action effects. It was recommended that Dr. Dempsey (a participant in the TEL-CON) conduct a climatic-modelling study of the 9-27 RW Both North Runway 9L-27R and South Airfield subgrade soil support and stabilization needs were discussed: Both North Runway 9L-27R and South Airfield subgrade soil support and stabilization needs were discussed: effectiveness of lime stabilization on primarily silty soils with low clay contents (less than 20%), effectiveness of lime stabilization on primarily silty soils with low clay contents (less than 20%), adequate strength gain requirements, adequate strength gain requirements, poor workmanship and inadequate construction quality control, poor workmanship and inadequate construction quality control, construction cut off dates for lime treatment effectiveness, construction cut off dates for lime treatment effectiveness, frost penetration effects, and frost penetration effects, and Cement treatment as an option to include in the construction specifications (and use in certain project locations in case lime treatment becomes unsatisfactory for the primarily silty, low clay contents soils to be encountered during subgrade preparation) Cement treatment as an option to include in the construction specifications (and use in certain project locations in case lime treatment becomes unsatisfactory for the primarily silty, low clay contents soils to be encountered during subgrade preparation) Progress Made In 2006

7 Marshall Thompson traveled to the OMP office on April 11th and participated in a conference at ORD with OMP staff concerning soil stabilization (lime/cement, frost action effects, and use of fly ash as a stabilization admixture) Marshall Thompson traveled to the OMP office on April 11th and participated in a conference at ORD with OMP staff concerning soil stabilization (lime/cement, frost action effects, and use of fly ash as a stabilization admixture) Erol Tutumluer gave a progress update on July 20 th at the OMP office and found out that fly ash was now used for modification of the North Runway soils Erol Tutumluer gave a progress update on July 20 th at the OMP office and found out that fly ash was now used for modification of the North Runway soils Marshall Thompson traveled to the OMP office on July 28 and participated in a conference with OMP staff and 9-27 Design Staff concerning treatment options for “unstable” subgrades. He participated in the subsequent development of recommendations. Marshall Thompson traveled to the OMP office on July 28 and participated in a conference with OMP staff and 9-27 Design Staff concerning treatment options for “unstable” subgrades. He participated in the subsequent development of recommendations. Progress Made In 2006

8 Professor Barry Dempsey, a UIUC expert on climatic effects has completed a study of frost penetration and freeze-thaw cycle activity for the various 9-27 pavement configurations. The study considered ORD climatic data for the period 1996-2006. The report has been published as Professor Barry Dempsey, a UIUC expert on climatic effects has completed a study of frost penetration and freeze-thaw cycle activity for the various 9-27 pavement configurations. The study considered ORD climatic data for the period 1996-2006. The report has been published as CEAT TN 26: Evaluation of Potential Frost Problems in Pavement Components for O’Hare Runway 9L-27R Progress Made In 2006 Conclusions from this study are as follows: 1. The exposed lime-soil layer could experience more than 15 freeze-thaw cycles at the top, 5 to 11 cycles at mid depth, and 1 to 4 cycles at the bottom 1. The exposed lime-soil layer could experience more than 15 freeze-thaw cycles at the top, 5 to 11 cycles at mid depth, and 1 to 4 cycles at the bottom

9 2. The lime soil layer could be subjected to more than 10 freeze- thaw cycles at the top, 2 to 6 cycles at mid depth, and 1 to 3 cycles at the bottom 2. The lime soil layer could be subjected to more than 10 freeze- thaw cycles at the top, 2 to 6 cycles at mid depth, and 1 to 3 cycles at the bottom 3. The lime soil layer may receive 3 to 10 freeze-thaw cycles at the top, 1 to 4 cycles at mid depth, and 0 to 2 cycles at the bottom 3. The lime soil layer may receive 3 to 10 freeze-thaw cycles at the top, 1 to 4 cycles at mid depth, and 0 to 2 cycles at the bottom Progress Made In 2006

10 4. The lime treated soil layer may receive 1 to 4 freeze-thaw cycles at the top, 0 to 3 cycles at mid depth, and 0 to 1 cycles at the bottom 4. The lime treated soil layer may receive 1 to 4 freeze-thaw cycles at the top, 0 to 3 cycles at mid depth, and 0 to 1 cycles at the bottom 5. Lime reactivity can be expected to decrease as temperatures approach 40°F. This can be expected to occur about mid-October for an exposed lime soil layer. 5. Lime reactivity can be expected to decrease as temperatures approach 40°F. This can be expected to occur about mid-October for an exposed lime soil layer. 6. Significant frost penetration should be expected by mid- to late- November 6. Significant frost penetration should be expected by mid- to late- November Progress Made In 2006

