UNIT 3: Waste Management 4/24/07. Waste management Nothing can ever be “thrown away” In the US, urban areas produce 640 million kg of solid waste each.

Similar presentations


Presentation on theme: "UNIT 3: Waste Management 4/24/07. Waste management Nothing can ever be “thrown away” In the US, urban areas produce 640 million kg of solid waste each."— Presentation transcript:

1 UNIT 3: Waste Management 4/24/07

2 Waste management Nothing can ever be “thrown away” In the US, urban areas produce 640 million kg of solid waste each day –=1.6 sq. km of land to a depth of 3 m.

3 Waste management Three basic approaches: –A) dilute and disperse –B) concentrate and contain –C) reduce, recycle and reuse Integrated waste management: Complex management strategies including source reduction, recycling, composting, landfill, incineration that is designed for the specific needs of communities and environments

4 Waste management Types of waste: 1)Sewage 2) “normal” solid waste 3) Hazardous chemical waste & radioactive waste that cannot be disposed of in Class III landfills

5 Wastewater Treatment Mimics natural processes in wetlands 1) Remove solids 2) Digest organic matter through Aerobic bacteria Anaerobic bacteria 3) Wetland plants trap and concentrate pollutants 4) Sediment provides natural filters 5) Also provides a habitat

6 Basically a four-step process 1) settle the solids 2) let bacteria consume the organic waste 3) filter 4) disinfect (possibly)

7 Wastewater Treatment Rural areas: –Septic tank disposal systems Urban areas: –Centralized water-treatment plants & sewer system Primary treatment Secondary treatment Advanced treatment

8

9

10

11 Primary Wastewater Treatment Removes about 30-40% of pollutants A. Screening Removes grit (stones, sand, large particles) B. Sedimentation Remaining particulate matter settles out to form a mud called “sludge” C. Discharge or go on to next stage of treatment

12 Secondary Treatment Removes 90% of pollutants A. Waste water pumped through an Aeration tank Aerobic bacteria digest more organics B. Sedimentation Tank More sludge settles out Sludge sent to a digester Anerobic bacteria digest more organics Methane produced

13 Secondary Treatment C. Disinfection of wastewater Chlorine Ozone D. Discharge into surface waters or disposal wells or on to Advanced Treatment Note: Secondary does NOT remove all nutrients, heavy metals, solvents and pesticides

14 Advanced Treatment Removes 95% of the pollutants Targets nutrients, heavy metals, and synthetic chemicals Treated wastewater can be used as reclaimed water Techniques vary: –Filters –Chemical treatment

15

16 Where does the sludge go? 50-100 grams per person per day Sludge handling/disposal accounts for 25-50% of the cost –Sludge treatment:- Convert organics to a stable form Remove liquid to reduce volume Destroy harmful organisms Produce useful byproducts –soil

17 Sewage Treatment in San Diego & The International Border San Diego System: 2 million people over 550 square miles 190 million gallons a day

18 Collection System 1. Over 2,800 miles of pipes collect sewage 2. 84 collection system pump stations 3. 6 major “Metro” pump stations 4. 28 miles of interceptor pipes 5. 15 connecting agencies (Cities and municipalities) that utilize the Metro system for sewage disposal

19 Treatment System 1. Point Loma Treatment Plant (Advanced Primary treatment) 240 MGD Capacity. 2. North City Water Reclamation Plant, 30 MGD 3. South Bay Water Reclamation Plant, 15 MGD 4. San Pasqual Aqua Culture Plant, 1 MGD 5. Metro Biosolids Center. (Biosolids/Sludge processing)

20

21 Point Loma Wastewater Treatment Plant

22 SAN DIEGO AREA SEWERAGE HISTORY 1935: discharging nine million gallons of raw sewage through 22 outfalls. Nine of these empty into San Diego Bay. 1935: discharging nine million gallons of raw sewage through 22 outfalls. Nine of these empty into San Diego Bay. 1943 :first primary treatment plant at 32nd Street and Harbor Drive with a capacity of 14 million gallons a day (MGD). 1943 :first primary treatment plant at 32nd Street and Harbor Drive with a capacity of 14 million gallons a day (MGD). 1950: Original 32nd Street expanded to 40 MGD capacity. Pollution in San Diego Bay continues 1950: Original 32nd Street expanded to 40 MGD capacity. Pollution in San Diego Bay continues

23 SAN DIEGO AREA SEWERAGE HISTORY 1960:Water pollution in San Diego caused by sewage worst ever seen. Santee to the east is operating a state of the art reclamation plant. 1960:Water pollution in San Diego caused by sewage worst ever seen. Santee to the east is operating a state of the art reclamation plant. 1963: Metro system is put into operation. One primary treatment plant at Point Loma with a capacity of 88 MGD. Treated wastewater discharged 3 miles offshore into the Pacific Ocean. 1963: Metro system is put into operation. One primary treatment plant at Point Loma with a capacity of 88 MGD. Treated wastewater discharged 3 miles offshore into the Pacific Ocean. 1972: Northern areas of the city (Sorrento Valley, Poway and Del Mar) connect into the Metro system Clean Water Act is passed requiring San Diego to covert to secondary treatment by 1975. 1972: Northern areas of the city (Sorrento Valley, Poway and Del Mar) connect into the Metro system Clean Water Act is passed requiring San Diego to covert to secondary treatment by 1975.

