Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.

Similar presentations


Presentation on theme: "Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL."— Presentation transcript:

1 Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL

2 Southgrid Member Institutions Oxford RAL PPD Cambridge Birmingham Bristol HP-Bristol Warwick

3 Status at RAL PPD SL3 cluster on glite 3.0.1 CPUs: 66 2.8GHz Xeons 6.4TB of RAID disks (dcache) 24 VO’s supported!! Network monitoring Machine installed and running Currently Installing New Kit 52 dual core dual opterons 64TB of storage. Nortel switches with 10Gb/s capable uplink. Hope to get 10Gb/s link to RAL T1 this summer.

4 Status at Cambridge Currently glite_3.0.1 on SL3 CPUs: 42 2.8GHz Xeons 3.2 TB Storage Network monitoring box requested. Condor Batch System Lack of Condor support from LCG teams Problems installing experiment software with the VO sgm account as this does not map well to condoruser1 / 2. Currently overcome by local intervention but need a long term solution. Future Upgrades to CAMgrid in Autumn 06 could mean additional 160 KSI2K plus 4-5 TB disk storage

5 Status at Bristol Status –Running glite 3.0.1 on SL3 Existing resources –GridPP nodes plus local cluster nodes used to bring site on line. –Now have 16 WN cpu’s (This is an 8 fold increase since last gridpp) –Network monitoring box installed and running New resources –2TB storage increase in SE next week –University investment in hardware Includes CPU, high quality and scratch disk resources –Installation commences this summer (512 cores to be installed in August, 2048 by Jan 07) –1Gbps private link to RAL for the Grid Cluster next year Staff –New SouthGrid support / development post (GridPP / HP) being filled

6 Status at Birmingham Currently SL3 with glite_3.0.1 CPUs: 28 2.0GHz Xeon (+98 800MHz ) 1.9TB DPM installed Oct 2005 Babar Farm runs SL3 and Bristol farm integrated Running Pre Production Service Network monitoring box installed and running ALICE VO Box installed

7 Status at Oxford Currently glite_3.0.1 on SL305 72 WN cpus’s running CPUs: 88 2.8 GHz Total 3.0TB DPM storage on one server node and one pool node. Some further Air Conditioning Problems now resolved for Room 650, Second rack in overheating basement. Five dual 2.8GHz servers used for Southgrid Testzone, have been used for pre release testing of 2.7.0 and glite 3 Network monitoring box in place and running Oxford was the first Southgrid site to install glite 3 OPS VO enabled Also in talks with the Oxford CampusGrid and NGS

8 SouthGrid Q1/2 2006

9 SouthGrid Site Shares Q1/2 2006 Q4 2005

10 LHCb ATLAS Oxford Tier 2 GridPP Cluster June 2006 Biomed Queued jobs; Have just reduced biomed allocation as there are waiting LHC jobs. Running Jobs: glite_3.0.0 upgrade

11 RAL PPD Support more VO’s = Better Utilization

12 Oxford RALPPD Birmingham Bristol Cambridge SouthGrid Utilization 2005/2006

13 SC4 All sites now on gigabit Ethernet to at least the SE’s. All sites > 250Mbps in the throughput tests 4/5 sites have the network monitoring box installed and running, remaining site is expecting theirs soon. All sites now supporting the OPS VO

14 Stability, Throughput and Involvement SouthGrid continues to perform well, with good stability and functionality. Bristol PP additional nodes All five sites running glite 3 by 22 nd June Support for many VO’s across the Tier2 including non LHC VO’s such as Biomed, zeus, hone, ilc and pheno All sites SRM enabled (1 dcache, 4 dpm) by Oct 05 5 sites running an LFC

15 Summary & outlook South Grid continues to maintain good momentum, all sites are running the latest release and have SRM enabled se’s. SouthGrid was the joint first T2 to be running glite 3. The new Systems Administrator at Bristol, Winnie Lacesso, has helped progress at Bristol to be more rapid. RALPPD installing large upgrade Cambridge expecting upgrade in Autumn Bristol will have a percentage of the new Campus cluster Birmingham will have a percentage of the new Campus Cluster Oxford will be able to expand resources once the new computer room is built. Yves Coppens continues to provide valuable help across SouthGrid.