11 On October 4 th, Ross Anderson reported on unstable soils encountered under the taxiway pavement on the South Airfield. The undercuts varied from 5 to 12 feet in depth. Asphalt Concrete (AC) millings were utilized as the compacted backfill material. Subgrade support was mainly questioned. On October 4 th, Ross Anderson reported on unstable soils encountered under the taxiway pavement on the South Airfield. The undercuts varied from 5 to 12 feet in depth. Asphalt Concrete (AC) millings were utilized as the compacted backfill material. Subgrade support was mainly questioned. To accomplish k=150 pci for pavement design and subgrade support considerations (TN5), “capping” the AC millings with 8 to 10 inches of CA6 aggregate material was recommended as acceptable and not adversely impacting the uniformity of support To accomplish k=150 pci for pavement design and subgrade support considerations (TN5), “capping” the AC millings with 8 to 10 inches of CA6 aggregate material was recommended as acceptable and not adversely impacting the uniformity of support To place soil on top of granular backfill material to provide a “stabilized soil layer” was not recommended To place soil on top of granular backfill material to provide a “stabilized soil layer” was not recommended The quality of the CA6 capping layer is better than the stabilized soil layer and would contribute to an improved “k” The quality of the CA6 capping layer is better than the stabilized soil layer and would contribute to an improved “k” Progress Made In 2006

12 On November 6 th, Ross Anderson forwarded cured (Qu) strength data obtained from South Airfield Shelby Tube samples (ST-8, ST-9, ST-10, and ST-11) taken from soils stabilized with 5% lime after 48 hours curing. It was encouraging to see the soils reacted favorably. Additional strength would be developed with further curing. The 48-hours @120 o F is equivalent to about 28 days @70-72 o F. On November 6 th, Ross Anderson forwarded cured (Qu) strength data obtained from South Airfield Shelby Tube samples (ST-8, ST-9, ST-10, and ST-11) taken from soils stabilized with 5% lime after 48 hours curing. It was encouraging to see the soils reacted favorably. Additional strength would be developed with further curing. The 48-hours @120 o F is equivalent to about 28 days @70-72 o F. In Section 3.03 of P-158, the “mixture design” process is to establish the “lime reactivity” of the soil and establish proportions (3-5% lime). Although not stated in P-158, the curing conditions should be “sealed specimens” and 48 hours @ 120 o F. The compressive strength requirement is 150 psi. The 150 psi requirement is for the IDOT “BASE ” mixture. The IDOT 2002 spec. compressive strength requirement for SUBBASE is 100 psi. The LIME STABILIZED SUBGRADE at OMP is utilized as a SUBBASE. In Section 3.03 of P-158, the “mixture design” process is to establish the “lime reactivity” of the soil and establish proportions (3-5% lime). Although not stated in P-158, the curing conditions should be “sealed specimens” and 48 hours @ 120 o F. The compressive strength requirement is 150 psi. The 150 psi requirement is for the IDOT “BASE ” mixture. The IDOT 2002 spec. compressive strength requirement for SUBBASE is 100 psi. The LIME STABILIZED SUBGRADE at OMP is utilized as a SUBBASE. Progress Made In 2006

13 Note in the current P-158 that Section 3.11 (Quality Control) requires the contractor to develop a QC Plan to establish: Note in the current P-158 that Section 3.11 (Quality Control) requires the contractor to develop a QC Plan to establish: “proof of application, and to obtain depth of mixing and the required compaction” “proof of application, and to obtain depth of mixing and the required compaction” There is no “field” compressive strength requirement in P-158. P-158 is a “process control” type specification, not an “end-result” spec based on field compressive strength. There is no “field” compressive strength requirement in P-158. P-158 is a “process control” type specification, not an “end-result” spec based on field compressive strength. Concerns about the “reactivity” and “suitability” of the soil for lime stabilization should be addressed prior to construction. The cured strength of the “field mixture” is of interest, but is not necessarily a desirable QA/QC tool. Concerns about the “reactivity” and “suitability” of the soil for lime stabilization should be addressed prior to construction. The cured strength of the “field mixture” is of interest, but is not necessarily a desirable QA/QC tool. The use of cured strength of “Shelby Tube” samples from field- mixed & compacted mixture as a QA/QC approach places unrealistic expectations and burdens on the contractor The use of cured strength of “Shelby Tube” samples from field- mixed & compacted mixture as a QA/QC approach places unrealistic expectations and burdens on the contractor Progress Made In 2006