24 SAN DIEGO AREA SEWERAGE HISTORY 1976: After studies for proposed secondary treatment and determining that primary treatment was effective, San Diego pursued a waiver for secondary treatment. 1976: After studies for proposed secondary treatment and determining that primary treatment was effective, San Diego pursued a waiver for secondary treatment. 1984: Waiver application still in process. San Diego studies natural waste treatment and completes the “Accelerated Projects” which was an expansion and improvement of the wastewater system to compensate for increased growth. Otay Water District opens a new water reclamation plant. 1984: Waiver application still in process. San Diego studies natural waste treatment and completes the “Accelerated Projects” which was an expansion and improvement of the wastewater system to compensate for increased growth. Otay Water District opens a new water reclamation plant. 1988: Subsequent lawsuits by the State and EPA. 1988: Subsequent lawsuits by the State and EPA.

25 SAN DIEGO AREA SEWERAGE HISTORY 1995 : Court battle concluded. San Diego receives a waiver for secondary treatment. Point Loma will continue to treat sewage at the advanced primary level. Treated effluent is discharged 5 miles offshore in 350 feet below the surface. 1995 : Court battle concluded. San Diego receives a waiver for secondary treatment. Point Loma will continue to treat sewage at the advanced primary level. Treated effluent is discharged 5 miles offshore in 350 feet below the surface. 1998: Over 1 billion dollars in improvements to San Diego’s system completed. North City Reclamation Plant and Metro Biosolids Center put into operation. Point Loma Treatment Plant capacity increased to 240 MGD. 1998: Over 1 billion dollars in improvements to San Diego’s system completed. North City Reclamation Plant and Metro Biosolids Center put into operation. Point Loma Treatment Plant capacity increased to 240 MGD.

26 SAN DIEGO AREA SEWERAGE HISTORY 2002: South Bay Water Reclamation Plant put into operation. Canyon sewage spills plague city and secondary treatment waiver issue resurfaces causing concern. 2002: South Bay Water Reclamation Plant put into operation. Canyon sewage spills plague city and secondary treatment waiver issue resurfaces causing concern.

27 South Bay Water Reclamation Plant 2411 Dairy Mart Road

28 Sewage flow and pollution do not respect international borders Sewage flow and pollution do not respect international borders Border Issues

29 Mesa/canyon topography

30 Tijuana River Watershed

31 Tijuana River

32

33 Population Growth

34

35 INTERNATIONAL WASTEWATER TREATMENT PLANT INTERNATIONAL BOUNDARY AND WATER COMMISSION

36 Financing the San Diego Plant U.S. federal government $239 million U.S. federal government $239 million Mexico $16 million Mexico $16 million City of San Diego $88-$140 million City of San Diego $88-$140 million State of California $5.3 million State of California $5.3 million

37 Groundwater Pollution and Treatment Saltwater intrusion  More than half of the world’s population lives in or near the coastal zones  GW pollution from saltwater intrusion is not a local isolated problem  Causes major water supply problems in NY, FL, CA  Case History: Long Island

38

39 12_T01

40 GW Treatment

41

42

43

44

45

46

47

48

49

50

51

52 What is MTBE? (methyl tertiary butyl ether) A gas additive contaminating drinking water

53 History of MTBE? 1970 MTBE replaced lead in gasoline Clean Air Act of 1990 mandated MTBE in gas 4.5 billion gallons of MTBE have been used each year Discovered health risks in 1997

54 Health Risks of MTBE Dizziness Rashes Swelling Respiratory problems Diarrhea Caused cancer in research rats and mice

55 What are the concerns with MTBE? Soluble in water Degrades slowly Does not readily bind to soil particles Resists natural degradation travels quick and easy through ground water

56 Concentration of MTBE? For every 10 gallons of gas there is 1 gallon of MTBE 1 cup of MTBE contaminate a reservoir 360ft wide, 15ft deep holding 5 million gallons of water


Download ppt "UNIT 3: Waste Management 4/24/07. Waste management Nothing can ever be “thrown away” In the US, urban areas produce 640 million kg of solid waste each."