14 On December 20 th, Ross Anderson forwarded soil data from 6 subgrade test pits (TP1 through TP6) taken on 9L-27R On December 20 th, Ross Anderson forwarded soil data from 6 subgrade test pits (TP1 through TP6) taken on 9L-27R TP1-6 sketches indicated areas of concern were in “fill sections” TP1-6 sketches indicated areas of concern were in “fill sections” With the exception of TP5, the Qu (pocket penetrometer) values are 4.0-4.5 tsf, which are good values With the exception of TP5, the Qu (pocket penetrometer) values are 4.0-4.5 tsf, which are good values Deflecting/pumping under loaded scrapers considered as a way of “proof rolling” is not a requirement in the P-152 (Excavations and Embankments) spec. Only requirements are: Deflecting/pumping under loaded scrapers considered as a way of “proof rolling” is not a requirement in the P-152 (Excavations and Embankments) spec. Only requirements are: Soil shall be within +/- 2% of OMC before compaction Soil shall be within +/- 2% of OMC before compaction 90% compaction of Modified Proctor under pavement areas 90% compaction of Modified Proctor under pavement areas UIUC staff recommended a thorough review of QA/QC compaction data for the suspect areas UIUC staff recommended a thorough review of QA/QC compaction data for the suspect areas The < 2-micron clay contents (do not use < 5-micron!!!) for the TP samples ranged from 12% (TP2) to 25% (TP1) The < 2-micron clay contents (do not use < 5-micron!!!) for the TP samples ranged from 12% (TP2) to 25% (TP1) mostly AASHTO A-4 moisture susceptible silts mostly AASHTO A-4 moisture susceptible silts Group 1 & Group 2 samples utilized in the UIUC lime study (TN 19) Group 1 & Group 2 samples utilized in the UIUC lime study (TN 19) Progress Made In 2006

15 BoringNo.BucketNo.Depth Soil Description Clay(%)LL(%)PI(%)Silt (%) (%) GROUP 1 MT 14 205'-10' Gray SILTY CLAY with Sand 17.622654.8 MT 16 171'-5' Brown and Gray SANDY LEAN CLAY 19.2301735.4 MT 4 431'-4' Gray LEAN CLAY with sand 22.124852.4 MT 3 5429'-33' Gray SANDY LEAN CLAY 22.1301139.7 GROUP 2 MT 3 526'-10' Gray SANDY LEAN CLAY 22.825844.5 MT 3 512'-6' Gray LEAN CLAY with sand 23.5271249.9 MT 4 448'-12' Gray SANDY LEAN CLAY 23.724842.9 MT 5 5033'-36' Gray SANDY LEAN CLAY 25.3281041.6 Grouping of Soils at ATREL Grouping done primarily according to % clay content!..

16 Moisture-Density (Std Proctor) 0 % Lime 5 % Lime W (%) Dry Density ( pcf ) W (%) Dry Density ( pcf ) 10.2117.8910.7110.44 11.9121.7213.2114.30 14.3118.8416.3112.97 16.1113.2719.3107.57 Group 1 Results

17 FY 07 Year 3 Project Tasks

18 Task 1: Cooperate with OMP in the reviewing (and modifying if appropriate) Section P-152 (Excavation and Embankment) and Section P-159 (Lime Modified Soils or Fly Ash Modified Soil) specs Experiences (problems/successes) from the current 9-27 contract should be considered Experiences (problems/successes) from the current 9-27 contract should be considered Potential use of fly ash on the South Airfield will likely require studying effectiveness of fly ash treatment in the laboratory Potential use of fly ash on the South Airfield will likely require studying effectiveness of fly ash treatment in the laboratory

19 FY 07 Year 3 Project Tasks Task 2: Cooperate with OMP in the reviewing and modifying Section P-158 (Lime Stabilized Subgrade) for inclusion in the upcoming paving contract Current version cites “latest edition” of IDOT Specs. Should reference the IDOT 2002 version Current version cites “latest edition” of IDOT Specs. Should reference the IDOT 2002 version Modify Spec. (as needed) to include cement as a possible admixture Modify Spec. (as needed) to include cement as a possible admixture Incorporate frost action and freeze-thaw potentials from Dempsey’s study (TN 26) as guidelines Incorporate frost action and freeze-thaw potentials from Dempsey’s study (TN 26) as guidelines Will construction be permitted outside the current April 15 – Sept 15 window? Will construction be permitted outside the current April 15 – Sept 15 window? Additional lime testing for different temperature conditions affecting curing and strength gain? Additional lime testing for different temperature conditions affecting curing and strength gain?

20 FY 07 Year 3 Project Tasks Task 3: Evaluate the 9L-27R runway/taxiway soil lime stabilization and (fly ash) modification for meeting the subgrade support (k-value) requirements The research team will support the activities of OMP in: Characterizing soils at finish grade elevation for “stabilization admixture selection” Characterizing soils at finish grade elevation for “stabilization admixture selection” Evaluating completed modification/stabilization effort Evaluating completed modification/stabilization effort Field Validation of completed pavement structure Field Validation of completed pavement structure

21 FY 07 Year 3 Project Tasks Task 4: Evaluate currently available geotechnical/subgrade data for the South Airfield of the O’Hare Airport with particular emphasis on the stockpiled soils Summarize technology and experiences from North Runway (9-27) and apply to the South Airfield Summarize technology and experiences from North Runway (9-27) and apply to the South Airfield Advise on the soil sampling needs and if considered essential, develop recommendations for additional soil exploration/sampling activities Advise on the soil sampling needs and if considered essential, develop recommendations for additional soil exploration/sampling activities Develop/conduct a laboratory testing program for soil treatment and subgrade support for the South Airfield Develop/conduct a laboratory testing program for soil treatment and subgrade support for the South Airfield

22 FY 07 Year 3 Project Tasks Task 4: Evaluate currently available geotechnical/subgrade data for the South Airfield of the O’Hare Airport with particular emphasis on the stockpiled soils Summarize technology and experiences from North Runway (9-27) and apply to the South Airfield Summarize technology and experiences from North Runway (9-27) and apply to the South Airfield Advise on the soil sampling needs and if considered essential, develop recommendations for additional soil exploration/sampling activities Advise on the soil sampling needs and if considered essential, develop recommendations for additional soil exploration/sampling activities Develop/conduct a laboratory testing program for soil treatment and subgrade support for the South Airfield Develop/conduct a laboratory testing program for soil treatment and subgrade support for the South Airfield

23 Project Schedule & Deliverables Technical Notes will be prepared and submitted to the OMP throughout the duration of this project to communicate specific findings and recommendations to OMP engineers as needed Technical Notes will be prepared and submitted to the OMP throughout the duration of this project to communicate specific findings and recommendations to OMP engineers as needed Several of the Project Tasks are already pursued simultaneously, and the specific delivery of results will be contingent upon availability of OMP data and other factors that depend on coordination with OMP Several of the Project Tasks are already pursued simultaneously, and the specific delivery of results will be contingent upon availability of OMP data and other factors that depend on coordination with OMP Continue to work with OMP on current and future subgrade soil support and stabilization needs for all O’Hare runways/taxiways. This will be in the form of sustained support for working with OMP on subgrade soil support issues Continue to work with OMP on current and future subgrade soil support and stabilization needs for all O’Hare runways/taxiways. This will be in the form of sustained support for working with OMP on subgrade soil support issues

24 Any Questions?

25 Group 1 Results

26 0 % Lime 5 % Lime W (%) Dry Density ( pcf ) W (%) Dry Density ( pcf ) 12.4115.3614109.81 14.1119.0616114.98 15.8114.8418.9110.23 18.3108.7422.4102.34 Moisture-Density (Std Proctor) Group 2 Results

27

28 DEMPSEY STUDY FINDINGS

29

30

31

32 TOTAL PVT THICKNESS – 40 INCHES

33

34

35

36

37 FROST LINE 46 INCHES 9-27 PAVEMENT

38 DATEFROST DEPTH (INCHES) DATEFROST DEPTH (INCHES ) 2-97461-0230 1-98282-0340 1-99432-0446 2-00371-0536 1-014712-0536 AVERAGE 39 INS 9-27 PAVEMENT SECTION

39

40


Download ppt "Co-PIs: Erol Tutumluer Marshall R. Thompson RA: Deb Mishra Subgrade Soil Support and Stabilization O’HARE Airport Modernization Research Project Research."

Similar presentations


Ads by Google